In 1988, the BRAC Commission recommended closure of Fort<br />

Wingate. The installation was required to store, test, and<br />

demilitarize munitions. Restoration efforts have focused on land<br />

affected by ordnance-related wastes, unexploded ordnance<br />

(UXO), and other contaminants. The affected areas are the<br />

open burning and open detonation (OB/OD) ground, soil at a<br />

pistol range, pesticide-contaminated soil at Building 5,<br />

explosives-contaminated soil at the former bomb washout plant<br />

lagoons, polychlorinated biphenyl (PCB) contamination in<br />

Buildings 11 and 501, the former explosive washout plant<br />

(Building 503), and three solid waste landfills. In FY94, the<br />

installation formed a BRAC cleanup team (BCT) and a<br />

Restoration Advisory Board (RAB). In FY95, the installation<br />

revised its BRAC cleanup plan. The installation developed a<br />

community relations plan (CRP) in FY06.<br />

The installation has transferred over 5,400 acres to date. The<br />

cleanup progress at Fort Wingate for FY02 through FY05 is<br />

detailed below.<br />

In FY02, the installation demolished Building 11, which was<br />

contaminated with PCBs from paints. The U.S. Army<br />

Environmental Center's Independent Technical Review<br />

approved the installation of additional wells and sampling at the<br />

TNT Leaching Beds. The installation awarded a contract for<br />

characterization and removal of PCB-contaminated soils at<br />

Building 537. The installation submitted a post closure permit<br />

application for the OB/OD ground to New Mexico Environment<br />

Department (NMED) for review and approval. The installation<br />

adopted a program to consider and incorporate cultural<br />

resources into property transfer and cleanup decisions.<br />

In FY03, the installation completed groundwater sampling at the<br />

TNT Leaching Beds. The Army completed an inventory of<br />

closed, transferred, and transferring ranges and sites with UXO,<br />

discarded military munitions or munitions constituents. Seven<br />

Military Munitions Response Program (MMRP) sites were<br />

identified at this installation. The Army completed clearance for<br />

the OB/OD area western boundary fence.<br />

In FY04, the installation completed quarterly groundwater<br />

sampling at the TNT Leaching Beds.<br />

Army<br />

xwTPIQVPHWURHH<br />

PIDVVI2—���<br />

ƒ�����D2�������D2—��2�������2—���������2���������2—��2<br />

��������2��2�˜������2��2��������—���2����������2—��2<br />

—���������<br />

xGe<br />

x���<br />

…ˆyD2€gf�D2���������D2��—��2���—��D2—�˜�����D2<br />

��—�G€gfE˜—���2�—���D2���������2��������<br />

2w���—2e������X<br />

q������—���2—��2����<br />

2p������2��2h—��X<br />

62QUFW2�������<br />

2i��F2g„g2@g���2‰�—�AX 62IQHFV2�������@p‰2PHPIA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHPIGp‰2PHPH<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

In FY05, Fort Wingate removed ash and soil from deactivated<br />

furnace area. The installation completed groundwater sampling<br />

at the OB/OD ground and completed groundwater<br />

investigations at the Eastern Landfill by installing four borings<br />

and two wells. The Army negotiated RCRA post-closure permit<br />

requirements and developed a work schedule and funding<br />

requirements for future cleanup. The installation discussed<br />

future MMRP actions during the RCRA post-closure permit<br />

requirements negotiations.<br />

p‰HT2s‚€2€�������<br />

Fort Wingate was issued a RCRA permit by NMED that<br />

became effective on December 31, 2005. The installation hired<br />

a permanent, on-site BRAC Environmental Coordinator in<br />

November 2005 to oversee the cleanup program and execution<br />

of the RCRA permit. The installation initiated development of a<br />

work plan for the RCRA facility investigation (RFI) at Parcel 21.<br />

Fort Wingate prepared and submitted a historical aerial photo<br />

interpretation report and a hydrogeologic summary report to<br />

NMED. The installation developed the first comprehensive<br />

cost-to-complete in March 2006. The cost of completing<br />

environmental restoration has changed significantly due to<br />

regulatory issues.<br />

The installation held the first RAB and BCT meetings since the<br />

negotiation of the RCRA permit in September 2006. Fort<br />

Wingate has initiated extensive consultation with the Pueblo of<br />

Zuni and the Navajo Nation that will continue for the duration of<br />

the cleanup program. In addition, the installation developed a<br />

CRP, as required by the RCRA permit.<br />

p‰HT2ww‚€2€�������<br />

Fort Wingate initiated development of work plans for the<br />

kick-out area of the OB/OD grounds. As required by the RCRA<br />

permit, a detailed map of all munitions and explosives of<br />

concern (MEC) found since closure of Fort Wingate was<br />

included in the CRP. The installation constructed a 3-mile long<br />

fence along the western boundary of the OB/OD grounds,<br />

which reduces the chance of adjacent property owners<br />

encountering MEC.<br />

€�—�2��2e����<br />

Plan of action items for Fort Wingate are grouped below<br />

according to program category.<br />

22222s‚€<br />

0 Develop cultural resource programmatic and<br />

cooperative agreements with the Pueblo of<br />

Zuni and the Navajo Nation in FY07.<br />

0 Complete summary report of historical<br />

information in FY07.<br />

0 Submit facilitywide ecological-risk work plan<br />

to State in FY07.<br />

0 Prepare RFI work plans for Parcels 11, 12,<br />

and 22 in FY07.<br />

0 Prepare and submit interim groundwater<br />

monitoring plan in FY07.<br />

22222ww‚€<br />

0 Develop OB/OD grounds closure plan in FY07.<br />

0 Complete work plan for defining OB/OD<br />

kick-out area in FY07.<br />

0 Define OB/OD kick-out area and submit report<br />

to State in FY08.<br />

0 Complete the OB/OD grounds closure plan in<br />

FY08.<br />

q—����D2x��2w����<br />