Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
p���2q����� f‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
Fort Gillem, a sub-installation of Fort McPherson, was<br />
recommended for closure by the 2005 BRAC Commission. The<br />
installation comprises approximately 1,426 acres and is<br />
surrounded by residential and commercial properties. Fort<br />
Gillem supports Army Forces Command (FORSCOM)<br />
readiness missions and is home for many FORSCOM and Fort<br />
McPherson activities. The Eastern Distribution Region of the<br />
Army and Air Force Exchange Service uses approximately 60<br />
acres for storage. Fort Gillem also supports the Federal<br />
Emergency Management Agency disaster relief activities by<br />
providing warehouse and office space. In 2001, 27,000 tons of<br />
lead contaminated soil and 4,000 tons of VOC contaminated<br />
soil were excavated at the Northern Landfill Area (FTG 01).<br />
The cleanup progress at Fort Gillem for FY02 through FY05 is<br />
detailed below.<br />
In FY02, the installation identified the groundwater plume<br />
source with direct push sampling at FTG 01 North Landfill Area<br />
site and additional samples to delineate the plume were taken<br />
at FTG 04. The Army conducted a remedial investigation (RI)<br />
at FTGs 07 and 09. The Army collected additional samples at<br />
FTG 13 to support the baseline risk assessment (BLRA) that it<br />
subsequently completed.<br />
In FY03, the installation further defined the source areas at<br />
FTG 01 and conducted an additional RI for FTG 07.<br />
In FY04, the installation conducted a focused investigation on<br />
the MW 48A area at FTG 01. The Army completed a focused<br />
feasibility study (FFS) for the FTG 07 site and a FS for the FTG<br />
09 site.<br />
In FY05, the Army awarded a performance-based contract<br />
(PBC) for FTGs 01, 04, 07, 09, 10, and 13. The remaining<br />
restoration sites: FTGs 02, 03, 05, 06, 08, and 14 have been<br />
recommended for no further action based on the site<br />
investigation, pending concurrence/approval from the Georgia<br />
Environmental Protection Division.<br />
Army<br />
qeRPIRHPHHRTHH<br />
IDRPT2—���<br />
ƒ��������2py‚ƒgyw2��—������2��������<br />
xGe<br />
x���<br />
€er�D2���—��D2†yg�D2���������D2€yv�D2������—���2��������<br />
q������—���D2����—�2�—���D2��������D2����<br />
62QPFI2�������<br />
2i��F2g„g2@g���2‰�—�AX 62WFI2�������@p‰2PHPUA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHVGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
p‰HT2s‚€2€�������<br />
The Army initiated preparation of an Environmental Condition of<br />
Property (ECP) report and a CERFA report in response to the<br />
BRAC 2005 recommendations for closure of the installation.<br />
Fort Gillem completed a FFS for the cleanup strategy at FTG<br />
01 (Operable Units A, B, H and I). The Army developed RI work<br />
plan to address data gaps at FTG 01. Fort Gillem prepared<br />
remedial design documents for interim remedial measures to<br />
address source removals at FTGs 01 and 09. The Army<br />
prepared RI reports for FTGs 04, 07, 09, and 10. Additionally,<br />
the installation evaluated the groundwater monitoring network<br />
and the off-site well survey.<br />
p‰HT2ww‚€2€�������<br />
Fort Gillem had no MMRP sites previously identified, but<br />
several operational ranges are present. The Army completed a<br />
historical records review for the operational ranges at Fort<br />
Gillem.<br />
€�—�2��2e����<br />
Plan of action items for Fort Gillem are grouped below<br />
according to program category.<br />
22222s‚€<br />
0 Prepare an RI/BLRA report and a focused FS at<br />
FTG 13 in FY07.<br />
0 Prepare an RI/BLRA report and a focused FS at<br />
FTG 04 in FY07.<br />
0 Complete the ECP and CERFA reports in FY07.<br />
0 Achieve remedy-in-place in FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
p�����2€—��D2q�����—<br />
M-73