Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
e�—˜—�—2e���2e���������2€�—�� x€vGf‚eg2IWVV<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Studies conducted at Alabama Army Ammunition Plant (AAP)<br />
since FY83 identified various sites as potential sources of<br />
contaminants. Prominent site types include: a former<br />
ammunition production and burning ground for explosives;<br />
industrial wastewater conveyance systems, ditches, and a red<br />
water storage basin; landfills; underground storage tanks;<br />
polychlorinated biphenyl (PCB)-containing transformers; and a<br />
former coke oven. The installation has six operable units in<br />
Area A and Area B. The groundwater, surface water, sediment,<br />
and soil are contaminated with nitroaromatic compounds, heavy<br />
metals, and explosives waste. EPA placed the installation on<br />
the NPL in July 1987, and the installation signed a federal<br />
facility agreement (FFA) in December 1989. In FY94, the Army<br />
formed a BRAC cleanup team. During FY95, the Army<br />
attempted to establish a Restoration Advisory Board (RAB), but<br />
received no applications for RAB membership.<br />
The Army has signed three Records of Decision (RODs) to<br />
date. The installation closed 35 groundwater monitoring wells in<br />
FY99. The Army completed the early transfer of property to the<br />
City of Childersburg in FY03. The cleanup progress at Alabama<br />
AAP for FY02 through FY05 is detailed below.<br />
In FY02, the installation submitted the draft final soil feasibility<br />
study (FS) for regulatory review and the groundwater remedial<br />
investigation (RI) work continued. Final fieldwork, to include an<br />
off-site potable well survey, was underway. The process for<br />
early transfer of the remaining property to the City of<br />
Childersburg continued. The installation completed the finding<br />
of suitability for early transfer for Area B and closed<br />
groundwater monitoring wells in Area A. The Army initiated an<br />
inventory of closed, transferred, and transferring (CTT) ranges<br />
and sites with unexploded ordnance, discarded military<br />
munitions, or munitions constituents.<br />
In FY03, the installation completed the early transfer of property<br />
to the City of Childersburg. The installation completed a potable<br />
well survey and groundwater RI fieldwork. The Army completed<br />
the CTT ranges and sites inventory that identified no Military<br />
Munitions Response Program (MMRP) sites at this installation.<br />
The technical review committee discussed the soil and<br />
groundwater past actions, as well as future documented<br />
actions.<br />
Army<br />
evRPIQVPHHHVHH<br />
PDPQS2—���<br />
w—���—�����2����������<br />
QTFVQY2��—��2��2x€v2��2t���2IWVU<br />
ppe2������2��2h���˜��2IWVW<br />
x����—���—��2��������D2��—��2���—��D2���������E���—���2<br />
�—����<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62TPFP2�������<br />
2i��F2g„g2@g���2‰�—�AX 62RFP2�������@p‰2PHQTA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
In FY04, the installation submitted the draft groundwater RI for<br />
regulatory review, along with further site sampling of the South<br />
Georgia Road site. The installation completed the soil FS.<br />
In FY05, the installation completed the draft soils proposed<br />
plan.<br />
p‰HT2s‚€2€�������<br />
Alabama AAP prepared a soils PP for regulatory review and<br />
completed a work plan addendum for additional groundwater<br />
sampling.<br />
Technical issues delayed the groundwater RI/FS and ROD.<br />
p‰HT2ww‚€2€�������<br />
The Army has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Alabama Army Ammunition Plant are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete Area B Soils ROD in FY07.<br />
0 Complete groundwater RI/FS and ROD in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />