€�������2„�2h—��<br />
Environmental studies at Richards-Gebaur Air Reserve Station<br />
(ARS) began in FY82. In July 1991, the BRAC Commission<br />
recommended closure of the installation and it was closed on<br />
September 30, 1994. Prominent site types identified at the<br />
installation include a fire training area, vehicle maintenance<br />
areas, hazardous waste drum storage areas, fuel storage<br />
areas, and underground storage tanks (USTs). An<br />
Environmental Baseline Survey (EBS) was completed in FY94.<br />
The installation formed a Restoration Advisory Board (RAB) in<br />
1994, which adjourned in FY04 after unanimous agreement that<br />
their mission had been completed. The community relations<br />
plan (CRP) was updated in FY04 to indicate the status of<br />
remediation efforts and identify ongoing opportunities for<br />
community involvement.<br />
The basewide evaluation and consolidation study, completed in<br />
FY99, identified 23 sites. Of the 23 sites, 3 sites required no<br />
further response action planned (NFRAP) decision documents<br />
(DDs), 16 sites required remedial investigations (RIs), and the<br />
remaining 4 sites, as well as 6 subsequently identified sites,<br />
required closure under Missouri RCRA-C UST regulations. The<br />
installation completed the Records of Decision (ROD) for<br />
Operable Units (OUs) 1 and 2 in FY04. In FY06,<br />
Richards-Gebaur ARS transferred environmental responsibility<br />
for <strong>Installation</strong> Restoration Program (IRP) sites SS 003 and SS<br />
009 to the Marine Corps. The cleanup progress at<br />
Richards-Gebaur ARS for FY02 through FY05 is detailed<br />
below.<br />
In FY02, the Air Force submitted a supplemental RI report to<br />
regulators for two new sites identified as a result of the EBS site<br />
inspection. The engineering evaluation and cost analysis was<br />
approved by regulators and remedial actions (RAs) were<br />
completed to address contaminated soil sites. RAs for the EBS<br />
sites were completed. A draft feasibility study (FS) and<br />
proposed plan (PP) were completed. The Air Force, along with<br />
the U.S. Army Corps of Engineers, held quarterly RAB<br />
meetings to keep the public informed of ongoing environmental<br />
activities at the base.<br />
In FY03, the draft ROD for OUs 1 and 2 was completed and<br />
submitted to regulators. The interim action report for soil and<br />
sediment for OU 1, the focused FS for OU 1, and the FS for OU<br />
Air Force<br />
wyUSUHHPRPWPHH<br />
RPW2—���<br />
ƒ�����2—�2����2��2���2RRP�2p������2‡���Y2���������2eEIH2<br />
—���—��<br />
xGe<br />
x���<br />
€yv�D2€er�D2€gf�D2†yg�D2��—��2���—��<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62IIFI2�������<br />
2i��F2g„g2@g���2‰�—�AX 62QFI2�������@p‰2PHQTA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHRGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X …�����—�2—��2��—����<br />
2 were completed and received regulatory concurrence.<br />
NFRAP DDs were completed for Areas of Concern (AOCs) 001<br />
and 002, and Sites OT 010 and ST 007, which attained<br />
residential soil remediation goals. The NFRAP DDs for AOCs<br />
001 and 002 and Site OT 010 were signed. The installation<br />
completed a finding of suitability to transfer for Parcels K and L.<br />
A PP was completed and presented to the community.<br />
In FY04, the ROD for OUs 1 and 2 was completed and signed.<br />
The NFRAP DD was completed and signed for Site ST 007.<br />
The Air Force conducted an inventory of Military Munitions<br />
Restoration Program (MMRP) sites. No MMRP sites were<br />
identified at this installation. The CRP was updated to indicate<br />
the status of remediation efforts and identify ongoing<br />
opportunities for community involvement. The RAB adjourned<br />
after the members unanimously agreed that their mission had<br />
been completed.<br />
In FY05, the installation completed the land use<br />
control/institutional control (LUC/IC) management plan and<br />
updated the groundwater monitoring plan. The installation also<br />
conducted semiannual groundwater monitoring at six sites and<br />
annual LUC/IC inspections. In addition, the installation<br />
transferred the remainder of base property to the City of<br />
Kansas City and the Marine Corps Reserves.<br />
p‰HT2s‚€2€�������<br />
The installation conducted semiannual groundwater monitoring<br />
at six sites and conducted the annual LUC/IC inspections. The<br />
Air Force conducted field activities associated with the first<br />
5-year review and prepared the draft 5-year review report. The<br />
installation transferred environmental responsibility for IRP sites<br />
SS 003 and SS 009 to the Marine Corps.<br />
Richards-Gebaur ARS initiated meetings with the Kansas City<br />
Port Authority to evaluate the feasibility of entering into an<br />
environmental services cooperative agreement (ESCA) for<br />
responsibility of long-term management of the remaining<br />
remedies. Technical issues delayed the completion of the<br />
5-year review.<br />
u—��—�2g���D2w�������<br />
p‰HT2ww‚€2€�������<br />
The Air Force has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Richards-Gebaur Air Reserve Station<br />
are grouped below according to program category.<br />
22222s‚€<br />
0 Conduct semiannual groundwater monitoring and<br />
annual LUC/IC inspections in FY07-FY08.<br />
0 Finalize 5-year review and obtain regulator<br />
approval in FY07-FY08.<br />
0 Submit explanation of significant difference<br />
to regulators to remove OU 01 from the ROD in<br />
FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />