07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

t�����2e���2e���������2€�—��<br />

ve€2e��—2—��2w—���—������2e��—<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

€�������2„�2h—��<br />

The Army constructed Joliet Army Ammunition Plant (AAP) in<br />

the early 1940s. It was then one of the largest munitions and<br />

explosives manufacturers in the Midwest. <strong>Installation</strong><br />

operations included manufacturing explosives, and loading,<br />

assembling, and packing (LAP) munitions for shipment. EPA<br />

placed the 9,159-acre Manufacturing Area and the 14,385-acre<br />

LAP Area on the NPL in July 1987 and March 1989,<br />

respectively. The installation consolidated all sites into two<br />

operable units (OUs), one for groundwater contamination and<br />

another for contamination of soil. The installation signed an<br />

interagency agreement (IAG) in June 1989. In FY95, the<br />

installation formed a Restoration Advisory Board. In FY04, the<br />

installation completed 5-year reviews for soil and groundwater<br />

OUs.<br />

Environmental studies conducted between FY78 and FY88<br />

identified 53 sites at Joliet AAP. The Army has transferred<br />

nearly 22,000 acres, including 15,000 acres to the U.S. Forest<br />

Service, almost 2,820 acres to the State of Illinois for industrial<br />

park reuse, 2,630 to U.S. Department of Agriculture (USDA),<br />

982 acres to U.S. Department of Veterans Affairs, and 455<br />

acres to Will County, Illinois. The Army also completed an<br />

installationwide Record of Decision (ROD) in FY99. The most<br />

significant cleanup activities completed through FY01 were<br />

excavation and treatment of many thousand tons of<br />

contaminated soil. The cleanup progress at Joliet AAP for<br />

FY02 through FY05 is detailed below.<br />

In FY02, the installation completed bioremediation of 36,000<br />

tons of explosives-contaminated soil. The Army conveyed 455<br />

acres to Will County, Illinois. The Army initiated the ROD for<br />

future USDA lands. The installation initiated an inventory of<br />

closed, transferred, and transferring ranges and sites with<br />

unexploded ordnance (UXO), discarded military munitions, or<br />

munitions constituents that identified Military Munitions<br />

Response Program (MMRP) sites at this installation. Two sites<br />

were cleared of UXO. The Army resumed excavation of<br />

explosives-contaminated soil from the TNT production area and<br />

excavated over 40,000 tons. Prior to the last tenant leaving the<br />

installation, the installation swept their function test area and<br />

removed UXO debris prior to acceptance of the property.<br />

Army<br />

svSPIQVPHRTHHH<br />

RDTUU2—���<br />

w—���—����D2��—�D2—����˜��D2—��2�—�2���������2—��2<br />

����������<br />

QSFPQ2@v�—����D2e����˜����D2—��2€—����2e��—AY2��—��2��2<br />

x€v2��2w—��2IWVWY2QPFHV2@w—���—������2e��—AY2��—��2��2<br />

x€v2��2t���2IWVU<br />

seq2������2��2t���2IWVW<br />

i���������D2��—��2���—��D2†yg�D2€gf�<br />

2w���—2e������X<br />

q������—���2—��2����<br />

2p������2��2h—��X<br />

62IIIFW2�������<br />

2i��F2g„g2@g���2‰�—�AX 62IPFW2�������@p‰2PHIQA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHHU<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

In FY03, the installation excavated an additional 40,000 tons of<br />

explosives-contaminated soil from the TNT production area and<br />

bioremediated 36,000 tons of soil. The Army initiated a site<br />

inspection (SI) at four MMRP sites. A multi-agency group,<br />

which includes the Army, EPA, Illinois EPA, USDA, the U.S.<br />

Forest Service, U.S. Fish and Wildlife Service, and the Illinois<br />

Department of Natural Resources, reached agreement on the<br />

cleanup goals for Joliet AAP lands transferred to USDA.<br />

In FY04, the installation completed 5-year reviews for soil and<br />

groundwater OUs. The Army transferred 305 acres to the State<br />

of Illinois; the remaining balance of land is slated for the Island<br />

City Industrial Park. The installation completed a feasibility<br />

study, proposed plan, and ROD for lands transferred to USDA<br />

and initiated a transfer of 2,440 acres to USDA. The installation<br />

excavated and bioremediated an additional 36,000 tons of<br />

explosives-contaminated soil. Additionally, the installation<br />

initiated the SIs for MMRP sites.<br />

In FY05, Joliet AAP completed remedial action (RA) in the TNT<br />

Area. The Army transferred 304 acres of Deer Run Industrial<br />

Park to the State of Illinois and 2,630 acres to USDA. The Army<br />

began RA for future USDA lands. The Army initiated a<br />

performance-based contract (PBC) for landfills and<br />

groundwater. The installation completed an SI of MMRP sites.<br />

The PBC addressing landfills and groundwater also includes<br />

optional line items to conduct post-SI actions at the four MMRP<br />

sites.<br />

p‰HT2s‚€2€�������<br />

The installation completed cleanup and developed transfer<br />

documentation for 235 acres to the State of Illinois, 20 acres<br />

less than the original estimate. It also completed cleanup and<br />

developed transfer documentation for 580 acres to USDA.<br />

Joliet AAP completed RA at Sites L1, L4, L7, L8, L9, L10, M2,<br />

and M9 and continued the long-term management (LTM)<br />

program for groundwater.<br />

Technical issues delayed the transfer of 145 acres to the<br />

USDA.<br />

p‰HT2ww‚€2€�������<br />

The installation initiated the remedial design for three MMRP<br />

sites and implemented RA for one MMRP site.<br />

€�—�2��2e����<br />

Plan of action items for Joliet Army Ammunition Plant are<br />

grouped below according to program category.<br />

22222s‚€<br />

0 Complete RA at soil OU in FY07.<br />

0 Continue LTM at groundwater OU in FY07.<br />

0 Inititiate LTM at applicable soil OU in FY08.<br />

0 Transfer remaining acreage to the USDA in<br />

FY08.<br />

22222ww‚€<br />

0 Complete RA at all MMRP sites in FY07.<br />

M-104<br />

x€v<br />

‡���������D2s�������

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!