Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
h������2h�����˜�����2h����2ƒ—�2t�—����D2„�—�2p—����� x€v<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Defense Distribution Depot (DDD) San Joaquin, Tracy Facility<br />
stores and distributes supplies and equipment for DoD. EPA<br />
placed DDD San Joaquin, Tracy Facility on the NPL in August<br />
1990 and the installation signed a federal facility agreement<br />
(FFA) in 1991. Sites at this installation include burn and<br />
disposal pits, underground storage tanks (USTs), hazardous<br />
waste storage sites, and other areas of contamination.<br />
Contamination has been identified in on-site soil and off-site<br />
groundwater. The installation completed a 5-year review in<br />
FY05.<br />
To date, response complete has been achieved at 61 of the 73<br />
identified sites at this installation. Two Records of Decisions<br />
(RODs) have been signed, one for the treatment of<br />
groundwater contamination and one sitewide comprehensive<br />
ROD. The cleanup progress at DDD San Joaquin, Tracy<br />
Facility for FY02 through FY05 is detailed below.<br />
In FY02, operation and optimization of the Operable Unit (OU)<br />
1 groundwater treatment systems continued. The draft former<br />
UST sites preferred alternative report was submitted,<br />
recommending no further action (NFA) or monitored natural<br />
attenuation (MNA) for remaining open sites. The operation of<br />
the soil vapor extraction (SVE) system continued. Small<br />
excavation Sites 6, 20, and 27 were completed. The wet<br />
season controls Site 4 remedial action (RA) report was<br />
completed. The draft Site 67 northern depot area cover<br />
installation RA report was submitted. The Phase II remedial<br />
process optimization evaluation was completed.<br />
In FY03, the installation completed a former UST sites<br />
preferred alternative report and recommended 12 sites for NFA<br />
and 1 site for MNA. RAs for Site 8 and SVE sites were<br />
completed. The installation completed an RA report for Site 27<br />
and converted treatment plant (TP) 1 to granular activated<br />
carbon. The installation implemented pesticide treatment for TP<br />
1. Operation and optimization of the OU 1 groundwater<br />
treatment systems continued.<br />
In FY04, DDD San Joaquin, Tracy Facility completed the<br />
sitewide ROD amendment and the sitewide ROD explanation of<br />
significant differences for various sites. The installation also<br />
completed three RA reports: one for Solid Waste Management<br />
DLA<br />
geWWUISHTVPUHH<br />
WHV2—���<br />
ƒ����2—��2������˜���2����—�D2�������D2����D2��������D2��������—�D2<br />
����������D2����—��D2—��2�����2��������2—��2���������<br />
QUFITY2��—��2��2x€v2��2e�����2IWWH<br />
ppe2������2��2IWWI<br />
g������—���2��������D2��—��2���—��D2���������D2€yv�D2†yg�<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62WUFQ2�������<br />
2i��F2g„g2@g���2‰�—�AX 62SWFQ2�������@p‰2PHRSA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHSGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
Unit (SWMU) 8; one for SWMUs 4, 6, and 20; and one for<br />
Defense Site Environmental Tracking System 67. The facility<br />
also continued operations and maintenance (O&M), monitoring,<br />
and optimization of groundwater treatment systems.<br />
In FY05, installation completed the 5-year review, which<br />
included an outline of the draft Response Completion and<br />
Resource Management Plan (exit strategy). The installation<br />
continued O&M, monitoring, and optimization of groundwater<br />
treatment systems. Additionally, the installation continued<br />
trichloroethylene (TCE)/pertetrachloroethylene (PCE) SVE and<br />
total petroleum hydrocarbons bioventing sites RA.<br />
p‰HT2s‚€2€�������<br />
DDD San Joaquin, Tracy Facility completed the draft sitewide<br />
Preliminary Closeout Report (PCOR) and the draft Response<br />
Completion and Resource Management Plan. The installation<br />
shut down the pesticide treatment plant portion of the<br />
groundwater treatment System. The installation continued<br />
O&M, monitoring, and optimization of groundwater treatment<br />
systems and groundwater well monitoring network.<br />
The installation initiated the update of the community relations<br />
plan (CRP). DDD San Joaquin, Tracy continued operation of<br />
the TCE PCE SVE system RA due to containment re-bound,<br />
delaying the completion of the RA report. The installation<br />
completed the TPH bioventing and will be reported in the same<br />
RA as SVE. DDD San Joaquin, Tracy also submitted the draft<br />
response plan (formerly known as the exit strategy) to the<br />
regulatory agencies with a schedule for a draft final and final<br />
plan.<br />
p‰HT2ww‚€2€�������<br />
DLA has identified no Military Munitions Response Program<br />
(MMRP) sites at this installation.<br />
„�—�D2g—�������—<br />
€�—�2��2e����<br />
Plan of action items for Defense Distribution Depot San<br />
Joaquin, Tracy Facility are grouped below according to program<br />
category.<br />
22222s‚€<br />
0 Complete the update of the CRP in FY07.<br />
0 Complete the sitewide PCOR in FY07.<br />
0 Continue groundwater treatment system and<br />
monitoring well network O&M, monitoring, and<br />
optimization in FY07.<br />
0 Complete and implement the Response<br />
Completion and Resource Management Plan<br />
including alternative technology studies,<br />
feasibilty study, and risk assessment, and OU<br />
1 ROD in FY07-FY08.<br />
0 Complete the OU 2 TCE/PCE SVE system RA and<br />
RA report, OU 2 ROD amendment, and potential<br />
OU 2 delisting in FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
M-47