Yorktown Naval Weapons Station (NWS) provides ordnance<br />

technical support and related services to the Atlantic Fleet. EPA<br />

placed the installation on the NPL in October 1992, primarily<br />

because of six sites that are hydrologically connected to the<br />

Chesapeake Bay. A federal facility agreement (FFA) was<br />

signed in October 1992. In 2005, the BRAC Commission<br />

recommended Yorktown NWS for realignment. Contaminants<br />

include explosive nitramine compounds and volatile organic<br />

compounds (VOCs) that affect groundwater, surface water, and<br />

sediment. A technical review committee, formed in FY91, was<br />

converted to a Restoration Advisory Board in FY95. In FY02,<br />

the installation updated the community relations plan and<br />

completed a 5-year review.<br />

To date, 49 sites have been identified at this installation.<br />

Yorktown NWS has completed 16 Records of Decision (RODs).<br />

The cleanup progress at Yorktown NWS for FY02 through<br />

FY05 is detailed below.<br />

In FY02, the installation continued remedial action (RA) efforts<br />

at Site 6 with Phase IV. The installation completed the first<br />

5-year review. The RA for groundwater Operable Unit (OU) 1<br />

began. Groundwater monitoring at all applicable sites<br />

continued. The Navy completed an inventory of all Military<br />

Munitions Response Program (MMRP) sites. One MMRP site<br />

was identified at this installation.<br />

In FY03, the installation continued RA efforts at Site 6 with<br />

Phase V. The installation completed an RA at Site 4 and a<br />

removal action at Site 23. Groundwater monitoring at all<br />

applicable sites continued. The remedial investigation (RI) for<br />

groundwater OU 1 continued. The installation signed the final<br />

RODs for two sites. A preliminary assessment (PA) was<br />

initiated for Unexploded Ordnance 000001 (NWS Small Arms<br />

Range).<br />

In FY04, the installation continued the Site 6 RA and finalized a<br />

site screening area (SSA) report for 10 SSAs. In addition, the<br />

installation completed a draft RI for Sites 27, 28, 29, and 30.<br />

Yorktown NWS also initiated an update of master project plans.<br />

The installation completed final Round II RIs for Sites 2, 8, 18,<br />

and SSA 14.<br />

Navy<br />

†eQIUHHPRIUHHH<br />

IHDTPR2—���<br />

€������2����—��2�����—�2�������2—��2���—���2�������Y2<br />

�������2�—�����—��D2������—�����D2���������D2��—����D2<br />

���E��—����D2—��2����—��2���2���2e��—���2p����<br />

SHFHHY2��—��2��2x€v2��2y��˜��2IWWP<br />

ppe2������2��2ƒ�����˜��2IWWR<br />

2g���—���—���X<br />

2w���—2e������X<br />

2p������2��2h—��X<br />

2i��F2g„g2@g���2‰�—�AX<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX<br />

2p���E‰�—�2‚�����2ƒ�—���X<br />

In FY05, Yorktown NWS finalized a No Further Action ROD for<br />

soil at Site 4 and a No Action ROD for Site 18. Site 18 is<br />

complete for all media. The installation finalized work plans for<br />

OU 1 and initiated a Round I RI. The installation completed the<br />

draft final long-term monitoring report for Site 12 and work<br />

plans for investigation of mercury contamination in Ballard<br />

Creek downstream of Site 12. The installation finalized the RI<br />

for Sites 27 through 30. The Site 6 RA continued. The<br />

installation finalized master project plans.<br />

p‰HT2s‚€2€�������<br />

Yorktown NWS completed a No Action ROD for Site 27. In<br />

addition, the installation completed long-term monitoring for<br />

Sites 1, 3, and 7. The installation initiated a baseline ecological<br />

risk assessment (BERA) for the wetlands downgradient of<br />

Site 12.<br />

Contractual issues delayed the Round I RI for groundwater<br />

OU 1.<br />

p‰HT2ww‚€2€�������<br />

The installation completed the PA and initiated the site<br />

inspection (SI) for the Morale, Welfare, and Recreation (MWR)<br />

Skeet Range.<br />

€�—�2��2e����<br />

Plan of action items for Yorktown Naval Weapons Station are<br />

grouped below according to program category.<br />

22222s‚€<br />

0 Complete Round I RI for groundwater OU 1 in<br />

FY07.<br />

0 Initiate Round II RI for groundwater OU 1 in<br />

FY07.<br />

0 Complete No Action ROD for groundwater at<br />

Sites 11 and 17 in FY07.<br />

0 Complete RI and BERA for wetlands<br />

downgradient of Site 12 in FY08.<br />

22222ww‚€<br />

0 Complete field investigation and SI for MWR<br />

Skeet Range in FY07.<br />

e���D2—�˜�����D2����������D2—�����D2���D2��—�D2������D2<br />

€er�D2†yg�D2�—���2��������D2��������D2€gf�D2�—���2����D2�����D2<br />

�—�������<br />

q������—���D2����—�2�—���D2��������D2����<br />

62RSFT2�������<br />

62PPFS2�������@p‰2PHIRA<br />

p‰2PHIIGp‰2PHIH<br />

g��������2—��2��—����<br />

‰�������D2†������—<br />

M-214

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!