Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
w��—���˜���2x—�—�2s��������2g������2€����<br />
p�������2w��—���˜���2ƒ����92€—���2g������2g�����<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Mechanicsburg Naval Inventory Control Point, currently Naval<br />
Support Activity, provides inventory management and supply<br />
support for weapons systems. Historical defense industrial and<br />
inventory disposal operations have caused contamination at<br />
this installation. EPA placed the installation on the NPL in May<br />
1994, and the installation signed a federal facility agreement<br />
(FFA) in FY05. A technical review committee, formed in FY88,<br />
was converted to a Restoration Advisory Board in FY95. The<br />
installation placed its administrative record on CD-ROM and<br />
completed a community relations plan in FY99. The installation<br />
completed a 5-year review in FY04.<br />
Environmental investigations conducted at the installation have<br />
identified 15 CERCLA sites. The installation has completed a<br />
Record of Decision (ROD) for Sites 1 and 3. In addition, no<br />
further action (NFA) documents have been completed for Sites<br />
2, 4, 7, 8, 12, 13, 14, and 15, as well as 49 lower priority areas<br />
of concern (AOCs). The cleanup progress at Mechanicsburg<br />
Naval Inventory Control Point for FY02 through FY05 is detailed<br />
below.<br />
In FY02, the installation finalized NFA documents for Sites 2, 4,<br />
and Site 8 soil. AOC 21 underwent an expanded site inspection<br />
(SI) and NFA decision documents (DDs) were completed for<br />
AOCs 22 and 48. The installation completed a groundwater<br />
remedial investigation (RI) for Site 3. The installation also<br />
completed the basewide ecological risk assessment and the SI<br />
for four AOCs. The Navy completed an inventory of all Military<br />
Munitions Response Program (MMRP) sites. One MMRP site<br />
was identified at this installation.<br />
In FY03, the installation completed the groundwater feasibility<br />
study (FS) for Site 9 and the final groundwater FS for Site 3.<br />
The installation completed the soil removal at AOC 38. The<br />
installation completed a draft 5-year review.<br />
In FY04, the installation completed the 5-year review and a site<br />
management plan. The installation completed the Site 3<br />
proposed remedial action (RA) plan (PRAP) and pilot study.<br />
NFA DDs were completed for AOCs 36-A and 38. A Site 9 FS<br />
and fieldwork for a bioremediation pilot study were completed.<br />
The installation completed a time-critical action memorandum<br />
Navy<br />
€eQIUHHPPIHRHH<br />
VPR2—���<br />
€������2���������2�—�—������2—��2������2�������2���2<br />
��—����2�������<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2������2��2p‰HS<br />
€gf�D2��—��2���—��D2���������D2†yg�D2ƒ†yg�D2������<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62QIFU2�������<br />
2i��F2g„g2@g���2‰�—�AX 62UFW2�������@p‰2PHISA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHII<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
and soil removal for Site 5. Due to the additional soil<br />
contamination, Site 5 was reopened and the contractor was<br />
tasked to perform an RI.<br />
In FY05, Mechanicsburg Naval Inventory Control Point signed<br />
the FFA. The installation completed the Site 3 ROD and<br />
completed the Site 5 RI work plan and fieldwork.<br />
p‰HT2s‚€2€�������<br />
Mechanicsburg Naval Inventory Control Point completed the<br />
RI/FS report and an engineering evaluation and cost analysis<br />
(EE/CA) for Site 5. The installation also completed an EE/CA<br />
for Site 11. The Navy completed the performance monitoring of<br />
the Site 3 chemical oxidation pilot study and issued the draft<br />
report.<br />
Technical issues delayed the Site 9 PRAP and ROD, in order<br />
for the installation to reassess the potential remedial<br />
alternatives and perform an explanation of significant<br />
differences (ESD).<br />
p‰HT2ww‚€2€�������<br />
The Navy conducted no MMRP actions at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Mechanicsburg Naval Inventory Control<br />
Point are grouped below according to program category.<br />
22222s‚€<br />
0 Complete RA at Site 11 in FY07.<br />
0 Initiate RA at Site 5 in FY07.<br />
0 Initiate net environmental benefit analysis<br />
and FS addendum for Site 9 to develop<br />
alternative RAs in FY07.<br />
0 Initiate ESD and FS addendum for Site 3<br />
groundwater to develop alternative RAs in<br />
FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
M-129<br />
x€v<br />
w��—���˜���D2€�������—��—