Naval Facilities Engineering Command Northwest manages all<br />
<strong>Installation</strong> Restoration Program (IRP) and Military Munitions<br />
Response Program (MMRP) activities at Bremerton Naval<br />
Complex (BNC) and Jackson Park Housing Complex (JPHC).<br />
Most of BNC, which includes the Puget Sound Naval Shipyard,<br />
is built on contaminated fill material. Metals and<br />
petroleum/oil/lubricants (POLs) are the primary contaminants.<br />
Initial assessment studies identified six sites for BNC and eight<br />
at JPHC. The main sources of contamination are past<br />
operations, such as cleaning and demilitarization of ordnance,<br />
and ship construction, maintenance, and demolition. JPHC and<br />
BNC formed technical review committees in FY91 and FY92,<br />
respectively. Both were converted to Restoration Advisory<br />
Boards in FY94. Both installations were placed on the NPL in<br />
May 1994. An interagency agreement (IAG) was signed for<br />
BNC in 1998, and another was signed for JPHC in FY05. In<br />
2005, the BRAC Commission recommended Puget Sound<br />
Naval Shipyard for realignment. A 5-year review was completed<br />
for BNC in FY02, and for JPHC in FY05.<br />
To date, 37 sites have been identified at these installations.<br />
BNC completed Records of Decision (RODs) for Operable Unit<br />
(OU) A, OU BM (Marine), OU BT (Terrestrial), OU D, and OU<br />
Naval Supply Center (NSC). JPHC completed a ROD for OU 1.<br />
Puget Sound Naval Shipyard transferred approximately two<br />
acres of BNC OU D property to the City of Bremerton. The<br />
cleanup progress at Puget Sound Naval Shipyard for FY02<br />
through FY05 is detailed below.<br />
In FY02, the BNC remedial action (RA) construction for OU BM<br />
was completed; finalization of the RA-operation (RA-O) plan<br />
was held pending continued investigation of post construction<br />
contamination. BNC completed the feasibility study (FS) and<br />
proposed plan (PP) for OU BT. It also initiated the OU BT ROD<br />
negotiations and the remedial design (RD). The facilitywide<br />
petroleum management plan was completed. The facility<br />
completed the draft 5-year review report for BNC. JPHC<br />
completed the RA for OU 1. The Navy identified two MMRP<br />
sites at JPHC: OU 3T JPHC and OU 3M. The installation<br />
completed an archive search report for JPHC.<br />
In FY03, BNC completed negotiations with regulatory and<br />
resources agencies for the OU BM RA-O monitoring plan. The<br />
Navy<br />
‡eHIUHHPQRIVHH2—��2‡eHIUHHPQRPTHH<br />
IDQWP2—���<br />
€������2�������—�2�������2���2—�������2�����2—��2������2�—��Y2<br />
�������2—���������2����2��2����������D2�����—��D2—��2�����2<br />
�—���Y2�������2�������2���2—����2����2�—������2—��2��—���—��2<br />
���2�����˜��2���������<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
seq2������2���2f��������2x—�—�2g������2��2IWWVY2seq2������2<br />
���2t—����2€—��2r������2g������2��2PHHR<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
2i��F2g„g2@g���2‰�—�AX<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX<br />
2p���E‰�—�2‚�����2ƒ�—���X<br />
installation initiated biological and sediment monitoring. The OU<br />
BM response action characterization requirements were<br />
negotiated and characterization of impacted sediment was<br />
completed. The installation also completed remedy selection,<br />
and completed the draft final ROD for OU BT and the RD for<br />
OU BT remedial construction. The installation initiated removal<br />
actions and a long-term management (LTM) plan for OU BT.<br />
The installation completed a focused remedial investigation<br />
(RI)/FS and capping removal action for OU D. The installation<br />
continued monitoring and a remedy inspection at OUs A, C,<br />
and NSC, and initiated remedy maintenance at OU A. At JPHC,<br />
the installation continued ROD-required LTM at OU 1. The draft<br />
No Further Action PP for OU 2 was submitted to regulators.<br />
The OU 3M preliminary assessment and site inspection (PA/SI)<br />
was completed. The installation completed OU 3T JPHC PA/SI,<br />
munition hazard assessment, sited temporary storage munition<br />
magazines, and initiated the OU 3T RI. The installation<br />
completed approximately 30 percent of the Phase I fieldwork.<br />
In FY04, BNC completed the OU D focused RI/FS and capping<br />
removal action, the OU BT ROD and construction of the<br />
pavement cap and shoreline stabilization remedy components.<br />
The installation also finalized the OU BT monitoring plan and<br />
well installation, and issued an explanation of significant<br />
differences and completed OU BM response action. The<br />
installation also conducted ROD-required monitoring for all<br />
applicable BNC OUs and JPHC OU 1. The installation<br />
continued discussions with the regulators regarding the JPHC<br />
OU 2 PP, and completed OU 3T Phase I RI fieldwork. The<br />
installation completed side scan sonar and bathymetric survey<br />
for JPHC OU 3M.<br />
In FY05, Puget Sound Naval Shipyard continued LTM at BNC<br />
OUs A, C, and NSC. The installation also completed the final<br />
component of the shoreline erosion control system and<br />
vegetated cap at BNC OU BT. BNC conducted RA-O sampling<br />
at the OU BM. The Navy signed a ROD for OU D and began<br />
implementing the remedy. JPHC continued LTM and conducted<br />
an additional investigation to address benzene seep for OU 1.<br />
JPHC identified free product in new deep wells. JPHC<br />
completed geophysical data interpretation and a field summary<br />
report at Site OU 3T for RI Phase I. The Navy completed draft<br />
RI/FS work plans for Site OU 3M.<br />
r�—��2���—��D2†yg�D2€yv�D2����D2�—����D2��������D2����������2<br />
��˜���D2—���D2������2����—��D2����—��2��������D22��������2<br />
�����<br />
q������—���D2����—�2�—���D2��������D2����<br />
62IUVFI2�������<br />
62VPFS2�������@p‰2PHQIA<br />
p‰2PHIRGp‰2PHIQ<br />
g��������2—��2��—����<br />
u���—�2g�����D2‡—��������<br />
p‰HT2s‚€2€�������<br />
Puget Sound Naval Shipyard transferred approximately two<br />
acres of BNC OU D property to the City of Bremerton. In<br />
addition, the installation initiated partnering and facilitated<br />
meetings with regulators for JPHC sites. The Navy continued<br />
LTM and initiated pilot testing to address benzene seep free<br />
product at JPHC OU 1, as well as continued sampling,<br />
operation, and maintenance for BNC LTM. The cost of<br />
completing environmental restoration has changed significantly<br />
due to technical issues.<br />
Regulatory issues delayed the PP and ROD for JPHC OU 2.<br />
p‰HT2ww‚€2€�������<br />
Regulatory issues delayed JPHC Site OU 3T RI Phase II<br />
fieldwork. Procedural issues delayed the RI/FS fieldwork for<br />
JPHC OU 3M.<br />
€�—�2��2e����<br />
Plan of action items for Puget Sound Naval Shipyard are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Update the LTM program for OUs A and NSC in<br />
FY07.<br />
0 Finalize action plan for OU C in FY07.<br />
0 Continue LTM and initiate focused FS to<br />
address benzene seep plume at JPHC OU 1 in<br />
FY07.<br />
0 Resolve informal dispute, and finalize PP and<br />
ROD for JPHC OU 2 in FY07.<br />
0 Complete RA-O monitoring for OU BM and<br />
evaluate sediment natural recovery trend in<br />
FY07.<br />
22222ww‚€<br />
0 Resolve formal dispute with EPA regarding<br />
JPHC OU 3T Phase II sampling in FY07.<br />
0 Complete Phases I and II of RI/FS for OU 3M<br />
in FY07-FY08.<br />
0 Complete JPHC OU 3T Phase II RI fieldwork in<br />
FY08.<br />