07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

w��—���˜���2x—�—�2s��������2g������2€����<br />

p�������2w��—���˜���2ƒ����92€—���2g������2g�����<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

Mechanicsburg Naval Inventory Control Point, currently Naval<br />

Support Activity, provides inventory management and supply<br />

support for weapons systems. Historical defense industrial and<br />

inventory disposal operations have caused contamination at<br />

this installation. EPA placed the installation on the NPL in May<br />

1994, and the installation signed a federal facility agreement<br />

(FFA) in FY05. A technical review committee, formed in FY88,<br />

was converted to a Restoration Advisory Board in FY95. The<br />

installation placed its administrative record on CD-ROM and<br />

completed a community relations plan in FY99. The installation<br />

completed a 5-year review in FY04.<br />

Environmental investigations conducted at the installation have<br />

identified 15 CERCLA sites. The installation has completed a<br />

Record of Decision (ROD) for Sites 1 and 3. In addition, no<br />

further action (NFA) documents have been completed for Sites<br />

2, 4, 7, 8, 12, 13, 14, and 15, as well as 49 lower priority areas<br />

of concern (AOCs). The cleanup progress at Mechanicsburg<br />

Naval Inventory Control Point for FY02 through FY05 is detailed<br />

below.<br />

In FY02, the installation finalized NFA documents for Sites 2, 4,<br />

and Site 8 soil. AOC 21 underwent an expanded site inspection<br />

(SI) and NFA decision documents (DDs) were completed for<br />

AOCs 22 and 48. The installation completed a groundwater<br />

remedial investigation (RI) for Site 3. The installation also<br />

completed the basewide ecological risk assessment and the SI<br />

for four AOCs. The Navy completed an inventory of all Military<br />

Munitions Response Program (MMRP) sites. One MMRP site<br />

was identified at this installation.<br />

In FY03, the installation completed the groundwater feasibility<br />

study (FS) for Site 9 and the final groundwater FS for Site 3.<br />

The installation completed the soil removal at AOC 38. The<br />

installation completed a draft 5-year review.<br />

In FY04, the installation completed the 5-year review and a site<br />

management plan. The installation completed the Site 3<br />

proposed remedial action (RA) plan (PRAP) and pilot study.<br />

NFA DDs were completed for AOCs 36-A and 38. A Site 9 FS<br />

and fieldwork for a bioremediation pilot study were completed.<br />

The installation completed a time-critical action memorandum<br />

Navy<br />

€eQIUHHPPIHRHH<br />

VPR2—���<br />

€������2���������2�—�—������2—��2������2�������2���2<br />

��—����2�������<br />

SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />

ppe2������2��2p‰HS<br />

€gf�D2��—��2���—��D2���������D2†yg�D2ƒ†yg�D2������<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62QIFU2�������<br />

2i��F2g„g2@g���2‰�—�AX 62UFW2�������@p‰2PHISA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHII<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������<br />

and soil removal for Site 5. Due to the additional soil<br />

contamination, Site 5 was reopened and the contractor was<br />

tasked to perform an RI.<br />

In FY05, Mechanicsburg Naval Inventory Control Point signed<br />

the FFA. The installation completed the Site 3 ROD and<br />

completed the Site 5 RI work plan and fieldwork.<br />

p‰HT2s‚€2€�������<br />

Mechanicsburg Naval Inventory Control Point completed the<br />

RI/FS report and an engineering evaluation and cost analysis<br />

(EE/CA) for Site 5. The installation also completed an EE/CA<br />

for Site 11. The Navy completed the performance monitoring of<br />

the Site 3 chemical oxidation pilot study and issued the draft<br />

report.<br />

Technical issues delayed the Site 9 PRAP and ROD, in order<br />

for the installation to reassess the potential remedial<br />

alternatives and perform an explanation of significant<br />

differences (ESD).<br />

p‰HT2ww‚€2€�������<br />

The Navy conducted no MMRP actions at this installation.<br />

€�—�2��2e����<br />

Plan of action items for Mechanicsburg Naval Inventory Control<br />

Point are grouped below according to program category.<br />

22222s‚€<br />

0 Complete RA at Site 11 in FY07.<br />

0 Initiate RA at Site 5 in FY07.<br />

0 Initiate net environmental benefit analysis<br />

and FS addendum for Site 9 to develop<br />

alternative RAs in FY07.<br />

0 Initiate ESD and FS addendum for Site 3<br />

groundwater to develop alternative RAs in<br />

FY07.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

M-129<br />

x€v<br />

w��—���˜���D2€�������—��—

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!