Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
€—����2s��—��2w—����2g����2‚�����2h���� x€v<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The Parris Island Marine Corps Recruit Depot receives,<br />
recruits, and combat-trains enlisted personnel upon their<br />
enlistment in the Marine Corps. EPA placed the installation on<br />
the NPL in December 1994 due to contamination at two landfill<br />
sites. Sites at the installation include landfills or spill areas<br />
where groundwater and sediment are contaminated with<br />
solvents and petroleum/oil/lubricants (POLs). The installation<br />
began to compile an administrative record in FY96 and<br />
completed a community relations plan in FY98. There has been<br />
no community interest in forming a Restoration Advisory Board.<br />
The installation signed a federal facility agreement (FFA) and<br />
completed a 5-year review in FY05.<br />
Investigations have identified 48 potential CERCLA and RCRA<br />
sites and the installation has identified 33 sites. The installation<br />
has signed an interim Record of Decision (ROD) for Sites 1<br />
corrective action plan (CAP), 2, 3, and 12. The cleanup<br />
progress at Parris Island Marine Corps Recruit Depot for FY02<br />
through FY05 is detailed below.<br />
In FY02, the installation completed a remedial investigation (RI)<br />
and submitted the report to the South Carolina Department of<br />
Health and Environmental Control and EPA. The Environmental<br />
Security Technology Certification Program requested Site 45 be<br />
used to test the effectiveness of Chemox in cleaning volative<br />
organic compounds (VOCs) in the groundwater; baseline<br />
testing was completed. The construction of the Site 1 CAP<br />
proceeded as scheduled. This installation submitted a<br />
groundwater monitoring report, which was approved, and<br />
initiated a contamination assessment at a fiber optics vault<br />
where petroleum was discovered during installation. Regulators<br />
approved the monitoring plan for Building 4022. The installation<br />
began planning for a technical review committee. The Navy<br />
completed an inventory of all Military Munitions Response<br />
Program (MMRP) sites. MMRP sites were identified at this<br />
installation.<br />
In FY03, the installation transferred the contamination<br />
assessment at the fiber optic vault from the underground<br />
storage tank program to the <strong>Installation</strong> Restoration Program<br />
(IRP) due to the evidence of chlorobenzene in the groundwater.<br />
The installation injected Chemox at Solid Waste Management<br />
Unit (SWMU) 45 and continued groundwater sampling. The<br />
Navy<br />
ƒgRIUQHPPUTQHH<br />
VDHRQ2—���<br />
‚�����D2������D2—��2��˜—�E��—��2��������2���������2����2<br />
�����2����������2��2���2w—����2g����<br />
SHFHHY2��—��2��2x€v2��2h���˜��2IWWR<br />
ppe2������2��2PHHS<br />
s�������—�2�—����D2���������D2�—����D2€yv�D2��������D2���—��D2<br />
—���D2�����������D2����—��2��������<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62IVFR2�������<br />
2i��F2g„g2@g���2‰�—�AX 62IUFU2�������@p‰2PHISA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHIS<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
initial assessment for implementing the CAP at the gas station<br />
was completed; however, additional assessment was required<br />
and monitoring continued. The installation continued monitoring<br />
Building 4022 and the aviation gasoline (AVGAS) pipeline. The<br />
Site 1 work plan was approved and construction began.<br />
In FY04, the installation developed an RI addendum work plan<br />
to sample the groundwater plume and define the path forward<br />
for SWMU 45. It also completed the RCRA facility assessment<br />
at fiber optic vault Site 55. The installation issued a draft<br />
proposed plan (PP) for SWMU 12. It also completed the landfill<br />
Site 1 CAP, and developed a draft long-term monitoring work<br />
plan. The installation completed the CAP at the Depot gas<br />
station, monitored the AVGAS pipeline and Building 850, and<br />
completed negotiations on the FFA.<br />
In FY05, Parris Island Marine Corps Recruit Depot issued a PP<br />
and draft ROD for Site 12. It awarded a fixed-price<br />
environmental multi-award contract for Site 12 and issued a<br />
draft remedial action work plan. The installation completed a<br />
long-term monitoring work plan for Site 1 and continued<br />
monitoring at Sites 1, 3, and 45. The CAP for the Depot gas<br />
station was implemented and sampling was completed. The<br />
installation also continued work at the Depot gas station and<br />
the AVGAS pipline. The installation received a no further action<br />
letter for Building 850. The installation signed the FFA and<br />
completed a 5-year review.<br />
p‰HT2s‚€2€�������<br />
Parris Island Marine Corps Recruit Depot signed RODs for<br />
Sites 1 CAP and 2. Additionally, the Marine Corps completed a<br />
removal action and signed a ROD for Site 12. The installation<br />
completed the RCRA facility investigation addendum while<br />
continuing a treatability study (TS) and feasibility study (FS) at<br />
Site 45. The Marine Corps continued monitoring at Sites 1 and<br />
3, Depot gas station, and AVGAS pipeline.<br />
p‰HT2ww‚€2€�������<br />
The Navy conducted no MMRP actions at this installation.<br />
€—����2s��—��D2ƒ����2g—�����—<br />
€�—�2��2e����<br />
Plan of action items for Parris Island Marine Corps Recruit<br />
Depot are grouped below according to program category.<br />
22222s‚€<br />
0 Complete TS and FS at Site 45 in FY07-FY08.<br />
0 Continue monitoring at Sites 1 and 3, Depot<br />
gas station, and AVGAS pipeline in FY07-FY08.<br />
0 Develop RI work plan and conduct sampling at<br />
Site 27 in FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />