Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
x—�—�2p—�������2��2†������<br />
p�������2†������2x—�—�2„�—�����2‚—���2—��2x—�—�2e���������2ƒ������<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
€�������2„�2h—��<br />
The former Naval Facilities on Vieques consist of the former<br />
Naval Ammunition Support Detachment (NASD) on the western<br />
end of the island and the former Vieques Naval Training Range<br />
(VNTR) on the eastern half. Site types include underground<br />
storage tanks, open burning/open detonation areas, and<br />
munitions areas. In FY03, the Governor of Puerto Rico<br />
requested EPA list the former NASD and VNTR on the NPL;<br />
the installation was listed in February 2005. The installation<br />
converted the technical review committee (TRC) to a<br />
Restoration Advisory Board (RAB) in FY04.<br />
The Navy has identified 17 potentially contaminated sites at the<br />
former NASD. At the former VNTR, the Navy identified 12<br />
RCRA sites and 62 potential Military Munitions Response<br />
Program (MMRP) sites. The Navy has transferred 8,114 acres<br />
of the former NASD to the Department of the Interior (DOI), the<br />
Municipality of Vieques, and the Puerto Rico Conservation<br />
Trust. Four thousand of these acres are managed as a<br />
National Wildlife Refuge by the U.S. Fish and Wildlife Service<br />
(FWS). The Navy has also transferred 14,573 acres of the<br />
former VNTR to DOI to be operated and managed as a<br />
National Wildlife Refuge and Wilderness Area. The cleanup<br />
progress at Naval Facilities on Vieques for FY02 through FY05<br />
is detailed below.<br />
In FY02, the Navy completed the final report on background<br />
contamination for the former NASD.<br />
In FY03, the Navy completed a remedial investigation and<br />
feasibility study (RI/FS) at four sites at the former NASD, and<br />
the final baseline groundwater work plan for the former VNTR.<br />
In addition, the Navy completed the munitions investigation and<br />
report for Red and Blue Beach, and placed warning signs in<br />
restricted areas throughout the former VNTR.<br />
In FY04, the Navy conducted Phase I fieldwork for the RI for 12<br />
sites on the former VNTR, RI/FS reports for four sites at the<br />
former NASD, RI/FS investigations for two sites, and finalized<br />
the no further action (NFA) document for nine sites on the<br />
former NASD. The TRC was converted to an RAB. The<br />
installation completed a draft final expanded range assessment<br />
and site inspection (SI) work plan, and submitted the SI work<br />
plan for regulatory review.<br />
Navy<br />
€‚PIUHHQIUPHHHD2€‚PIUHHTWQPIHH<br />
PPDTVU2—���<br />
†x„‚2��������2������2�—��—��2—��2—����˜����2��—�����2���2<br />
�—�����D2�—�—�2�������2�������2��—�����D2—��2—��2��2������2<br />
��—�����F2xeƒh2��������2���������2����—��2���2e��—���2p����2<br />
��—�����<br />
xeY2��—��2��2x€v2��2p�˜��—��2PHHS<br />
pee2�����2������—����<br />
2g���—���—���X<br />
i���������D2���—��D2†yg�D2ƒ†yg�D2���������D2€gf�D2�—������D2<br />
�—��2�—���2���<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62SIFI2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PQTFU2�������@p‰2PHPTA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHIW<br />
2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />
In FY05, the Navy completed supplemental RI work plans for<br />
three former NASD sites (Areas of Concern [AOCs] E, I, and R)<br />
and received regulatory approval. In addition, the Navy<br />
submitted engineering evaluation and cost analyses for four<br />
former NASD sites (AOCs J and R, Solid Waste Management<br />
Units [SWMUs] 6, and 7). For the former VNTR, the Navy<br />
completed a preliminary assessment (PA)/SI work plan for eight<br />
photo-identified/potential AOC (PI/PAOC) sites and received<br />
regulatory approval. The Navy submitted a data summary<br />
report for the original 12 RCRA sites. The Navy also completed<br />
a background soil investigation work plan for the former VNTR<br />
and received regulatory approval. The Navy initiated MMRP<br />
interim removal action at SWMU 4 for the former NASD. The<br />
installation conducted an MMRP SI and expanded range<br />
assessment for the former VNTR. In addition, the Navy<br />
conducted an MMRP surface removal action at discrete sites in<br />
the former live impact area (LIA) and specific beaches and<br />
roads at the former VNTR. The Navy completed a charter for<br />
the RAB.<br />
p‰HT2s‚€2€�������<br />
The Navy conducted RI/supplemental RIs at three former<br />
NASD sites (AOCs E, I, and R). The Navy also initiated a<br />
background soil investigation and PA/SI at eight PI/PAOC sites<br />
at the former VNTR. The cost of completing environmental<br />
restoration has changed significantly due to technical issues.<br />
Technical issues delayed the removal actions at four former<br />
NASD sites (AOCs J, R, SWMUs 6, and 7). The installation<br />
completed a draft final work plan for RI at the former NASD<br />
SWMU 4; however, regulatory issues delayed the final RI.<br />
p‰HT2ww‚€2€�������<br />
The Navy completed a time-critical removal action surface<br />
removal of munitions and explosives of concern (MEC) from<br />
200 acres of the approximately 900 acres on the LIA. The Navy<br />
completed the work plan for the Phase II SI and expanded<br />
range assessment.<br />
Technical issues delayed the Phase II MMRP interim removal<br />
action at former NASD SWMU 4. Regulatory issues delayed the<br />
subsurface removal of MEC at selected beaches to be utilized<br />
by DOI and FWS.<br />
€�—�2��2e����<br />
Plan of action items for Naval Facilities on Vieques are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Complete RI report at five former NASD sites<br />
(AOCs E, I, J, 6, and 7) in FY07.<br />
0 Complete RI and, if necessary, initiate<br />
supplemental RI for the former NASD (AOC R)<br />
in FY07.<br />
0 Perform removal actions at four former NASD<br />
sites (AOCs J, R, SWMUs 6, and 7) in FY07.<br />
0 Complete the background soil investigation<br />
and PA/SI at eight PI/PAOC sites at the<br />
former VNTR in FY07.<br />
0 Prepare NFA proposed remedial action plans<br />
for nine sites in FY07.<br />
0 Initiate RI at former NASD site SWMU 4 in<br />
FY07.<br />
22222ww‚€<br />
0 Complete burn plan for vegetative removal in<br />
LIA and Eastern Conservation Area on VNTR in<br />
FY07.<br />
0 Complete time-critical removal action surface<br />
removal of MEC on 300 acres, of the remaining<br />
700 acres on the LIA in FY07.<br />
0 Conduct subsurface removal of MEC at selected<br />
beaches and roads in FY07.<br />
0 Conduct the Phase II SI for the former VNTR<br />
in FY07.<br />
M-141<br />