07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

€—������2‚����2x—�—�2e��2ƒ�—���� x€vGf‚eg2PHHS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

2p������2��2h—��X<br />

€�������2„�2h—��<br />

Patuxent River Naval Air Station (NAS) tests and evaluates<br />

naval aircraft systems. Three sites were placed on the NPL in<br />

May 1994: a Fishing Point Landfill site (Site 1), the former<br />

sanitary landfill (Site 11), and the pest control shop (Site 17).<br />

Wastes managed at the sites included mixed solid wastes,<br />

petroleum/oil/lubricants (POLs), paints, thinners, solvents,<br />

pesticides, and photographic laboratory wastes. In 2005, the<br />

BRAC Commission recommended Patuxent River NAS for<br />

realignment. The installation formed a technical review<br />

committee in FY90 and completed a community relations plan<br />

in FY91, which is updated every three years. A Restoration<br />

Advisory Board that meets quarterly was established in FY94.<br />

The Navy regularly updates an administrative record and two<br />

information repositories. The installation completed 5-year<br />

reviews in FY01 and FY04.<br />

To date, Patuxent River NAS has identified 62 sites. The<br />

installation completed Record of Decision (ROD) documents for<br />

Sites 1, 11, and 12. In addition, a ROD amendment was<br />

completed for Site 17. The installation closed Site 6A (6<br />

Operable Unit [OU] 1) in FY04. The cleanup progress at<br />

Patuxent River NAS for FY02 through FY05 is detailed below.<br />

In FY02, the installation completed investigations for Sites 13,<br />

36, 38, and 53; subsequent no further action (NFA) decision<br />

documents were completed. The Navy initiated two watershed<br />

ecological studies. The installation completed accelerated<br />

investigations for Site 27, a National Guard facility on the NAS.<br />

Patuxent River NAS conducted 5-year reviews on a<br />

site-specific basis, as only three sites required such reviews<br />

(Sites 1/12, 11, and 17). The Navy completed an inventory of all<br />

Military Munitions Response Program (MMRP) sites. No MMRP<br />

sites were identified at this installation.<br />

In FY03, Site 37 reached closeout with NFA required. In<br />

addition, the installation completed investigations for Sites 48,<br />

49, 50, and 52. The installation initiated the remedial<br />

investigation and feasibility study (RI/FS) efforts at Sites 4, 5, 6<br />

(OU 2), 11 (OU 2), 17 (OU 2), and 46, exceeding the goal of<br />

four sites. It also initiated preliminary assessment and site<br />

inspection efforts at five sites, exceeding the goal of two sites.<br />

One ROD was completed. Interim remedial action (IRA) work at<br />

Sites 4 and 5 proceeded on schedule.<br />

Navy<br />

whQIUHHPRSQTHH<br />

TDVHH2—���<br />

„���2—��2��—��—��2�—�—�2—���—��2�������<br />

QTFVUY2��—��2��2x€v2��2w—�2IWWR<br />

x���<br />

r�—��2���—��D2���������D2���—���D2€yv�D2��������D2…ˆy<br />

q������—���D2����—�2�—���D2��������D2����<br />

62SPFR2�������<br />

2i��F2g„g2@g���2‰�—�AX 62QQFP2�������@p‰2PHIRA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIQGx���<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

In FY04, the installation closed Site 6A (6 OU 1) and Site 46 via<br />

completion of the RI/FS and NFA ROD. Patuxent NAS also<br />

completed a basewide 5-year review with no outstanding<br />

actions requiring further action.<br />

In FY05, Patuxent River NAS completed the FS, and the<br />

proposed remedial action plan (PRAP)/ROD for Sites 1/12 OU<br />

2 and the Rifle Range Landfill. The installation completed two of<br />

four RI/FS documents, and four of eight desktop evaluations.<br />

p‰HT2s‚€2€�������<br />

Patuxent River NAS completed the RI/FS and PRAP/ROD for<br />

Site 17 OU 2. The installation achieved NFA at five sites.<br />

Funding delays impacted the starting dates of the Site 1/12 OU<br />

2 remedial design (RD)/RA and Site 31 IRA. Additionally,<br />

funding issues delayed the RD/RA of Site 17<br />

OU 2.<br />

p‰HT2ww‚€2€�������<br />

The Navy has identified no MMRP sites at this installation.<br />

€�—�2��2e����<br />

Plan of action items for Patuxent River Naval Air Station are<br />

grouped below according to program category.<br />

22222s‚€<br />

0 Complete Site 17 OU 2 RD/RA in FY07.<br />

0 Complete Site 1/12 OU 2 RD/RA and Site 31 IRA<br />

in FY07.<br />

0 Initiate RD/RA at Site 4 in FY07.<br />

0 Complete Site 5 RI/FS and RD/RA in FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

v��������2€—��D2w—���—��<br />

M-161

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!