Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
x—�—�2ƒ������2p—�����D2h—������<br />
p�������2h—������2x—�—�2ƒ���—�2‡—��—��2g�����<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The Dahlgren Naval Surface Warfare Center changed its name<br />
in FY05 to the Naval Support Facility, Dahlgren (Dahlgren) to<br />
reflect integration into the Naval District Washington Region.<br />
Dahlgren conducts ordnance testing for the Navy. Site types<br />
include former landfills, former ordnance burning and disposal<br />
areas, underground storage tanks, operating ordnance ranges,<br />
and operating ordnance research and development areas. The<br />
installation established an information repository and an<br />
administrative record in FY91. EPA placed the installation on<br />
the NPL in October 1992 because of potential migration of<br />
releases from three contaminated sites. These releases could<br />
affect the Potomac River, Gambo Creek, associated wetlands,<br />
and local groundwater aquifers used for drinking water.<br />
Ordnance testing operations contributed to the contamination.<br />
A federal facility agreement (FFA) was signed in September<br />
1994. In 2005, the BRAC Commission recommended Dahlgren<br />
for realignment. In FY92, a community relations plan was<br />
completed, and the installation formed a technical review<br />
committee (TRC). In FY95, the TRC was converted to a<br />
Restoration Advisory Board (RAB). The installation completed<br />
5-year reviews in FY03, FY04, and FY05.<br />
To date, Dahlgren has identified 68 sites. Records of Decision<br />
(RODs) have been completed for 20 sites since the beginning<br />
of the environmental restoration process. The cleanup progress<br />
at Dahlgren for FY02 through FY05 is detailed below.<br />
In FY02, the installation completed a remedial investigation and<br />
feasibility study (RI/FS), a proposed plan (PP), and a ROD for<br />
Site 6, and completed an RI for Site 55. Four <strong>Appendix</strong> B<br />
closeout sites were sampled and documents were finalized for<br />
no further action (NFA) remedial designs (RDs) for Sites 6 and<br />
46. Long-term management work plans were finalized for Sites<br />
9, 10, and 17. The installation completed interim remedial<br />
actions (IRAs) at Sites 13 and 50. The Navy completed an<br />
inventory of all Military Munitions Response Program (MMRP)<br />
sites. No MMRP sites were identified at this installation.<br />
In FY03, the installation completed two RI/FSs, two PPs, and<br />
two RODs for Sites 31 and 55. The Navy completed the 5-year<br />
review for Site 2. The installation completed the Site 46 RA and<br />
began the Site 6 RA. The installation also initiated the Site 37<br />
RD. The Navy initiated a treatability study (TS) using the in-situ<br />
Navy<br />
†eQIUHHPRTVSHH<br />
PDTUU2—���<br />
€����2—��2����2����—��<br />
SHFPTY2��—��2��2x€v2��2y��˜��2IWWP<br />
ppe2������2��2ƒ�����˜��2IWWR<br />
g��—����2��������D2����������2��������D2��—��2���—��D2���E�����2<br />
�—���—����2�—����—��D2������D2€gf�D2���������<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62THFP2�������<br />
2i��F2g„g2@g���2‰�—�AX 62VFI2�������@p‰2PHIRA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIHGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
Multiple Application Gas Nutrient System (Magnus System) to<br />
inject nutrients into the groundwater at Site 12. The additional<br />
planned RD was not required.<br />
In FY04, the installation completed three RIs (Sites 32, 37, and<br />
61), two FSs (Sites 32 and 37), two PPs, and two RODs for<br />
Sites 32 and 37. The Navy completed the 5-year review for<br />
Sites 9, 10, 12, and 17. The installation completed the Site 6<br />
RA and began construction on Site 47 IRA. The Site 37 100<br />
percent RD was submitted. The Magnus System TS continued<br />
at Site 12. The installation completed annual wetland<br />
monitoring reports for Sites 9/58, 17, 25, 46, and 50. The<br />
installation completed IRAs for Sites 43 and 52. The installation<br />
initiated the IRA for Site 61 and completed site screenings for<br />
four sites (Sites 14, 15, 38, and 57).<br />
In FY05, the Navy completed a comprehensive 5-year review<br />
for annual wetland monitoring sites, an RD for Site 37, and an<br />
annual wetland monitoring report for Sites 6, 9, 17, 25, 46, 50,<br />
and 58. Dahlgren completed an RI/FS, a PP, and a ROD for<br />
Site 62. The installation completed IRAs for Sites 47b and 61b.<br />
The Navy finalized two closeout documents for NFA at Sites 38<br />
and 40. The installation completed RIs for Sites 20 and 61a and<br />
conducted removal actions at Sites 4 and 15. The Navy utilized<br />
diffusion bag technology for groundwater sampling in order to<br />
assist with volatile organic chemical (VOC) contamination<br />
concentrations at Site 20. Two RAB meetings were held, and a<br />
presentation was made to the King George Board of<br />
Supervisors on the status of the remediation efforts at<br />
Dahlgren.<br />
p‰HT2s‚€2€�������<br />
Dahlgren completed an annual wetland monitoring report for<br />
Sites 6, 9, 17, 25, 46, 50, and 58, an <strong>Appendix</strong> B closeout<br />
report for Solid Waste Management Unit 128 OWS 1121,<br />
initiated and completed the Site 9 marsh cap repair, and<br />
installed a temporary methane gas intercept trench with gas<br />
monitoring wells. The Navy completed the ROD amendment<br />
and revised RD for Site 37, and initiated an RA. Dahlgren<br />
completed an engineering evaluation and cost analysis for Site<br />
14. The installation has planned additional trenching and soil<br />
screening at Site 61a prior to recommendation of a final<br />
remedy. The Navy also developed a new remediation team.<br />
x€vGf‚eg2PHHS<br />
The installation completed an IRA for Site 47a and the closeout<br />
documents were submitted for review; however, technical and<br />
contractual issues delayed two IRAs at Sites 4 and 15. The<br />
installation completed a draft FS for Site 14; however, technical<br />
issues delayed its completion.<br />
The Navy held a public meeting to present the Site 37 amended<br />
PP, and a RAB meeting was conducted.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Naval Support Facility, Dahlgren are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete an FS and a closeout document for<br />
one site in FY07.<br />
0 Complete PP and ROD for Site 20 in FY07, and<br />
Site 61a in FY08.<br />
0 Initiate and complete RA for one site in FY07<br />
and FY08, respectively.<br />
0 Initiate IRA at one site in FY07, and<br />
complete in FY08.<br />
0 Complete IRAs and the annual wetland<br />
monitoring report for Sites 4 and 15 in FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />