Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
e�������2e��2p���2f—�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
The mission of Andersen Air Force Base (AFB) is to provide<br />
troops, equipment, and facilities in the Pacific. EPA placed the<br />
installation on the NPL in October 1992 and the Air Force<br />
signed a federal facility agreement (FFA) in March 1993. In<br />
2005, the BRAC Commission recommended Anderson AFB for<br />
realignment. Preliminary assessments (PAs) have identified<br />
landfills, waste piles, fire training areas, hazardous waste<br />
storage areas, and spill sites. In 1995, the technical review<br />
committee was converted to a Restoration Advisory Board<br />
(RAB). The base community relations plan was updated in<br />
FY98. A 5-year review was completed in FY04.<br />
The 50 sites identified at Andersen AFB were consolidated into<br />
39 sites and grouped into 6 operable units (OUs). To date,<br />
Guam EPA and EPA Region 9 have signed Records of<br />
Decision (RODs) for the Marianas Bonins (MARBO) OU, the<br />
Harmon OU, and the Urunao OU. The cleanup progress at<br />
Andersen AFB for FY02 through FY05 is detailed below.<br />
In FY02, the installation submitted engineering evaluation and<br />
cost analysis (EE/CA) reports for Sites FTA 2 and Landfill (LF)<br />
8 for review by regulators. Groundwater monitoring continued at<br />
the installation. The Harmon OU ROD was approved and<br />
signed by EPA Region 9 and awaited signature by the Guam<br />
EPA and the Air Force.<br />
In FY03, the installation continued long-term operations for<br />
Sites LF 2 and FTA 2, as well as groundwater monitoring for<br />
the MARBO and Main Base OUs. Negotiations with regulators<br />
resulted in reducing the required number of wells, frequency of<br />
sampling, and number of analytes. The base finalized two<br />
EE/CA reports for LFs 8 and 17, and FTA 2, the no further<br />
remedial action (RA) planned report for Site CSA 1, and two<br />
remediation verification reports (RVRs) for the polychlorinated<br />
biphenyl (PCB) storage area and LF 2, and converted three<br />
areas of concern (AOCs) to <strong>Installation</strong> Restoration Program<br />
(IRP) sites. Additionally, 23 AOCs were added to the IRP. The<br />
installation initiated the MARBO 5-year review. RAB activities<br />
continued and the installation maintained good communication<br />
with regulators.<br />
In FY04, Andersen AFB initiated the preliminary design of the<br />
Urunao dump site remediation. The installation completed the<br />
Air Force<br />
q…WSUQHWWSIWHH<br />
ISDHHH2—���<br />
€������2������D2���������D2—��2�—�������2��2���2€—���<br />
SHFHHY2��—��2��2x€v2��2y��˜��2IWWP<br />
ppe2������2��2w—��2IWWQ<br />
w��—��D2—���—��D2�������D2€gf�D2†yg�<br />
q������—���2—��2����<br />
62IHHFR2�������<br />
2i��F2g„g2@g���2‰�—�AX 62RSFH2�������@p‰2PHIRA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHIQ<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
RA for Site WP 6 and obtained regulatory inspection and<br />
approval. The interim RA (IRA) involving the fence installation<br />
land use control for Site LF 10 was completed. The installation<br />
finalized Sites WP 6 and LF 10 RVRs. Groundwater sampling<br />
was conducted as scheduled for MARBO and the Main Base.<br />
The installation finalized the 5-year review for final coordination<br />
and signatures.<br />
In FY05, Andersen AFB began EE/CA investigations for former<br />
AOC Sites DA 52, 53, and 54, completed fieldwork for 13 of 23<br />
former AOCs [Northeast (NE) sites], and began drafting PA/site<br />
inspection (SI) reports. The installation converted 33 AOCs (NE<br />
sites) to IRP sites, bringing the total site count to 76. The<br />
Urunao ROD was signed by all three parties. The remedial<br />
design for the Urunao Dump site was completed. In addition,<br />
the no action ROD for the Harmon OU was signed by the Air<br />
Force. The installation continued Main Base and MARBO<br />
groundwater monitoring and completed two new borings in<br />
MARBO and one new boring at Site FTA 2. The Air Force<br />
began the PAs for all newly identified sites (former AOCs or NE<br />
sites). The Air Force also began the PAs for Military Munitions<br />
Response Program (MMRP) sites.<br />
p‰HT2s‚€2€�������<br />
Andersen AFB completed the IRA and RVR for the Ritidian<br />
Dump site. The installation also completed the IRA for LF 14,<br />
and started the IRA for LFs 19 and 20. Additionally, the<br />
installation completed a remedial investigation and feasibility<br />
study (RI/FS) for former AOC Sites DA 52, 53, 54, and FTA 2.<br />
The Air Force finalized the PA/SI for 33 former AOCs, and two<br />
additional solid waste management unit sites were added to the<br />
IRP site list. The installation awarded the $8.4 million<br />
RA-construction Part 1 for the Urunao dump sites, and signed a<br />
30-month right of entry between the landowner and the Air<br />
Force to enter the site for cleanup. The cost of completing<br />
environmental restoration has changed significantly due to<br />
changes in estimating criteria.<br />
Administrative issues delayed the RA project for the Urunao<br />
Dump site and LFs 8, 13, and 17. Technical issues delayed the<br />
IRA for LFs 19 and 20. Technical issues also delayed<br />
finalization of the ROD for Main Base Sites FTA 2, WPs 1 and<br />
2, and LFs 14, 19, and 20. Administrative issues delayed the<br />
finalization of the RI/FS report and no action ROD for the<br />
Northwest (NW) Field OU.<br />
p‰HT2ww‚€2€�������<br />
The Air Force continued the PAs at all identified sites. Cost<br />
estimates were updated and the initial Munitions Response Site<br />
Prioritization Protocol rating for each MMRP site was<br />
developed.<br />
€�—�2��2e����<br />
Plan of action items for Andersen Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Continue the IRA for LFs 19 and 20 in FY07.<br />
0 Obtain signatures on two RODs for the Main<br />
Base OU in FY07.<br />
0 Award cleanup contracts for LFs 8, 13, and<br />
17 in FY07.<br />
0 Develop exit strategy and shutdown of Site<br />
FTA 2 remedial system (soil vapor<br />
extraction) in FY07.<br />
0 Finalize the ROD for Main Base Sites FTA 2,<br />
WPs 1, and 2, and LFs 14, 19, and 20 in FY07.<br />
0 Finalize the RI/FS report and a no action ROD<br />
for the NW Field OU in FY07.<br />
0 Execute the Urunao Dump site cleanup action<br />
in FY07-FY10.<br />
22222ww‚€<br />
0 Complete the PAs and SIs at all identified<br />
sites by the end of FY07 and FY10,<br />
respectively.<br />
‰���D2q�—�<br />