Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
„������2x—�—�2e��2‡—��—��2g�����2e���—��2h������� f‚eg2IWWQ<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
In July 1993, the BRAC Commission recommended closure of<br />
Trenton Naval Air Warfare Center (NAWC) Aircraft Division.<br />
Operations were transferred to the Arnold Engineering<br />
Development Center and the Patuxent River Naval Air Station<br />
in December 1998, which was the date of operational closure.<br />
Contamination at the installation resulted from various fuels<br />
used to operate engines during tests and from trichloroethylene<br />
(TCE), ethylene glycol, and freon used to cool the air entering<br />
the engines. Residues of fuels and solvents were detected in<br />
groundwater and soil. Site types include underground storage<br />
tanks (USTs), disposal areas, and spill sites. A technical review<br />
committee was formed in FY91 and converted to a Restoration<br />
Advisory Board in FY93, which was formally disbanded in<br />
FY01. The Environmental Baseline Survey (EBS) Phase II<br />
report was finalized, and remediation was completed at the<br />
remaining EBS areas of concern. In FY04, the installation<br />
completed a 5-year review.<br />
Studies at the installation have identified nine CERCLA sites<br />
and two UST sites. The cleanup progress at Trenton NAWC<br />
Aircraft Division for FY02 through FY05 is detailed below.<br />
In FY02, the installation continued groundwater monitoring and<br />
operation and maintenance (O&M) of the groundwater<br />
treatment system, and transferred Parcel B. An inventory of all<br />
Military Munitions Response Program (MMRP) sites was<br />
completed. No MMRP sites were identified at this installation.<br />
In FY03, O&M of the groundwater treatment system continued.<br />
In FY04, O&M of the groundwater treatment system continued<br />
and the installation completed a 5-year review of the remedy.<br />
In FY05, O&M of the groundwater treatment system continued<br />
and the installation conducted a biannual review per state<br />
regulations. A work plan for a bioaugmentation pilot study for<br />
groundwater was completed and fieldwork began.<br />
Navy<br />
xtPIUHHPPTWSHH<br />
SPW2—���<br />
„���2������2�������2—��2���������<br />
xGe<br />
x���<br />
„giD2�����D2������D2��������D2�����<br />
q������—���2—��2����<br />
62PRFR2�������<br />
2i��F2g„g2@g���2‰�—�AX 62ITFI2�������@p‰2PHQIA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHHGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
p‰HT2s‚€2€�������<br />
Trenton NAWC Aircraft Division continued O&M of the<br />
groundwater treatment system.<br />
The installation extended the bioaugmentation pilot study, as<br />
favorable results delayed its completion.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Trenton Naval Air Warfare Center<br />
Aircraft Division are grouped below according to program<br />
category.<br />
22222s‚€<br />
0 Complete the bioaugmentation pilot study and<br />
issue a report in FY07.<br />
0 Continue O&M of the groundwater treatment<br />
system in FY07-FY08.<br />
0 Ensure relocation of the treatment plant and<br />
extraction wells meets regulatory and<br />
operational requirements in FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
„������D2x��2t�����<br />
M-193