Historically, the St. Juliens Creek Annex has been used since<br />
1849 for storing, loading, assembling, issuing, and receiving<br />
naval ammunition. Contamination resulted from past handling<br />
of, and operations involving, hazardous materials. The initial<br />
assessment study revealed low concentrations of ordnance<br />
materials throughout the facility. An administrative record was<br />
established in FY99. The EPA placed the facility on the NPL in<br />
August 2000, and the Navy signed a federal facility agreement<br />
(FFA) in July 2004. The installation formed a Restoration<br />
Advisory Board in FY00 and completed a community relations<br />
plan (CRP) in FY01.<br />
Fifteen sites and 12 areas of concern (AOCs) have been<br />
identified at this installation. The installation completed a<br />
Record of Decision (ROD) for Site 6 in FY03, Site 4 in FY04,<br />
and Site 3 in FY06. The cleanup progress at St. Juliens Creek<br />
Annex for FY02 through FY05 is detailed below.<br />
In FY02, the installation finalized the engineering evaluation<br />
and cost analysis (EE/CA) and action memorandum for Sites 3<br />
and 6, and the interim remedial action (IRA) was initiated. A site<br />
screening assessment (SSA) closed 14 sites/AOCs. The<br />
ecological risk assessment (ERA) work plan for Sites 3, 4, 5,<br />
and 6 was completed. The Navy completed an inventory of all<br />
Military Munitions Response Program (MMRP) sites. No MMRP<br />
sites were identified at this installation.<br />
In FY03, the installation completed a draft remedial<br />
investigation (RI)/human health risk assessment (HHRA)/ERA<br />
for Site 2, as well as a draft feasibility study for Site 4. The<br />
installation also completed the final RI/HHRA/ERA report for<br />
Sites 3, 4, 5, and 6. St. Juliens Creek Annex completed a draft<br />
work plan for the IRA at Site 3. In addition, the installation<br />
completed a final work plan for the SSA addendum at Site 8<br />
and AOCs 13, 14, and K, and a site inspection (SI) at Sites 19,<br />
21, and AOC 1. A final site-specific work plan and sampling<br />
analysis plan for the basewide groundwater background<br />
investigation report was completed. The final technical<br />
memorandum site delineation/supplemental RI for Site 3 was<br />
completed. The final Site 6 closeout report and Site 3 removal<br />
summary was completed. The master project plan was updated<br />
and finalized. The final ROD for Site 6 was completed. The<br />
Navy<br />
†eQIUHHPUSVIHH<br />
RWH2—���<br />
€������2�—�—�2�������2�—���2—��2�—�����2—��������—����2—��2<br />
�—���������2�—�������2���2���2��—�˜�2x������2x—�—�2ƒ����—��2<br />
—��2�����2��—�2x—��2—��������<br />
SHFHY2��—��2��2x€v2��2e�����2PHHH<br />
ppe2������2��2t���2PHHR<br />
€��������D2��—��2���—��D2ƒ†yg�D2��������D2����������<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62IQFI2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PIFV2�������@p‰2PHPTA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIRGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
installation completed the final work plan for the Blows Creek<br />
baseline ERA (BERA) (Phase I).<br />
In FY04, the installation conducted supplemental investigations<br />
for Sites 2 and 5, and a BERA for Blows Creek. The final<br />
confirmation closeout report and construction closeout report<br />
for the Site 3 IRA were also completed. The installation<br />
completed the RI/HHRA/ERA for Site 2, as well as a final FFA.<br />
Additionally, the background investigation report SSA<br />
addendum for groundwater was completed. A draft Phase II<br />
expanded RI work plan technical memo for Site 2 was<br />
completed, along with a supplemental SI technical memo of<br />
Sites 19 and 21. The installation also completed a final ROD<br />
and remedial decision for Site 4. The installation completed a<br />
final IRA (Phase II) work plan for Site 3 and conducted the<br />
removal action. The final confirmation closeout report and<br />
construction closeout report for the Site 3 IRA (Phase II) were<br />
also completed. The installation completed a draft SSA<br />
addendum at Site 8 and AOCs 13, 14, and K, along with a draft<br />
SI at Sites 8, 19, 21, and AOC 1. The installation also<br />
completed a draft watershed contaminated source document<br />
for the southern branch of the Elizabeth River watershed.<br />
In FY05, the installation conducted a draft expanded RI (ERI)<br />
for Site 2 and completed the final proposed RA plan and draft<br />
ROD for Site 3. It also completed the final specifications, work<br />
plan, basis of design, and construction of the soil cover for Site<br />
4. For Site 5, the installation completed the draft final<br />
RI/HHRA/ERA and the draft EE/CA. The installation completed<br />
the final supplemental SI report and draft EE/CA for Site 19.<br />
The Navy awarded a contract for hot spot removal. The<br />
installation conducted screening site inspection (SSI) and<br />
completed a work plan for additional groundwater delineation<br />
activites at Site 21. It completed the Phase II Blow's Creek<br />
BERA work plan and conducted the field activities. The<br />
installation finalized the watershed contaminated source<br />
document for the Southern Branch of the Elizabeth River<br />
Watershed. The installation implemented engineering controls<br />
at various <strong>Installation</strong> Restoration Program (IRP) sites. The<br />
Navy developed a draft updated CRP.<br />
p‰HT2s‚€2€�������<br />
St. Juliens Creek Annex completed an RA, RA completion<br />
report, groundwater monitoring plan, and land use control<br />
remedial design at Site 4. The installation completed a draft ERI<br />
for Site 2 and final ERI for Site 5. The installation finalized a<br />
ROD for Site 3. Additionally, the Navy completed a final EE/CA,<br />
action memorandum, IRA, and construction closeout report at<br />
Site 19. The cost of completing environmental restoration has<br />
changed significantly due to technical issues.<br />
Technical issues delayed the field activities for the storm sewer<br />
video survey and repairs. The installation completed a draft SSI<br />
report for Site 21; however, technical issues delayed final<br />
completion. Technical issues also delayed the final RI for Sites<br />
2 and 5, and the treatability study (TS) for Site 2.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
g���—��—��D2†������—<br />
€�—�2��2e����<br />
Plan of action items for St. Juliens Creek Annex are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Create a conceptual site model and conduct a<br />
Triad approach investigation at Site 2 in<br />
FY07.<br />
0 Finalize the EE/CA and perform<br />
preconfirmation sampling at Site 5 in FY07.<br />
0 Complete a final closeout report for Site 19<br />
in FY07.<br />
0 Conduct additional groundwater and storm<br />
water delineation activities at Site 21,<br />
finalize the SSI report, and initiate a TS in<br />
FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />