07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

x—�—�2p—�������2��2†������<br />

p�������2†������2x—�—�2„�—�����2‚—���2—��2x—�—�2e���������2ƒ������<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

€�������2„�2h—��<br />

The former Naval Facilities on Vieques consist of the former<br />

Naval Ammunition Support Detachment (NASD) on the western<br />

end of the island and the former Vieques Naval Training Range<br />

(VNTR) on the eastern half. Site types include underground<br />

storage tanks, open burning/open detonation areas, and<br />

munitions areas. In FY03, the Governor of Puerto Rico<br />

requested EPA list the former NASD and VNTR on the NPL;<br />

the installation was listed in February 2005. The installation<br />

converted the technical review committee (TRC) to a<br />

Restoration Advisory Board (RAB) in FY04.<br />

The Navy has identified 17 potentially contaminated sites at the<br />

former NASD. At the former VNTR, the Navy identified 12<br />

RCRA sites and 62 potential Military Munitions Response<br />

Program (MMRP) sites. The Navy has transferred 8,114 acres<br />

of the former NASD to the Department of the Interior (DOI), the<br />

Municipality of Vieques, and the Puerto Rico Conservation<br />

Trust. Four thousand of these acres are managed as a<br />

National Wildlife Refuge by the U.S. Fish and Wildlife Service<br />

(FWS). The Navy has also transferred 14,573 acres of the<br />

former VNTR to DOI to be operated and managed as a<br />

National Wildlife Refuge and Wilderness Area. The cleanup<br />

progress at Naval Facilities on Vieques for FY02 through FY05<br />

is detailed below.<br />

In FY02, the Navy completed the final report on background<br />

contamination for the former NASD.<br />

In FY03, the Navy completed a remedial investigation and<br />

feasibility study (RI/FS) at four sites at the former NASD, and<br />

the final baseline groundwater work plan for the former VNTR.<br />

In addition, the Navy completed the munitions investigation and<br />

report for Red and Blue Beach, and placed warning signs in<br />

restricted areas throughout the former VNTR.<br />

In FY04, the Navy conducted Phase I fieldwork for the RI for 12<br />

sites on the former VNTR, RI/FS reports for four sites at the<br />

former NASD, RI/FS investigations for two sites, and finalized<br />

the no further action (NFA) document for nine sites on the<br />

former NASD. The TRC was converted to an RAB. The<br />

installation completed a draft final expanded range assessment<br />

and site inspection (SI) work plan, and submitted the SI work<br />

plan for regulatory review.<br />

Navy<br />

€‚PIUHHQIUPHHHD2€‚PIUHHTWQPIHH<br />

PPDTVU2—���<br />

†x„‚2��������2������2�—��—��2—��2—����˜����2��—�����2���2<br />

�—�����D2�—�—�2�������2�������2��—�����D2—��2—��2��2������2<br />

��—�����F2xeƒh2��������2���������2����—��2���2e��—���2p����2<br />

��—�����<br />

xeY2��—��2��2x€v2��2p�˜��—��2PHHS<br />

pee2�����2������—����<br />

2g���—���—���X<br />

i���������D2���—��D2†yg�D2ƒ†yg�D2���������D2€gf�D2�—������D2<br />

�—��2�—���2���<br />

2w���—2e������X<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62SIFI2�������<br />

2i��F2g„g2@g���2‰�—�AX 62PQTFU2�������@p‰2PHPTA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHIW<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

In FY05, the Navy completed supplemental RI work plans for<br />

three former NASD sites (Areas of Concern [AOCs] E, I, and R)<br />

and received regulatory approval. In addition, the Navy<br />

submitted engineering evaluation and cost analyses for four<br />

former NASD sites (AOCs J and R, Solid Waste Management<br />

Units [SWMUs] 6, and 7). For the former VNTR, the Navy<br />

completed a preliminary assessment (PA)/SI work plan for eight<br />

photo-identified/potential AOC (PI/PAOC) sites and received<br />

regulatory approval. The Navy submitted a data summary<br />

report for the original 12 RCRA sites. The Navy also completed<br />

a background soil investigation work plan for the former VNTR<br />

and received regulatory approval. The Navy initiated MMRP<br />

interim removal action at SWMU 4 for the former NASD. The<br />

installation conducted an MMRP SI and expanded range<br />

assessment for the former VNTR. In addition, the Navy<br />

conducted an MMRP surface removal action at discrete sites in<br />

the former live impact area (LIA) and specific beaches and<br />

roads at the former VNTR. The Navy completed a charter for<br />

the RAB.<br />

p‰HT2s‚€2€�������<br />

The Navy conducted RI/supplemental RIs at three former<br />

NASD sites (AOCs E, I, and R). The Navy also initiated a<br />

background soil investigation and PA/SI at eight PI/PAOC sites<br />

at the former VNTR. The cost of completing environmental<br />

restoration has changed significantly due to technical issues.<br />

Technical issues delayed the removal actions at four former<br />

NASD sites (AOCs J, R, SWMUs 6, and 7). The installation<br />

completed a draft final work plan for RI at the former NASD<br />

SWMU 4; however, regulatory issues delayed the final RI.<br />

p‰HT2ww‚€2€�������<br />

The Navy completed a time-critical removal action surface<br />

removal of munitions and explosives of concern (MEC) from<br />

200 acres of the approximately 900 acres on the LIA. The Navy<br />

completed the work plan for the Phase II SI and expanded<br />

range assessment.<br />

Technical issues delayed the Phase II MMRP interim removal<br />

action at former NASD SWMU 4. Regulatory issues delayed the<br />

subsurface removal of MEC at selected beaches to be utilized<br />

by DOI and FWS.<br />

€�—�2��2e����<br />

Plan of action items for Naval Facilities on Vieques are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Complete RI report at five former NASD sites<br />

(AOCs E, I, J, 6, and 7) in FY07.<br />

0 Complete RI and, if necessary, initiate<br />

supplemental RI for the former NASD (AOC R)<br />

in FY07.<br />

0 Perform removal actions at four former NASD<br />

sites (AOCs J, R, SWMUs 6, and 7) in FY07.<br />

0 Complete the background soil investigation<br />

and PA/SI at eight PI/PAOC sites at the<br />

former VNTR in FY07.<br />

0 Prepare NFA proposed remedial action plans<br />

for nine sites in FY07.<br />

0 Initiate RI at former NASD site SWMU 4 in<br />

FY07.<br />

22222ww‚€<br />

0 Complete burn plan for vegetative removal in<br />

LIA and Eastern Conservation Area on VNTR in<br />

FY07.<br />

0 Complete time-critical removal action surface<br />

removal of MEC on 300 acres, of the remaining<br />

700 acres on the LIA in FY07.<br />

0 Conduct subsurface removal of MEC at selected<br />

beaches and roads in FY07.<br />

0 Conduct the Phase II SI for the former VNTR<br />

in FY07.<br />

M-141<br />