Whidbey Island Naval Station (NS) occupies four areas on<br />
Whidbey Island, Washington: Ault Field, Seaplane Base,<br />
Coupville Outlying Field, and Lake Hancock Target Range. The<br />
Seaplane Base and Ault Field were placed on the NPL in<br />
February 1990. The installation signed a federal facility<br />
agreement (FFA) in September 1990. In 2005, the BRAC<br />
Commission recommended Whidbey Island NS for realignment.<br />
Past disposal practices from aircraft maintenance, vehicle<br />
maintenance, public works shop activities, and fire fighting<br />
training activities have contributed to contamination. In FY94,<br />
the installation converted its technical review committee to the<br />
Navy's first Restoration Advisory Board. The Seaplane Base<br />
was delisted from the NPL in 1995. The community relations<br />
plan was updated in FY96. The installation completed 5-year<br />
reviews in FY98 and FY04.<br />
Whidbey Island NS has identified 91 sites. Investigations<br />
initially identified 52 sites at the installation, which were<br />
grouped into five operable units (OUs). The installation has<br />
completed five Records of Decision. The cleanup progress at<br />
Whidbey Island NS for FY02 through FY05 is detailed below.<br />
In FY02, the installation continued treatment operations. The<br />
installation completed a remedial investigation and feasibility<br />
study at Site 55. The Navy completed an inventory of all Military<br />
Munitions Response Program (MMRP) sites. No MMRP sites<br />
were identified at this installation.<br />
In FY03, the installation continued treatment operations at OUs<br />
1 and 5.<br />
In FY04, the installation completed a 5-year review, and<br />
continued treatment operations at OUs 1 and 5. It also<br />
supported EPA in delisting Ault Fields OUs 2, 3, and 5.<br />
In FY05, Whidbey Island NS began investigating the potential<br />
for a new contaminant of concern from Area 6. The installation<br />
initiated an optimization study (OS) on a pump-and-treat<br />
system and a free product recovery system.<br />
Navy<br />
‡eHIUHHPQQTIHH<br />
UDHHH2—���<br />
ƒ����2—�2����2��2��—�����2—��2����—�����2�����2���2���2<br />
���—�����X2g�����2���2…FƒF2w—����2g����2—��2x—��2‚������2<br />
��—�����2��2���2€—���2x��������<br />
QWFTR2@ƒ�—��—��2f—��AD2��—��2��2x€v2��2p�˜��—��2IWWHD2<br />
��������2��2IWWSY2RVFRV2@e���2p����AD2��—��2��2x€v2��2p�˜��—��2<br />
IWWH<br />
ppe2������2��2ƒ�����˜��2IWWH<br />
2g���—���—���X<br />
€gf�D2€er�D2������—���2��������<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62WQFT2�������<br />
2i��F2g„g2@g���2‰�—�AX 62RIFS2�������@p‰2PHQUA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHIQ<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
p‰HT2s‚€2€�������<br />
Whidbey NS continued treatment operations at OUs 1 and 5,<br />
and upgraded hardware at OU 1. Pump-and-treat and fuel<br />
recovery operations at Sites 6 and 52 provided continued<br />
treatment. The installation confirmed contamination in one<br />
off-site well. The installation also completed re-sampling of Site<br />
16 Runway Ditches. The cost of completing environmental<br />
restoration has changed significantly due to technical issues.<br />
Regulatory issues delayed the final OS at Sites 6 and 52.<br />
p‰HT2ww‚€2€�������<br />
The installation conducted preliminary assessments (PAs) at<br />
Lake Hancock Target Range, Polnell Point, Crescent Harbor<br />
Practice Range, and Aviation Fleet Gunnery School (Machine<br />
Gun Ranges).<br />
€�—�2��2e����<br />
Plan of action items for Whidbey Island Naval Station Ault Field<br />
and Seaplane Base are grouped below according to program<br />
category.<br />
22222s‚€<br />
0 Continue treatment operations at OUs 1 and 5<br />
in FY07-FY08.<br />
0 Expand 1, 4 dioxane sampling to define plume<br />
in FY07-FY08.<br />
0 Initiate a 5-year review in FY07-FY08.<br />
0 Complete an explanation of significant<br />
differences for land use controls in<br />
FY07-FY08.<br />
0 Complete OS at Sites 6 and 52 in FY07-FY08.<br />
22222ww‚€<br />
0 Obtain regulatory concurrence of PA reports<br />
and conduct site inspections for the four<br />
MMRP sites in FY07-FY08.<br />