07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

t—���������2x—�—�2e��2ƒ�—���� x€vGf‚eg2PHHS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

€�������2„�2h—��<br />

Jacksonville Naval Air Station (NAS) maintains and operates<br />

facilities and provides services and materials to support aviation<br />

activities and aircraft overhaul operations. EPA placed the<br />

installation on the NPL in November 1989, and the installation<br />

signed a federal facility agreement (FFA) in October 1990. In<br />

2005, the BRAC Commission recommended Jacksonville NAS<br />

for realignment. The installation includes the following site<br />

types: fire fighting training areas, waste storage and disposal<br />

areas, transformer storage areas, radioactive-waste disposal<br />

areas, and other miscellaneous support and maintenance<br />

areas. Typical operations have generated solvents, sludge<br />

(from on-site treatment plants), and low-level radioactive waste,<br />

which have migrated into nearby soil and local groundwater<br />

supplies. The installation's technical review committee, which<br />

formed in FY88, was converted to a Restoration Advisory Board<br />

in FY95. In FY91, the installation completed its community<br />

relations plan and established an administrative record and<br />

information repository. The installation completed 5-year<br />

reviews in FY01 and FY05.<br />

Jacksonville NAS has identified 84 sites, including 55 CERCLA<br />

sites, 24 underground storage tank (UST) sites, and 5 RCRA<br />

solid waste management units. The installation has completed<br />

Records of Decision (RODs) for Operable Units (OUs) 2 and 3,<br />

Point Sources of Contamination (PSCs) 11, 16, 21, 46, and 51.<br />

The installation also completed no further action (NFA)<br />

designation for USTs 13 and 17. The cleanup progress at<br />

Jacksonville NAS for FY02 through FY05 is detailed below.<br />

In FY02, the installation completed a site assessment report<br />

(SAR) for UST 14. The remedial action (RA) for PSCs 11<br />

(Building 780) and 48, and UST 15 continued. RAs began for<br />

PSCs 11 (Areas B, C, D) and 15 (Area G), and UST 14. The<br />

Navy completed an inventory of all Military Munitions Response<br />

Program (MMRP) sites. No MMRP sites were identified at this<br />

installation.<br />

In FY03, Jacksonville NAS completed SARs at the Petroleum<br />

Contaminated Areas (PCAs) 5, 18, 19, 23, 22I, and completed<br />

soil excavation at PCAs 5 and 14. The installation continued the<br />

RA for PSCs 11 (Building 780 and Area B), 15 (Area G), and<br />

48; PCAs 4, 14, and 16; and USTs 14 and 15. The installation<br />

Navy<br />

pvRIUHHPRRIPHH<br />

QDVPH2—���<br />

w—���—��2—��2����—��2�—�������Y2�������2�������2—��2�—����—��2<br />

��2�������2—��—����2—��������2—��2—���—��2�����—��2����—�����<br />

QIFHPY2��—��2��2x€v2��2x����˜��2IWVW<br />

ppe2������2��2y��˜��2IWWH<br />

‡—���2��������D2—�����D2�—����D2��—��2���—��D2€yv�D2<br />

���E�����2�—���—����2�—����D2����D2�—����D2€gf�D2���������D2<br />

�������D2�—�����������<br />

2w���—2e������X<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62WHFH2�������<br />

2i��F2g„g2@g���2‰�—�AX 62PHFQ2�������@p‰2PHPIA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIQGp‰2PHIQ<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

completed the remedial investigation/feasibility study (RI/FS) for<br />

PSCs 46 and 51.<br />

In FY04, the installation completed an RI/FS for PSCs 52 and<br />

11 (Areas A and E). The installation completed the treatability<br />

studies (TSs) for PCAs 4, 14, and 16. The 5-year review<br />

progressed. The installation added and approved a site for the<br />

MMRP.<br />

In FY05, Jacksonville NAS completed RODs for PSCs 46 and<br />

51. The installation completed the 5-year review and completed<br />

optimizations of PSCs 11 (Building 780), 26, and 48 (Building<br />

106). The installation continued RAs at PSC 46 and continued<br />

a TS at PSC 47. Lastly, the installation received NFA status on<br />

PCA 14. Jacksonville NAS developed the cost to complete<br />

cleanup for the identified MMRP site.<br />

p‰HT2s‚€2€�������<br />

Jacksonville NAS completed the ROD for PSC 11 Area A. The<br />

installation also completed a proposed plan (PP) for PSCs 11<br />

and 52.<br />

Regulatory issues delayed the ROD for PSC 52. Further<br />

investigation of the contamination plume was necesary, which<br />

caused delay in the TS at PSC 47. Funding issues delayed<br />

interim excavation removals at PSC 46.<br />

p‰HT2ww‚€2€�������<br />

The installation initiated site assessments for seven potential<br />

MMRP sites. A draft final preliminary assessment (PA) report<br />

was also issued by the Navy.<br />

€�—�2��2e����<br />

Plan of action items for Jacksonville Naval Air Station are<br />

grouped below according to program category.<br />

22222s‚€<br />

0 Complete TS at PSC 47 in FY07.<br />

0 Complete PP and ROD at PSC 47 in FY07.<br />

0 Excavate contaminated soils at PCA 16 and PSC<br />

46 in FY07.<br />

0 Initiate interim measure at PSC 47 in FY07.<br />

0 Complete ROD for PSC 52 in FY07.<br />

22222ww‚€<br />

0 Initiate site inspection for MMRP unexploded<br />

ordnance Site 1 in FY07.<br />

0 Receive approval for cleanup of new MMRP<br />

sites discovered during PA in FY07.<br />

t—���������D2p�����—<br />

M-102

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!