Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
q—���—2p���—��2y���—����2v�—���� f‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Galena Forward Operating Location (FOL) is located on the<br />
Yukon River about 270 miles west of Fairbanks, Alaska. The<br />
airport was constructed in 1940 and the Air Force has had joint<br />
civilian-military use of the airfield since 1951, until the base was<br />
drawn down in 1993. In 2005, the BRAC Commission<br />
recommended closure of the Galena FOL. Galena FOL<br />
occupies 166 acres and is comprised of a number of buildings<br />
and other structures. The majority of facilities at Galena Airport<br />
are Air Force-owned structures, although other non-Air Force<br />
properties exist. Military operations over the years have<br />
released hazardous chemicals via spills or historical disposal<br />
practices, resulting in numerous identified <strong>Installation</strong><br />
Restoration Program (IRP) sites. The Air Force and the Alaska<br />
Department of Environmental Conservation work with local<br />
stakeholders, including the Louden Tribal Council, City of<br />
Galena, and Galena City Schools, through the Galena<br />
Technical Project Team, to address environmental concerns. In<br />
addition, Galena community members communicate with the<br />
installation through the Restoration Advisory Board (RAB),<br />
which was formed in 2004.<br />
The cleanup progress at Galena FOL for FY02 through FY05 is<br />
detailed below.<br />
In FY02, the installation completed a proposed plan and<br />
decision document, and awarded a contract for drum removal<br />
at SS 007. The Air Force installed a subsurface<br />
depressurization system at Site CB 001 to minimize vapor<br />
movement; subsequent air sampling and system monitoring<br />
found the system to be effective. The installation continued their<br />
relationship with the local stakeholders, including the Louden<br />
Tribal Council, and held RAB meetings.<br />
In FY03, the installation tested bioventing treatment systems at<br />
Million Gallon Hill and the petroleum/oil/lubricant (POL) Tank<br />
Farm. The Air Force Center for Environmental Excellence<br />
conducted a remedial scoping visit for the entire installation.<br />
The Air Force continued working with local stakeholders.<br />
In FY04, the installation initiated a comprehensive remedial<br />
investigation and feasibility study (RI/FS) for all treatment<br />
systems. The Air Force continued testing the bioventing<br />
Air Force<br />
euHSUQHPVTSSHH<br />
ITT2—���<br />
ƒ�����2—�2—�2—����2���������2����2���2—���—��2˜����2���2���2<br />
ƒ�����2…����2�����2���2v���Ev�—��2�����—�D2—��2�—���2—�2—2<br />
����—��2����—����2˜—��2���2���2e��2p���<br />
xGe<br />
x���<br />
f������D2„giD2€yv�<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62PIFT2�������<br />
2i��F2g„g2@g���2‰�—�AX 62IFP2�������@p‰2PHITA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHVGp‰2PHIQ<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
treatment systems at Million Gallon Hill and the POL Tank<br />
Farm. The installation initiated preliminary assessments (PAs).<br />
In FY05, the installation conducted monthly sampling of the<br />
base drinking water. The Air Force continued the<br />
comprehensive RI/FS. The Air Force began the PAs for all<br />
identified Military Munitions Response Program (MMRP) sites.<br />
p‰HT2s‚€2€�������<br />
Galena FOL continued the RI/FS to assess the total extent of<br />
contamination. As part of the RI/FS, the installation initiated a<br />
baseline risk assessment to address the risks at each IRP site,<br />
including potential risks to subsistence resources.<br />
Galena FOL briefed the RAB on current activities at the<br />
installation.<br />
p‰HT2ww‚€2€�������<br />
The Air Force continued the PAs at all identified sites. Cost<br />
estimates were updated and the initial Munitions Response Site<br />
Prioritization Protocol rating for each MMRP site was<br />
developed.<br />
€�—�2��2e����<br />
Plan of action items for Galena Forward Operating Location are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Prepare Records of Decision and execute<br />
requirements in FY07-FY08.<br />
0 Implement remedial process optimization<br />
recommendations in FY07-FY08.<br />
0 Close installation in FY08.<br />
22222ww‚€<br />
0 Complete PAs in FY07.<br />
0 Complete site inspections in FY07-FY10.<br />
q—���—D2e�—��—<br />
M-88