07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

„������2x—�—�2e��2‡—��—��2g�����2e���—��2h������� f‚eg2IWWQ<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

2p������2��2h—��X<br />

€�������2„�2h—��<br />

In July 1993, the BRAC Commission recommended closure of<br />

Trenton Naval Air Warfare Center (NAWC) Aircraft Division.<br />

Operations were transferred to the Arnold Engineering<br />

Development Center and the Patuxent River Naval Air Station<br />

in December 1998, which was the date of operational closure.<br />

Contamination at the installation resulted from various fuels<br />

used to operate engines during tests and from trichloroethylene<br />

(TCE), ethylene glycol, and freon used to cool the air entering<br />

the engines. Residues of fuels and solvents were detected in<br />

groundwater and soil. Site types include underground storage<br />

tanks (USTs), disposal areas, and spill sites. A technical review<br />

committee was formed in FY91 and converted to a Restoration<br />

Advisory Board in FY93, which was formally disbanded in<br />

FY01. The Environmental Baseline Survey (EBS) Phase II<br />

report was finalized, and remediation was completed at the<br />

remaining EBS areas of concern. In FY04, the installation<br />

completed a 5-year review.<br />

Studies at the installation have identified nine CERCLA sites<br />

and two UST sites. The cleanup progress at Trenton NAWC<br />

Aircraft Division for FY02 through FY05 is detailed below.<br />

In FY02, the installation continued groundwater monitoring and<br />

operation and maintenance (O&M) of the groundwater<br />

treatment system, and transferred Parcel B. An inventory of all<br />

Military Munitions Response Program (MMRP) sites was<br />

completed. No MMRP sites were identified at this installation.<br />

In FY03, O&M of the groundwater treatment system continued.<br />

In FY04, O&M of the groundwater treatment system continued<br />

and the installation completed a 5-year review of the remedy.<br />

In FY05, O&M of the groundwater treatment system continued<br />

and the installation conducted a biannual review per state<br />

regulations. A work plan for a bioaugmentation pilot study for<br />

groundwater was completed and fieldwork began.<br />

Navy<br />

xtPIUHHPPTWSHH<br />

SPW2—���<br />

„���2������2�������2—��2���������<br />

xGe<br />

x���<br />

„giD2�����D2������D2��������D2�����<br />

q������—���2—��2����<br />

62PRFR2�������<br />

2i��F2g„g2@g���2‰�—�AX 62ITFI2�������@p‰2PHQIA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHHGx���<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������<br />

p‰HT2s‚€2€�������<br />

Trenton NAWC Aircraft Division continued O&M of the<br />

groundwater treatment system.<br />

The installation extended the bioaugmentation pilot study, as<br />

favorable results delayed its completion.<br />

p‰HT2ww‚€2€�������<br />

The Navy has identified no MMRP sites at this installation.<br />

€�—�2��2e����<br />

Plan of action items for Trenton Naval Air Warfare Center<br />

Aircraft Division are grouped below according to program<br />

category.<br />

22222s‚€<br />

0 Complete the bioaugmentation pilot study and<br />

issue a report in FY07.<br />

0 Continue O&M of the groundwater treatment<br />

system in FY07-FY08.<br />

0 Ensure relocation of the treatment plant and<br />

extraction wells meets regulatory and<br />

operational requirements in FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

„������D2x��2t�����<br />

M-193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!