Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
q�—�2e��—2r—�˜��2g������ f‚eg2IWWS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
€�������2„�2h—��<br />
Guam Apra Harbor Complex consists of Navy commands in the<br />
Apra Harbor area and the former Naval Magazine area<br />
southeast of the harbor. The BRAC Commission recommended<br />
four of the commands (Guam Naval Activities [NAVACTS],<br />
Naval Fleet and Industrial Supply Center, Naval Ship Repair<br />
Facility [NSRF], and Public Works Center [PWC]) for<br />
realignment or closure in 1995. NSRF ceased operations in<br />
September 1997. Operations that contributed to contamination<br />
were support, photographic and printing shops, a dry cleaning<br />
plant, power plants and boilers, pest control operations, and<br />
chemical and medical laboratories. Wastes were stored and<br />
disposed of in landfills and wastewater treatment plants. The<br />
complex completed a joint community relations plan in FY92.<br />
The installation signed an interagency agreement (IAG) in<br />
FY93. A local information repository was established in FY94.<br />
The complex converted its technical review committee to a<br />
Restoration Advisory Board in FY95.<br />
The four commands have 30 CERCLA sites, 26 RCRA sites,<br />
and 8 BRAC sites. The installation has achieved response<br />
complete at 44 sites. The Navy transferred 2,725 acres to the<br />
Government of Guam in FY00 and decided to retain NSRF. To<br />
date, the installation has signed no further action (NFA)<br />
decision documents (DDs) for five sites. The cleanup progress<br />
at Guam Apra Harbor Complex for FY02 through FY05 is<br />
detailed below.<br />
In FY02, the installation completed remedial actions at<br />
NAVACTS Areas of Concern (AOCs) 1 and 3.<br />
In FY03, the installation completed the site closeouts for<br />
NAVACTS solid waste management unit (SMWU) 49 and PWC<br />
AOC 1, and signed NFA DDs for NAVACTS SWMU 49 and<br />
PWC AOC 1. The Navy completed an inventory of all Military<br />
Munitions Response Program (MMRP) sites and identified no<br />
MMRP sites at this installation.<br />
In FY04, the installation completed a NFA DD for NAVACTS<br />
AOC 2, and held a proposed plan (PP) public meeting for AOCs<br />
1 and 3. The installation also negotiated restricted land use for<br />
Site 28 with regulators.<br />
Navy<br />
q…WIUHHPUSQPHHD2q…WIUHHPUSVQHHD2q…WIUHHPUSVSHHD2—��2<br />
q…WIUHHPUSUTHH<br />
ISDQHT2—���<br />
w—���—����2—��2����—���2�—�������Y2��������2�������2—��2<br />
�—����—��Y2������2—��2������2��—����2—��2����—��2��2�������2<br />
��2���2����—����2�����2��2���2x—��2—��2�����2—��������Y2<br />
��������2�������2���2q�—�2x—�—�2e��������<br />
xGe<br />
seq2������2��2p‰WQ<br />
2g���—���—���X<br />
€gf�D2€yv�D2��������D2���������D2��—��2���—��<br />
2w���—2e������X<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62IPQFQ2�������<br />
2i��F2g„g2@g���2‰�—�AX 62QHFW2�������@p‰2PHISA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIRGp‰2PHHU<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
In FY05, Guam Apra Harbor Complex completed NFA DDs for<br />
NAVACTS AOC 1, AOC 3, and PP/draft DD for NAVACTS Site<br />
28. A public meeting and two BRAC cleanup team (BCT)<br />
meetings were held. The BCT performed review of the PP and<br />
both EPA and Guam EPA (GEPA) attended the Navy public<br />
meeting providing cooperative regulator support. The Navy<br />
worked closely with EPA and GEPA to resolve land use control<br />
(LUC)/institutional control language for the DD.<br />
p‰HT2s‚€2€�������<br />
Guam Apra Harbor Complex continued to resolve LUC<br />
language issues concerning transferred parcels. The cost of<br />
completing environmental restoration has changed significantly<br />
due to technical issues and changes in estimating criteria.<br />
Regulatory issues concerning the LUC language delayed the<br />
draft DD and remedial action (RA) work plan for NAVACTS Site<br />
28.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Guam Apra Harbor Complex are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete DD and RA work plan for NAVACTS Site<br />
28 in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
e��—2r—�˜��D2q�—�<br />
M-93