Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
x��2v�����2x—�—�2ƒ�˜�—����2f—�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
€�������2„�2h—��<br />
New London Naval Submarine Base maintains and repairs<br />
submarines. Significant sites at the installation include the Area<br />
A landfill (Site 2), a number of smaller disposal areas, and fuel<br />
and chemical storage areas. The Navy placed the installation<br />
on the NPL in August 1990 because of polychlorinated biphenyl<br />
(PCB) contamination at Site 2. In 2005, the BRAC Commission<br />
recommended New London Naval Submarine Base for<br />
realignment. The installation formed a technical review<br />
committee in FY89 and converted it to a Restoration Advisory<br />
Board in FY94. The installation signed a federal facility<br />
agreement (FFA) in January 1995. In FY01, the installation<br />
completed a 5-year review.<br />
Twenty-nine sites have been identified at this installation,<br />
including 22 CERCLA sites, along with underground storage<br />
tanks (USTs) which were grouped into 2 UST sites. The<br />
installation has completed Record of Decision (ROD)<br />
documents for Sites 2, 3, 6, 8, 20, and the basewide<br />
groundwater operable unit (OU). In addition, the installation has<br />
signed No Further Action (NFA) RODs for Sites 4 and 15. The<br />
installation completed the proposed remedial action plan<br />
(PRAP) and ROD for the basewide groundwater OU. The<br />
cleanup progress at New London Naval Submarine Base for<br />
FY02 through FY05 is detailed below.<br />
In FY02, the installation continued groundwater monitoring at<br />
Sites 2, 6, and 8. The Navy completed an inventory of all<br />
Military Munitions Response Program (MMRP) sites. No MMRP<br />
sites were identified at this installation.<br />
In FY03, the Navy performed additional fieldwork in the<br />
adjacent Thames River. The data was included in the feasibility<br />
study (FS) for the lower base sites. The installation completed<br />
the FS for the basewide groundwater OU.<br />
In FY04, the installation completed the PRAP and ROD for the<br />
basewide groundwater OU.<br />
In FY05, New London Naval Submarine Base completed<br />
remedial design for the basewide groundwater OU and for the<br />
Site 7 Soil OU.<br />
Navy<br />
g„IIUHHPPHPHHH<br />
SRU2—���<br />
w—���—��2—��2���—��2��˜�—�����Y2�����2��˜�—����2��—�����2<br />
—��2��˜�—����2����—�2����—��Y2�������2—2����2����2���2<br />
��˜�—�����<br />
QTFSQY2��—��2��2x€v2��2e�����2IWWH<br />
ppe2������2��2t—��—��2IWWS<br />
h�����2������D2������—���2—��D2€yv�D2€gf�D2�����2—���D2<br />
���������D2��������D2����������2��˜���D2���—��D2†yg�<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62THFH2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PQFQ2�������@p‰2PHRPA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIIGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
p‰HT2s‚€2€�������<br />
New London Naval Submarine completed remedial action (RA)<br />
for basewide groundwater OU and the RA at Site 7 Soil OU.<br />
The installation completed a draft 5-year review. Additionally,<br />
the Navy drafted an NFA PRAP for the Defense Reutilization<br />
and Marketing Office (DRMO) Site 6. The cost of completing<br />
environmental restoration has changed significantly due to<br />
technical issues.<br />
Regulatory issues delayed the Thames River study and FS for<br />
the lower base sites.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for New London Naval Submarine Base<br />
are grouped below according to program category.<br />
22222s‚€<br />
0 Finalize 5-year review and ROD for the DRMO<br />
Site 6 in FY07-FY08.<br />
0 Complete Thames River study and award FS for<br />
lower base sites in FY07-FY08.<br />
0 Complete PRAP and ROD for lower base sites in<br />
FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
q�����D2g��������<br />
M-149