Letterkenny Army Depot (AD) contains various contaminated<br />
sites resulting from its ammunition and vehicle maintenance<br />
missions. Sites include disposal lagoons and trenches, oil burn<br />
pits, an open burning and open detonation area, an explosives<br />
washout plant, two scrap yards, landfills, industrial wastewater<br />
treatment plant lagoons, and industrial wastewater sewer lines.<br />
EPA has placed two areas of Letterkenny on the NPL: the<br />
Southeastern (SE) Area in July 1987 and the Property Disposal<br />
Office (PDO) in March 1989. Both sites are in the southern part<br />
of the installation. The Army and EPA signed an interagency<br />
agreement (IAG) in February 1989. The installation has<br />
concentrated its remedial efforts on source removal methods,<br />
including excavation, low-temperature thermal treatment, and<br />
backfilling and capping of soil in the industrial wastewater<br />
treatment plant lagoons and the three K-Areas; emergency<br />
repairs to leaking industrial wastewater sewers; removal of the<br />
PDO fire training pit; and emergency removal of playground soil<br />
at the PDO area and of sediment contaminated with<br />
polychlorinated biphenyls (PCBs) in the Rocky Spring<br />
springhouse. In FY96, the Army established a BRAC cleanup<br />
team, the community formed a local redevelopment authority,<br />
and the installation established a Restoration Advisory Board<br />
(RAB). The Army completed a 5-year review for the SE area in<br />
FY02.<br />
To date, the Army has signed eight Records of Decision<br />
(RODs) and transferred approximately 761 acres. The cleanup<br />
progress at Letterkenny AD for FY02 through FY05 is detailed<br />
below.<br />
In FY02, the installation completed a Phase II limited depth<br />
transfer, and decontaminated Buildings 651 and 652. The Army<br />
completed the SE area 5-year review. The installation<br />
completed the soil removal action for PDO Operable Unit (OU)<br />
5 and the Defense Reutilization and Marketing Office scrap<br />
yard PCBs. The installation initiated the focused feasibility<br />
study (FFS), proposed plan, and ROD for SE OU 11 and SE<br />
OU volatile organic chemical (VOC)-contaminated groundwater.<br />
The Army completed an inventory of closed, transferred, and<br />
transferring ranges and sites with unexploded ordnance,<br />
discarded military munitions, or munitions constituents. No<br />
Military Munitions Response Program (MMRP) sites were<br />
identified at this installation.<br />
Army<br />
€eQPIQVPHSHQHH<br />
IVDTVQ2—���<br />
ƒ����D2�—���—��D2—��2�����������2—���������Y2��˜����2—��2<br />
�����2��—���2—��2�������2�������Y2��˜����D2�����D2—��2<br />
�—���—��2��������<br />
QRFPI2@ƒ�����—�����2e��—AY2��—��2��2x€v2��2t���2IWVUY2QUFSI2<br />
@€�������2h�����—�2y����AY2��—��2��2x€v2��2w—��2IWVW<br />
seq2������2��2p�˜��—��2IWVW<br />
†yg�D2€yv�D2€gf�D2��—��2���—��D2����������D2—�˜�����<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62IIUFR2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PQFW2�������@p‰2PHIRA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIIGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
In FY03, the installation signed a finding of suitability to lease.<br />
Groundwater sampling results of Phase III parcels<br />
demonstrated that the Phase III parcels were clean. The Phase<br />
III finding of suitability to transfer (FOST) was signed. The<br />
installation conducted a tour of the installation sites for the<br />
RAB. Letterkenny AD was announced as the 2002 winner of<br />
the Secretary of the Army's Environmental Award for<br />
Environmental Restoration.<br />
In FY04, the Army transferred the Phase III BRAC property.<br />
The installation initiated the removal of lead contaminated soil<br />
at Old PDO Scrapyard. The installation continued groundwater<br />
sampling for PDO OU 2.<br />
In FY05, the Army signed a ROD for SE OU 4. The installation<br />
submitted RODs for Phase IV and SE OU 10 for regulatory<br />
review.<br />
p‰HT2s‚€2€�������<br />
Letterkenny AD installed and sampled additional deep wells in<br />
SE OUs 3, 6, and 11 to address groundwater plume delineation<br />
issues. The Army and EPA signed a ROD and FOST for the<br />
Phase IV Parcels. The Army and EPA also signed RODs for the<br />
SE OU 10 groundwater and SE OU 2 Industrial Wastewater<br />
Sewers and Associated Contaminated Soils. Work began in the<br />
Ammo Area on the TNT Washout Plant and SE OU 12 Landfill<br />
5 (Area G). The installation continued to address landfill issues<br />
at SE OU 9 Landfill (LF) 2 (Area J).<br />
Technical issues delayed the FFS and remedial design (RD)<br />
phase for the on- and off-post contaminated groundwater (SE<br />
OUs 3, 6, and 11). Mission changes and force protection issues<br />
delayed the property transfer of the Phase IV parcels.<br />
p‰HT2ww‚€2€�������<br />
The Army has identified no MMRP sites at this installation.<br />
p�—�����2g�����D2€�������—��—<br />
€�—�2��2e����<br />
Plan of action items for Letterkenny Army Depot are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Complete the FFS and RD phase for the on- and<br />
off-post VOC-contaminated groundwater (SE OUs<br />
3A, 6, and 11) in FY07-FY08.<br />
0 Continue to cleanup the Ammo Area on the TNT<br />
Washout Plant and SE OU 12 LF 5 (Area G) in<br />
FY07-FY08.<br />
0 Continue to address landfill issues at SE OU<br />
9 LF 2 (Area J) in FY07-FY08.<br />
0 Complete the Phase IV parcels property<br />
transfer in FY07-FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
M-112