Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
€���������2x—�—�2ƒ����—�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
The Portsmouth Naval Shipyard (NSY) maintains, repairs, and<br />
overhauls nuclear submarines. A preliminary assessment (PA)<br />
and site inspection identified four potentially contaminated sites.<br />
A RCRA facility assessment in FY86 identified 28 solid waste<br />
management units (SWMUs). Site types at the installation<br />
include a landfill, a salvage and storage area, and waste oil<br />
tanks. In FY92, the installation completed a RCRA facility<br />
investigation. The installation formed a technical review<br />
committee in FY87, which was converted to a Restoration<br />
Advisory Board in FY95. Portsmouth NSY developed a<br />
community relations plan, which was updated in FY97. The<br />
installation was placed on the NPL in May 1994, because of<br />
groundwater contamination at sites on the island, and because<br />
past activities may have adversely impacted sensitive wetland<br />
communities around and downstream of the facility. In 2005,<br />
the BRAC Commission recommended Portsmouth NSY for<br />
realignment. The installation signed a federal facility agreement<br />
(FFA) in 1999.<br />
Portsmouth NSY has identified 35 sites. The installation<br />
completed and signed a no further action document for SWMUs<br />
12, 13, 16, and 23. The installation completed one Record of<br />
Decision. The cleanup progress at Portsmouth NSY for FY02<br />
through FY05 is detailed below.<br />
In FY02, the installation completed interim remediation goals for<br />
Operable Unit (OU) 4, and the work plan and fieldwork for the<br />
Site 10 additional investigation. Portsmouth NSY also initiated<br />
the work plan for Site 31 (Topeka Pier) and began remedial<br />
action (RA) for OU 3. The RA for OU 3 started earlier to<br />
consolidate a portion of the landfill. The Navy completed an<br />
inventory of all Military Munitions Response Program (MMRP)<br />
sites. One MMRP site was identified at this installation.<br />
In FY03, the installation completed the Site 10 additional<br />
investigation report and construction of the OU 3 wetlands. In<br />
addition, the installation completed the remedial design for OU<br />
3. Portsmouth NSY also completed the remedial investigation<br />
(RI) work plan for Site 32. A site visit for the PA was performed.<br />
In FY04, Portsmouth NSY completed the Phase I RI data<br />
package for Site 32 as well as the engineering evaluation and<br />
cost analysis for Site 30. The installation also started the Site<br />
Navy<br />
wiIIUHHPPHIWHH<br />
PUV2—���<br />
w—���—��D2���—��D2—��2�����—��2����—�2��˜�—�����<br />
TUFUHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2������2��2IWWW<br />
€gf�D2���������D2†yg�D2��—��2���—��<br />
q������—���D2����—�2�—���D2��������D2����<br />
62SHFW2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PVFV2�������@p‰2PHQTA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIQGp‰2PHHS<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
10 work plan and continued the RA for OU 3. The Navy<br />
identified and excavated 1,000 cubic yards of waste in<br />
sediment offshore of OU 3. The installation also continued<br />
interim offshore monitoring for OU 4, and started Rounds 1<br />
through 7 of the trending report for interim offshore monitoring.<br />
In FY05, Portsmouth NSY completed the RA for OU 3. The<br />
installation initiated OU 2 feasibility study and continued interim<br />
offshore monitoring for OU 4. Portsmouth NSY finalized the PA<br />
for MMRP.<br />
p‰HT2s‚€2€�������<br />
Portsmouth NSY completed Site 10 fieldwork. The installation<br />
initiated an additional scrutiny report and continued the interim<br />
offshore monitoring for OU 4. The Navy initiated the operation,<br />
maintenance, and monitoring program of the Jamaica Island<br />
Landfill.<br />
p‰HT2ww‚€2€�������<br />
The Navy conducted no MMRP actions at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Portsmouth Naval Shipyard are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete 5-year review in FY07.<br />
0 Conduct removal action at Site 34 in<br />
FY07-FY08.<br />
0 Continue interim off-shore monitoring for OU<br />
4 in FY07-FY08.<br />
0 Complete RI report for OU 1 in FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
u������D2w—���<br />
M-167