07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

x��—��2e��2p���2f—�� f‚eg2IWWQ<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

Since 1962, Newark Air Force Base (AFB) has provided<br />

depot-level maintenance for missile, guidance, and navigational<br />

systems used by most aircraft and missiles. In 1993, the BRAC<br />

Commission recommended that Newark be closed. The work at<br />

Newark AFB was privatized-in-place in 1996. Past waste<br />

management activities related to solvents, such as freon 113<br />

and trichloroethylene (TCE), have affected groundwater at the<br />

installation. An Environmental Baseline Survey was completed<br />

in 1994. In FY94, the installation formed a BRAC cleanup team<br />

(BCT) and a Restoration Advisory Board (RAB) to support<br />

cleanup efforts. The RAB adjourned in FY05. The installation<br />

completed the first 5-year review in FY05.<br />

Through investigations, the installation has identified 14 sites.<br />

The installation prepared no further action decision documents<br />

(DDs) for five sites. Upon closure, 56 of the 70 acres<br />

comprising Newark AFB were transferred to the<br />

Heath-Newark-Licking County Port Authority, and the<br />

maintenance and repair are being conducted by contractors<br />

through a privatization contract. In FY03, a 13-acre parcel on<br />

the northern side of the former Newark AFB was transferred to<br />

Licking County Regional Airport. The cleanup process at<br />

Newark AFB from FY02 through FY05 is detailed below.<br />

In FY02, a focused supplementary remedial investigation<br />

concluded that bis-dichloroethylether (BCEE) in groundwater<br />

was due to an up-gradient, off-site source. A feasibility study<br />

recommended institutional controls as the remedial action for<br />

BCEE. A DD was signed and the last remedy in place (LRIP)<br />

for Site LF 002 was achieved. Three of the eight required<br />

cycles of quarterly monitoring to assess the success of the<br />

vegetable oil injection at the three-quarter acre Site FF 87 were<br />

completed. The 5-year review was rescheduled based on the<br />

1999 achievement of LRIP for the 56-acre parcel.<br />

In FY03, the Air Force transferred Site LF 002, totaling 13<br />

acres, to the Licking County Regional Airport Authority. An<br />

amended post closure plan (APCP) for Site FF 87 and the<br />

hazardous waste storage area was submitted for regulatory<br />

review.<br />

In FY04, the APCP for Site FF 87 was completed. Contaminant<br />

concentrations dramatically decreased at monitoring well (MW)<br />

Air Force<br />

yrSSUHHPRTSHHH<br />

UH2—���<br />

€�������2�����E�����2�—�����—��2���2e��2p���2—��2h�h2<br />

�������D2�—���—����D2—��2����—��2�������F<br />

xGe<br />

x���<br />

†yg�D2ƒ†yg�D2fgiiD2„gi<br />

q������—���2—��2����<br />

2p������2��2h—��X<br />

62SFV2�������<br />

2i��F2g„g2@g���2‰�—�AX 62HFU2�������@p‰2PHIIA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHPGx���<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

87 1A. The Air Force conducted an inventory of Military<br />

Munitions Response Program (MMRP) sites. No MMRP sites<br />

were identified at this installation.<br />

In FY05, the installation completed the first 5-year review. The<br />

enhanced bioremediation at Site FF 87 continues to make<br />

progress at the two remaining wells (MWs 87 1 and 87 1A)<br />

where concentrations of TCE exceed the maximum<br />

contaminant level. A performance-based contract was awarded<br />

for groundwater monitoring at Site FF 87. The BCT held one<br />

meeting, at which the installation presented proposed<br />

amendments to the post closure plan for the detection<br />

monitoring and bioremediation effectiveness monitoring<br />

program. The RAB formally adjourned in accordance with DoD<br />

policy because all environmental cleanup sites are closed with<br />

the exception of FF 87.<br />

p‰HT2s‚€2€�������<br />

Newark AFB continued remedial action-operation (RA-O)<br />

groundwater monitoring activities at Site FF 87. A proposal was<br />

submitted to amend the APCP for FF 87. The installation<br />

submitted a demonstration of a remedial system operating<br />

properly and successfully (OP&S) to EPA Region 5. The<br />

obsolete groundwater monitoring wells at previously transferred<br />

parcels were closed.<br />

Regulatory issues delayed EPA concurrence on the OP&S<br />

demonstration at Site FF 87.<br />

The BCT met twice and signed a consensus statement for no<br />

further groundwater monitoring at Site LF 002.<br />

p‰HT2ww‚€2€�������<br />

The Air Force has identified no MMRP sites at this installation.<br />

€�—�2��2e����<br />

Plan of action items for Newark Air Force Base are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Complete OP&S documents and obtain OP&S<br />

approval letter for Site FF 87 in FY07.<br />

0 Plan and coordinate site closure acceleration<br />

activities at Site FF 87 in FY07-FY08.<br />

0 Continue RA-O groundwater monitoring at Site<br />

FF 87 in FY07-FY08.<br />

0 Revise the APCP to focus Site FF 87<br />

groundwater monitoring at key monitoring<br />

locations in FY07-FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />