Beginning in FY85, studies at this installation have identified<br />
sites at Whiting Field Naval Air Station (NAS) and the Outlying<br />
Landing Field (OLF) Barin. Whiting Field NAS has<br />
administrative responsibility for OLF Barin, located in Alabama.<br />
Site types include disposal areas and pits, storage areas, spill<br />
areas, landfills, a disposal and burning area, a maintenance<br />
area, underground storage tanks (USTs) and fuel pits, fire<br />
training areas, and drainage ditches. Whiting Field NAS formed<br />
a technical review committee (TRC) in FY89. The installation<br />
updated the community relations plan (CRP) in FY93 and<br />
FY03. Whiting Field NAS formed a TRC for the OLF Barin in<br />
FY92 and completed the OLF Barin's CRP in FY93. The<br />
installation was placed on the NPL in May 1994. In FY95, both<br />
TRCs were converted to Restoration Advisory Boards. The<br />
Navy completed draft 5-year reviews for Sites 1 and 2 in FY06.<br />
The installation is currently negotiating a federal facility<br />
agreement (FFA).<br />
Whiting Field NAS has identified 46 sites. The installation has<br />
closed 17 sites: Site 5 was closed by a consent order; Sites 8,<br />
36, and 37 were closed with no further action (NFA) necessary;<br />
and ten sites have been closed at the OLF Barin. To date, the<br />
installation has signed 14 Records of Decision (RODs). The<br />
cleanup progress at Whiting Field NAS for FY02 through FY05<br />
is detailed below.<br />
In FY02, the installation initiated interim remedial actions (RAs)<br />
at four sites. Monitoring continued for Sites 1, 2, 3, 4, 6, 30, 32,<br />
and 33, and UST 000005. The installation initiated the 5-year<br />
review for Sites 1 and 2. One ROD was signed. The NAS<br />
initiated an investigation of aviation gasoline (AVGAS) pipeline.<br />
The installation completed the RA plan for UST 000002. The<br />
Navy completed an inventory of all Military Munitions Response<br />
Program (MMRP) sites. One MMRP site was identified at this<br />
installation.<br />
In FY03, the installation completed an investigation of the<br />
AVGAS pipeline for Section E. The installation developed the<br />
RA plan for UST 000002 and is ready for the next phase of<br />
development and design. In addition, the installation continued<br />
the monitoring for Sites 1, 2, 3, 4, 6, 30, 32, and 33, and UST<br />
000005. The installation also continued 5-year reviews for Sites<br />
1 and 2.<br />
Navy<br />
pvRIUHHPQPRRHH<br />
QDVRP2—���<br />
„�—��2�������2�—�—�2—��—����<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2�����2������—����<br />
€��������D2€gf�D2†yg�D2��—��2���—��D2������—���2<br />
�����—�˜���<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62QQFW2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PHFW2�������@p‰2PHQUA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIQGp‰2PHIP<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
In FY04, the installation initiated the RA for Site 7 and<br />
continued monitoring land use controls (LUCs) for Sites 1, 2, 4,<br />
30, 32, and 33. The installation also initiated operations at UST<br />
000002 and monitoring at UST 00005. The installation<br />
completed RODs on five sites. The installation completed draft<br />
5-year reviews for Sites 1 and 2.<br />
In FY05, Whiting Field NAS continued RA for Site 7; continued<br />
monitoring LUCs for Sites 1, 2, 30, 32, and 33; signed five No<br />
Action or NFA RODs; and completed three remedial designs<br />
and RAs. The installation also continued operations at UST<br />
000002 and monitoring at UST 000005.<br />
p‰HT2s‚€2€�������<br />
Whiting Field NAS continued RA at Site 7 and UST 000002.<br />
The installation completed six RODs; one No Action ROD, two<br />
LUC RODs, and three engineering control/LUC RODs. The<br />
5-year reviews for Sites 1 and 2 were completed. The<br />
installation also continued monitoring Sites 1, 2, 30, 32, 33, and<br />
UST 000005, as well as conducted RA operations at UST<br />
000002. The cost of completing environmental restoration has<br />
changed significantly due to technical issues.<br />
Administrative issues delayed the explanation of significant<br />
differences (ESD) for the NFA ROD at Site 2. Technical issues<br />
delayed the FFA.<br />
p‰HT2ww‚€2€�������<br />
Whiting Field NAS submitted the preliminary assessment for<br />
the MMRP site.<br />
€�—�2��2e����<br />
Plan of action items for Whiting Field Naval Air Station are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete FFA in FY07.<br />
0 Continue monitoring at Sites 1, 2, 30, 32,<br />
and 33 in FY07.<br />
0 Prepare the ESD for the NFA ROD at Site 2 in<br />
FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />