Fort Riley provides facilities for several active and reserve Army<br />

combat brigades. EPA placed Fort Riley on the NPL in 1990.<br />

The installation has five operable units (OUs): Southwest<br />

Funston Landfill (OU 1), Pesticide Storage Facility (OU 2), Dry<br />

Cleaning Facilities Area (OU 3), Former Fire Training<br />

Area-Marshall Army Airfield (OU 4), and 354 Area Solvent<br />

Detections (OU 5). Groundwater contamination from OU 4 no<br />

longer extends off-post. The Army completed a 5-year review<br />

for OUs 1 and 2 in FY02. The installation formed a Restoration<br />

Advisory Board (RAB).<br />

Environmental studies identified 72 sites at Fort Riley. To date,<br />

the installation completed four Records of Decision (RODs) for<br />

OUs 1, 2, 4, and 5. The cleanup progress at Fort Riley for FY02<br />

through FY05 is detailed below.<br />

In FY02, the installation completed the 5-year review, which<br />

was reviewed by the public and the RAB and approved by EPA.<br />

The installation initiated the feasibility study (FS) for OU 4. The<br />

Army installed an alternate water supply for affected off-post<br />

properties to meet a lawsuit judgment. The installation<br />

completed a remedial investigation (RI) addendum work plan<br />

and fieldwork for additional investigations of OU 3 and an RI for<br />

a baseline risk assessment for OU 5. The installation initiated<br />

an engineering evaluation and cost analysis (EE/CA) for the OU<br />

5 hot spot removal. The site investigation (SI) for the<br />

petroleum/oil/lubricants (POL) Tank Farm continued and the<br />

installation initiated an SI for the abandoned gasoline line<br />

(AGL).<br />

In FY03, the installation submitted the FS for OU 4 for<br />

regulatory review. The SIs for the POL Tank Farm and AGL<br />

continued. The Army initiated an inventory of closed,<br />

transferred, and transferring ranges and sites with unexploded<br />

ordnance, discarded military munitions, or munitions<br />

constituents.<br />

In FY04, the installation completed the RI addendum and<br />

initiated the FS addendum for OU 3. The installation completed<br />

the proposed plan (PP) and initiated the ROD for OU 4. The<br />

installation completed the RI and initiated the FS for OU 5. The<br />

Army developed a technical memorandum for characterization<br />

of the open burning/open detonation (OB/OD) range. The<br />

Army<br />

uƒUPIRHPHUSTHH<br />

IHHDTST2—���<br />

€������2��—�����D2��—������D2—��2������—˜�����2���2���2<br />

��������2��˜—�2˜���—���2—��2���2��������2�����Y2�����2—�2<br />

������2��—���—�����2���2�����2���—�—��2˜���—���Y2—����2—��2<br />

�������2��������2�����<br />

QQFVY2��—��2��2x€v2��2e�����2IWWH<br />

seq2������2��2t���2IWWI<br />

ƒ�������D2���������D2��—�<br />

2w���—2e������X<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62TVFR2�������<br />

2i��F2g„g2@g���2‰�—�AX 62IPFW2�������@p‰2PHITA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIIGp‰2PHIT<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

installation completed Phase I of the SI for the POL Tank Farm<br />

and began monitoring to determine future actions. The Army<br />

conducted the initial Military Munitions Response Program<br />

(MMRP) site visit and a historical records review for the MMRP<br />

SI.<br />

In FY05, Fort Riley completed the FS addendum for OU 3. The<br />

installation completed a ROD and initiated a remedial<br />

design/remedial action (RD/RA) plan for OU 4. Additionally, the<br />

installation completed an FS and a PP, and initiated a ROD for<br />

OU 5. The Army completed an EE/CA and the associated<br />

public comment period for the AGL. The Army also completed a<br />

technical memorandum for the OB/OD area and installed a new<br />

monitoring well. The installation completed Phase II of SI for<br />

POL Tank Farm and developed a plan to address multiple sites<br />

previously listed as response complete under an expanded SI.<br />

The installation generated the historical records review report<br />

and conducted SI sampling at the MMRP sites. The installation<br />

held a public comment period and public meeting for the OU 5<br />

PP in conjunction with the July 2005 RAB meeting. The<br />

installation also developed a revised community involvement<br />

plan.<br />

p‰HT2s‚€2€�������<br />

Fort Riley completed the pilot study at OU 3. The installation<br />

completed the RD/RA plan and initiated monitored natural<br />

attenuation (MNA) remedy for OU 4. The Army completed the<br />

ROD for OU 5, in addition to sampling and analysis for an<br />

expanded SI. The installation also initiated a<br />

performance-based contract for long-term management for<br />

OUs 3, 4, and 5.<br />

Regulatory issues delayed the OU 3 FS addendum (FSA) and<br />

PP, and the development of the RD/RA plan for OU 5.<br />

Contracting issues delayed the removal action under the EE/CA<br />

for the AGL.<br />

p‰HT2ww‚€2€�������<br />

Fort Riley submitted the SI report.<br />

t������2g���D2u—��—�<br />

€�—�2��2e����<br />

Plan of action items for Fort Riley are grouped below according<br />

to program category.<br />

22222s‚€<br />

0 Complete pilot study report, revise FSA,<br />

generate PP, and begin ROD development for OU<br />

3 in FY07.<br />

0 Continue MNA remedy monitoring at OU 4 in<br />

FY07.<br />

0 Complete RD/RA plan and initiate MNA remedy<br />

at OU 5 in FY07.<br />

0 Complete removal action at AGL and begin site<br />

monitoring FY07.<br />

22222ww‚€<br />

0 Initate the RI/FS for the Sherman Heights<br />

Small Arms Range Impact Slope in FY07.<br />