07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

v����������2e���2h���� x€vGf‚eg2IWWS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

€�������2„�2h—��<br />

Letterkenny Army Depot (AD) contains various contaminated<br />

sites resulting from its ammunition and vehicle maintenance<br />

missions. Sites include disposal lagoons and trenches, oil burn<br />

pits, an open burning and open detonation area, an explosives<br />

washout plant, two scrap yards, landfills, industrial wastewater<br />

treatment plant lagoons, and industrial wastewater sewer lines.<br />

EPA has placed two areas of Letterkenny on the NPL: the<br />

Southeastern (SE) Area in July 1987 and the Property Disposal<br />

Office (PDO) in March 1989. Both sites are in the southern part<br />

of the installation. The Army and EPA signed an interagency<br />

agreement (IAG) in February 1989. The installation has<br />

concentrated its remedial efforts on source removal methods,<br />

including excavation, low-temperature thermal treatment, and<br />

backfilling and capping of soil in the industrial wastewater<br />

treatment plant lagoons and the three K-Areas; emergency<br />

repairs to leaking industrial wastewater sewers; removal of the<br />

PDO fire training pit; and emergency removal of playground soil<br />

at the PDO area and of sediment contaminated with<br />

polychlorinated biphenyls (PCBs) in the Rocky Spring<br />

springhouse. In FY96, the Army established a BRAC cleanup<br />

team, the community formed a local redevelopment authority,<br />

and the installation established a Restoration Advisory Board<br />

(RAB). The Army completed a 5-year review for the SE area in<br />

FY02.<br />

To date, the Army has signed eight Records of Decision<br />

(RODs) and transferred approximately 761 acres. The cleanup<br />

progress at Letterkenny AD for FY02 through FY05 is detailed<br />

below.<br />

In FY02, the installation completed a Phase II limited depth<br />

transfer, and decontaminated Buildings 651 and 652. The Army<br />

completed the SE area 5-year review. The installation<br />

completed the soil removal action for PDO Operable Unit (OU)<br />

5 and the Defense Reutilization and Marketing Office scrap<br />

yard PCBs. The installation initiated the focused feasibility<br />

study (FFS), proposed plan, and ROD for SE OU 11 and SE<br />

OU volatile organic chemical (VOC)-contaminated groundwater.<br />

The Army completed an inventory of closed, transferred, and<br />

transferring ranges and sites with unexploded ordnance,<br />

discarded military munitions, or munitions constituents. No<br />

Military Munitions Response Program (MMRP) sites were<br />

identified at this installation.<br />

Army<br />

€eQPIQVPHSHQHH<br />

IVDTVQ2—���<br />

ƒ����D2�—���—��D2—��2�����������2—���������Y2��˜����2—��2<br />

�����2��—���2—��2�������2�������Y2��˜����D2�����D2—��2<br />

�—���—��2��������<br />

QRFPI2@ƒ�����—�����2e��—AY2��—��2��2x€v2��2t���2IWVUY2QUFSI2<br />

@€�������2h�����—�2y����AY2��—��2��2x€v2��2w—��2IWVW<br />

seq2������2��2p�˜��—��2IWVW<br />

†yg�D2€yv�D2€gf�D2��—��2���—��D2����������D2—�˜�����<br />

2w���—2e������X<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62IIUFR2�������<br />

2i��F2g„g2@g���2‰�—�AX 62PQFW2�������@p‰2PHIRA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIIGx���<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

In FY03, the installation signed a finding of suitability to lease.<br />

Groundwater sampling results of Phase III parcels<br />

demonstrated that the Phase III parcels were clean. The Phase<br />

III finding of suitability to transfer (FOST) was signed. The<br />

installation conducted a tour of the installation sites for the<br />

RAB. Letterkenny AD was announced as the 2002 winner of<br />

the Secretary of the Army's Environmental Award for<br />

Environmental Restoration.<br />

In FY04, the Army transferred the Phase III BRAC property.<br />

The installation initiated the removal of lead contaminated soil<br />

at Old PDO Scrapyard. The installation continued groundwater<br />

sampling for PDO OU 2.<br />

In FY05, the Army signed a ROD for SE OU 4. The installation<br />

submitted RODs for Phase IV and SE OU 10 for regulatory<br />

review.<br />

p‰HT2s‚€2€�������<br />

Letterkenny AD installed and sampled additional deep wells in<br />

SE OUs 3, 6, and 11 to address groundwater plume delineation<br />

issues. The Army and EPA signed a ROD and FOST for the<br />

Phase IV Parcels. The Army and EPA also signed RODs for the<br />

SE OU 10 groundwater and SE OU 2 Industrial Wastewater<br />

Sewers and Associated Contaminated Soils. Work began in the<br />

Ammo Area on the TNT Washout Plant and SE OU 12 Landfill<br />

5 (Area G). The installation continued to address landfill issues<br />

at SE OU 9 Landfill (LF) 2 (Area J).<br />

Technical issues delayed the FFS and remedial design (RD)<br />

phase for the on- and off-post contaminated groundwater (SE<br />

OUs 3, 6, and 11). Mission changes and force protection issues<br />

delayed the property transfer of the Phase IV parcels.<br />

p‰HT2ww‚€2€�������<br />

The Army has identified no MMRP sites at this installation.<br />

p�—�����2g�����D2€�������—��—<br />

€�—�2��2e����<br />

Plan of action items for Letterkenny Army Depot are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Complete the FFS and RD phase for the on- and<br />

off-post VOC-contaminated groundwater (SE OUs<br />

3A, 6, and 11) in FY07-FY08.<br />

0 Continue to cleanup the Ammo Area on the TNT<br />

Washout Plant and SE OU 12 LF 5 (Area G) in<br />

FY07-FY08.<br />

0 Continue to address landfill issues at SE OU<br />

9 LF 2 (Area J) in FY07-FY08.<br />

0 Complete the Phase IV parcels property<br />

transfer in FY07-FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

M-112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!