Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
p���2h��2f‚eg f‚eg2IWWS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
In July 1995, the BRAC Commission recommended the<br />
realignment of Fort Dix and the transfer of excess property.<br />
Prior to being slated for closure, Fort Dix BRAC properties<br />
supported training and mobilization efforts for the Army. The<br />
Army signed a federal facility agreement (FFA) in 1991. In<br />
FY95, the installation formed a BRAC cleanup team and began<br />
developing an Environmental Baseline Survey and a BRAC<br />
cleanup plan, which were both completed in FY97. The<br />
installation formed a Restoration Advisory Board (RAB) in<br />
FY96.<br />
The cleanup progress at Fort Dix BRAC for FY02 through FY05<br />
is detailed below.<br />
In FY02, the installation submitted the site inspection (SI) of the<br />
Walson Hospital Complex for regulatory review. The Army<br />
initiated an inventory of closed, transferred, and transferring<br />
(CTT) ranges and sites with unexploded ordnance, discarded<br />
military munitions, or munitions constituents.<br />
In FY03, the installation completed asbestos abatement at the<br />
Walson Hospital complex and received EPA concurrence on<br />
the closeout report. The installation began a SI of electrical<br />
transformer locations at the Federal Corrections Institute (FCI).<br />
The Army completed the CTT ranges and sites inventory for the<br />
BRAC portion of the installation. The inventory identified no<br />
Military Munitions Response Program (MMRP) sites on the<br />
BRAC property.<br />
In FY04, the installation completed SI fieldwork at Walson<br />
Hospital. The Army removed Walson Hospital from the list of<br />
excess BRAC properties; choosing instead to retain the<br />
property. The installation prepared a draft field investigation and<br />
remedy selection report for the transformer SI at the FCI.<br />
In FY05, the installation completed the SI, field investigation,<br />
and remedy selection report. Polychlorinated biphenyls (PCBs)<br />
were detected at two transformer locations. The installation<br />
continued to coordinate with the RAB and regulators.<br />
Army<br />
xtPPIRHPHPUSHH<br />
QIDHTS2—���<br />
€�������2��—�����2—��2��˜����—����<br />
xGe<br />
ppe2������2��2IWWI<br />
g������—���2��������D2��—��2���—��D2€gf�D2—�˜�����<br />
q������—���2—��2����<br />
62QHFU2�������<br />
2i��F2g„g2@g���2‰�—�AX 62HFH2�������@p‰2PHHIA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHIGp‰2PHHH<br />
2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />
p‰HT2s‚€2€�������<br />
Fort Dix BRAC prepared draft plans describing the<br />
implementation of the remediation at the two transformer<br />
locations and additional SI work in the 5600 Area. The<br />
installation completed the decision documents for the field<br />
investigation and the remedy selection report.<br />
Regulatory issues delayed preparation of the deed notice for<br />
Facility 5675 and the SI for chlorinated solvents and PCBs in<br />
the 5600 Area.<br />
p‰HT2ww‚€2€�������<br />
The Army has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Fort Dix BRAC are grouped below<br />
according to program category.<br />
22222s‚€<br />
0 Complete a deed notice for Facility 5675 in<br />
FY07.<br />
0 Complete the SI for the 5600 Area in FY07.<br />
0 Complete PCB remediation at the FCI in<br />
FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
€��˜�����2„�������D2x��2t�����<br />
M-70