Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
wq����2e��2p���2f—�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
McGuire Air Force Base (AFB) provides quick-response airlift<br />
capabilities for placing military forces into combat situations.<br />
EPA placed the installation on the NPL in October 1999. In<br />
2005, the BRAC Commission recommended McGuire AFB for<br />
realignment. Sites include landfills, waste piles, fire training<br />
areas, hazardous waste storage areas, and spill sites. The<br />
installation formed a Restoration Advisory Board (RAB) in 1999.<br />
Forty-two sites have been identified at the installation to date.<br />
Six sites were identified at the Boeing Michigan Aeronautical<br />
Research Center (BOMARC) facility, a remote location under<br />
McGuire AFB jurisdiction. The cleanup progress at McGuire<br />
AFB for FY02 through FY05 is detailed below.<br />
In FY02, the free product recovery equipment began operation<br />
at the Bulk Fuel Storage Area (ST 09). The remedial<br />
investigation (RI) phase to delineate the extent of the<br />
trichloroethylene (TCE) groundwater plume at Site OT 16<br />
continued. The basewide background study was completed and<br />
a draft report was submitted. The report was under revision<br />
based on regulators' comments. The cleanup of the BOMARC<br />
missile accident site (RW 01) began. About 50 percent of the<br />
contaminated soil and debris was removed and shipped out for<br />
disposal. The installation held two RAB meetings, two<br />
partnering (Tier I) meetings with regulators, action officers, and<br />
base personnel; one Tier II meeting with Tier I members'<br />
superiors; and one Tier III meeting.<br />
In FY03, the installation completed operation of the free product<br />
recovery equipment at pilot scale for Site ST 09. The basewide<br />
background study report was also finalized. Based on an<br />
environmental site inspection, 19 former areas of concern were<br />
added as new sites, resulting in a total of 42 sites at the<br />
installation. Two RAB meetings were held. Seven partnering<br />
(Tier I/II) meetings were held with regulators, action officers,<br />
and base personnel. Three Tier III conference calls were held.<br />
In FY04, the installation began RI work plan development at<br />
Landfills (LFs) 02 and 03. In addition, the installation completed<br />
soil removal at the BOMARC missile accident site (RW 01) and<br />
interim remedial action Phase I soil removal at Fire Protection<br />
Training Area 3 (FT 13). McGuire AFB continued the RI study<br />
for the TCE groundwater plume delineation and source<br />
Air Force<br />
xtPSUIVPRHIVHH<br />
QDSHH2—���<br />
€������2����E��������2—������2—�—˜�������2���2��—���2�����—��2<br />
�����2����2��˜—�2����—�����<br />
RUFPHY2��—��2��2x€v2��2y��˜��2IWWW<br />
ppe2�����2������—����<br />
†yg�D2ƒ†yg�D2€er�D2f„iˆD2„€rD2���—��D2€gf�D2„giD2<br />
���������<br />
q������—���D2��������D2����<br />
2p������2��2h—��X<br />
62SSFU2�������<br />
2i��F2g„g2@g���2‰�—�AX 62ITSFU2�������@p‰2PHQPA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
investigation at Site OT 16, as well as for the Spill Site at<br />
Building 2227 (SS 24), and document preparation for LF 03.<br />
The installation held two RAB meetings, one Tier I/II partnering<br />
meeting and one Tier III partnering meeting.<br />
In FY05, McGuire AFB completed RI fieldwork at LF 03 and an<br />
RI at Building 2227 (SS 24). The installation initiated a<br />
comprehensive basewide conceptual site model (CSM),<br />
ecological study, and background study. The Department of<br />
Energy led a survey at the BOMARC missile accident site (RW<br />
01) and identified numerous discrete particles of contamination.<br />
McGuire AFB expanded the fence line around the BOMARC<br />
facility to contain some of the identified particles. The<br />
installation held two RAB meetings, one Tier I/II partnering<br />
meeting, and one Tier I/II/III partnering meeting. The Air Force<br />
updated its Military Munitions Response Program (MMRP)<br />
inventory. No MMRP sites were identified at this installation<br />
during the inventory development.<br />
p‰HT2s‚€2€�������<br />
McGuire AFB completed additional site surveys and initiated<br />
particles cleanup of the Class 1 cleanup area at Site RW 01.<br />
The Air Force continued work on the comprehensive basewide<br />
CSM, ecological study, and background study. The installation<br />
initiated RIs at the LF Operable Unit (OU) (LF 02/Site WP 21,<br />
LF 19, and LF 20) and at Site ST 07. McGuire AFB completed<br />
the RI study at LF 03. Additionally, McGuire AFB continued the<br />
basewide ecological study, which included flyover surveys, a<br />
full basewide wetland delineation, and other key ecological<br />
components. The cost of completing environmental restoration<br />
has changed significantly due to changes in estimating criteria.<br />
The installation began fieldwork at Site OT 16; however,<br />
regulatory issues delayed final completion. Regulatory issues<br />
also delayed initiation of an RI at Site ST 09.<br />
McGuire AFB held one Tier I/II partnering meeting and two RAB<br />
meetings. The base also initiated the RAB Journal. Two RAB<br />
mailings were distributed.<br />
p‰HT2ww‚€2€�������<br />
The Air Force has identified no MMRP sites at this installation.<br />
f���������2g�����D2x��2t�����<br />
€�—�2��2e����<br />
Plan of action items for McGuire Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Initiate RIs at 16 sites arranged in 4 OUs in<br />
FY07.<br />
0 Continue RIs at the LF OU and Site ST 07 in<br />
FY07.<br />
0 Complete RIs at Sites OT 16 and SS 24, and<br />
initiate feasibility studies (FSs) for both<br />
sites in FY07.<br />
0 Initiate FS for LF 03/Site ST 07 OU in FY07.<br />
0 Initiate RI at Site ST 09 in FY 07.<br />
0 Initiate and complete a rapid site<br />
characterization on 11 sites to assist with<br />
performance-based contract development in<br />
FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
M-128