07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

uFsF2ƒ—����2e��2p���2f—�� f‚eg2IWWQ<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

In July 1993, the BRAC Commission recommended closure of<br />

K.I. Sawyer Air Force Base (AFB), deactivation of the 410th<br />

Wing, and transfer of the base's mission. In September 1995,<br />

the installation closed. Environmental studies have been in<br />

progress at the installation since FY84. Sites identified through<br />

environmental studies conducted at the installation include<br />

landfills, fire training (FT) areas, underground storage tanks<br />

(USTs), aboveground storage tank spill sites, drainage pits, and<br />

a drainage pond (DP). The primary contaminants affecting soil<br />

and groundwater are petroleum hydrocarbons, trichloroethylene<br />

(TCE), tetrachloroethylene (PCE), vinyl chloride, and heavy<br />

metals. Interim remedial actions (RAs) have included removal<br />

of USTs, removal and cleanup of contaminated soil, installation<br />

of groundwater extraction wells, construction and operation of a<br />

groundwater treatment plant, removal of fuel from groundwater<br />

at the former petroleum/oil/lubricant (POL) storage area (ST<br />

004), and installation of bioventing systems. In FY94, a<br />

Restoration Advisory Board (RAB) was formed and the<br />

installation received a technical assistance for public<br />

participation (TAPP) grant for work performed in FY99. TAPP<br />

funding was used for the technical review of documents for<br />

Sites Landfill (LF) 001, ST 004, and FT 006. The final RA plan<br />

(RAP) was completed for LF 001 and a draft RAP was<br />

completed for ST 004. In addition, RAs were completed at LF<br />

001. The installation completed its first 5-year review in FY06.<br />

Thirty <strong>Installation</strong> Restoration Program (IRP) sites have<br />

required additional investigation at this installation. To date, no<br />

further action closure documents have been completed for 21<br />

sites. The cleanup progress at K.I. Sawyer AFB for FY02<br />

through FY05 is detailed below.<br />

In FY02, operation of the treatment systems and groundwater<br />

monitoring continued. A basewide RAP was submitted to the<br />

State as planned. Remedial design (RD) was completed and<br />

RA construction (RA-C) began for the removal of contaminated<br />

soil and the installation of a soil venting system at Site OT 013.<br />

RD was also completed and RA-C was initiated for the<br />

alteration and upgrade of the fuel recovery trench at Site ST<br />

004.<br />

In FY03, the installation attained response complete at two<br />

sites, FR 026 (Firing and Machine Gun Range) and XE 027<br />

Air Force<br />

wsSSUHHPRUTHHH<br />

RDWSQ2—���<br />

g�������2����E�—���2˜��˜—������2—��2—��2���������2<br />

����—�����<br />

xGe<br />

x���<br />

€��������D2���������D2��—��2���—��D2��������<br />

q������—���2—��2����<br />

2p������2��2h—��X<br />

62SUFT2�������<br />

2i��F2g„g2@g���2‰�—�AX 62PHFW2�������@p‰2PHQTA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHTGp‰2PHHU<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

(Explosive Ordnance Disposal Range). The installation also<br />

transferred 93 acres to the County of Marquette. A remedial<br />

process optimization review was planned to identify<br />

opportunities for enhancing the effectiveness and efficiency of<br />

remediation efforts.<br />

In FY04, the installation completed the RA-C at Site OT 013<br />

and the modification of the Site ST 004 interceptor trench. The<br />

Air Force conducted an inventory of Military Munitions<br />

Response Program (MMRP) sites. MMRP sites were identified<br />

at this installation.<br />

In FY05, the installation completed closure sampling for the soil<br />

vapor extraction system at Site FT 006 in anticipation of system<br />

shutdown and decommissioning. The closeout sampling<br />

protocol was also initiated at Site DP 002. The installation<br />

developed a shutdown plan at Site OT 013. Groundwater<br />

monitoring continued at various sites. Transfer of the remaining<br />

property at K.I. Sawyer was completed; only the property at the<br />

Defense Fuels Supply Point (DFSP) at Escanaba (Site OT 013,<br />

40 acres) remains to be transferred. The Air Force began<br />

evaluating requirements at MMRP sites at this installation. The<br />

installation also initiated the first 5-year review. The RAB held<br />

an annual meeting.<br />

p‰HT2s‚€2€�������<br />

The installation completed optimization of basewide<br />

groundwater monitoring, thus reducing the frequency and<br />

number of wells sampled. The Air Force continued to verify that<br />

the rebound of contaminants will not occur with the treatment<br />

system shutdown at DP 002 through limited groundwater<br />

sampling. K.I. Sawyer AFB continued working toward<br />

completion of RAs at the DFSP (OT 013) and combined<br />

Escanaba Areas 1 and 2 for purposes of property transfer. The<br />

installation completed its first 5-year review. The Air Force<br />

continued monitoring and routinely inspecting sites, and<br />

completed optimization of basewide groundwater monitoring.<br />

The cost of completing environmental restoration has changed<br />

significantly due to technical issues and changes in estimating<br />

criteria.<br />

The RAB held an annual meeting.<br />

p‰HT2ww‚€2€�������<br />

The installation evaluated requirements at MMRP sites.<br />

q����D2w����—�<br />

€�—�2��2e����<br />

Plan of action items for K.I. Sawyer Air Force Base are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Deed Escanaba DFSP in FY07.<br />

0 Optimize routine inspections in FY08.<br />

0 Refresh the basewide groundwater optimization<br />

in FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

M-105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!