In the Element Properties dialog, notice that the Phase Created value is New Construction, and<br />

the Phase Demolished value is None. These values let you assign creation and demolition phases<br />

in a timeline. You can also use the Demolition tool to select building elements for demolition.<br />

7 Click Cancel.<br />

8 On the Basics tab of the Design Bar, click Modify to clear the command.<br />

Add and edit phases<br />

9 Click Settings menu ➤ Phases.<br />

10 In the Phasing dialog, on the Project Phases tab, click the New Construction field.<br />

11 Enter Phase 1 (south).<br />

All building objects that were assigned to New Construction are now assigned to Phase 1 (south)<br />

because you changed the phase name.<br />

12 Under Insert, click After, and enter Phase 2 (north) under Name.<br />

The phases are on a timeline with later phases lower on the list, so Phase 1 and Phase 2 occur<br />

after the Existing phase.<br />

13 Click in the Description fields for each phase, and enter the following text:<br />

■ Existing: Existing building<br />

■ Phase 1 (south): Existing building with new steelwork and demolished walls<br />

■ Phase 2 (north): New building with steelwork and exterior panel wall<br />

14 Click OK.<br />

There are now 3 phases in your project: Existing, Phase 1 (south), and Phase 2 (north). All of<br />

the building elements in the project are currently assigned to Phase 1 (south).<br />

Assign selected building elements to the Existing phase<br />

15 In the Project Browser, expand 3D Views, and double-click 3D.<br />

16 Click View menu ➤ View Properties.<br />

17 In the Element Properties dialog, scroll down the list of Instance Parameters until you see the<br />

Phasing heading.<br />

The Phase value is Phase 1 (south) and the Phase filter is Show All, which means that work<br />

assigned to Phase 1 (south), existing earlier phases, demo, or temporary work (created and<br />

demolished in same phase), is visible in this view.<br />

18 Select Show New for Phase Filter, and click OK.<br />

Now you are seeing only work that is new to Phase 1 (south) of the project. You do not see a<br />

change in the graphics because all the building elements are new to Phase 1 (south). With the<br />

phase Filter set to Show New, as you change selected building elements to the existing phase,<br />

you will see a visual confirmation of the change as the building elements disappear from the<br />

view.<br />

Phasing Your Model | 647