07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

p���2h�� x€vGf‚eg2PHHS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

2p������2��2h—��X<br />

€�������2„�2h—��<br />

Remedial investigation (RI) of the Fort Dix Sanitary Landfill<br />

began in 1979, leading to the installation of groundwater<br />

monitoring wells around the perimeter. Due to the identified<br />

contamination, EPA placed the landfill on the NPL in 1987. In<br />

FY89, the installation identified contamination at storage areas,<br />

motor pools, abandoned underground storage tanks (USTs),<br />

landfills, lagoons, impact areas, and an incinerator.<br />

Contaminants identified include heavy metals, volatile organic<br />

compounds (VOCs), petroleum/oil/lubricants (POLs), and<br />

chlorinated solvents. The Army and EPA signed a federal<br />

facility agreement (FFA) in September 1991. In FY95, the<br />

BRAC Commission recommended realignment of Fort Dix, with<br />

retention of land and facilities for Reserve component training.<br />

In 2005, the BRAC Commission recommended Fort Dix for<br />

realignment. The installation formed a Restoration Advisory<br />

Board in FY96. In FY00, the Army petitioned EPA to remove<br />

the Sanitary Landfill from the NPL. The installation completed<br />

5-year reviews for the landfill in FY99 and FY05.<br />

The installation has completed nine Records of Decision<br />

(RODs) to date. In FY89, the installation performed site<br />

characterization and field screening at 16 sites and, in 1993,<br />

identified 42 areas requiring environmental evaluation. In FY97,<br />

the installation removed 80 abandoned USTs and began<br />

evaluating the contaminated sites. In FY99, the Sanitary Landfill<br />

was added to EPA's construction complete list. The cleanup<br />

progress at Fort Dix for FY02 through FY05 is detailed below.<br />

In FY02, the Army initiated a remedial design and a remedial<br />

action (RA) at the Taxi Stand site and an RI/feasibility study at<br />

the Pesticide Control Shop. The UST RI report for Buildings<br />

5390, 7061, and the golf course site were all completed. The<br />

installation completed RODs for the Environmental<br />

Photographic Interpretation Center 8 Landfill, Property Disposal<br />

Office Landfill, hazardous waste storage area, paint shop,<br />

polychlorinated biphenyls (PCBs) transformer storage area,<br />

Bivouac 5 wash rack, Magazine (MAG) 1 Area, and the golf<br />

course pesticide mixing area. Fort Dix continued to pursue<br />

deletion of the Sanitary Landfill from the NPL.<br />

In FY03, the Army included MAG 1 Site, the Armament<br />

Research and Development Center Site, leaking USTs 5390,<br />

7061, and golf course leaking USTs in a contract for<br />

Army<br />

xtPPIHRPHPUSHH<br />

QHDWWU2—���<br />

€������2��—�����2—��2‚������2�������<br />

QUFRHY2��—��2��2x€v2��2t���2IWVU<br />

ppe2������2��2ƒ�����˜��2IWWI<br />

r�—��2���—��D2†yg�D2€yv�D2������—���2��������D2€gf�<br />

q������—���D2����—�2�—���D2��������D2����<br />

62ISFP2�������<br />

2i��F2g„g2@g���2‰�—�AX 62PHFR2�������@p‰2PHIUA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHIU<br />

2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />

remediation of 14 sites at Fort Dix. Fort Dix continued to pursue<br />

deletion of the Sanitary Landfill from the NPL. The installation<br />

continued long-term monitoring at the Sanitary Landfill. The<br />

Army completed the inventory of closed, transferred, and<br />

transferring (CTT) ranges and sites with unexploded ordnance,<br />

discarded military munitions, or munitions constituents for the<br />

active portion of the installation. Six Military Munitions<br />

Response Program (MMRP) sites were identified at this<br />

installation.<br />

In FY04, the installation awarded a guaranteed fixed price<br />

remediation contract to conduct remediation at 14 sites. The<br />

installation submitted RA work plans and RI reports to the<br />

regulators and completed soil removals at two sites. The<br />

installation continued long-term monitoring at the Sanitary<br />

Landfill. The installation completed, and regulators approved,<br />

the draft final RI report for the New Egypt Armory site, and an<br />

interim removal action of PCB-contaminated soils was initiated.<br />

The installation submitted the draft RI report for the former<br />

Pesticide Control Shop to the regulators for comment. Fort Dix<br />

initiated a 5-year review for the Sanitary Landfill and continued<br />

to pursue its deletion from the NPL.<br />

In FY05, the installation completed a 5-year review of the Fort<br />

Dix Sanitary Landfill, as well as soil remediation at the New<br />

Egypt Armory site. The installation continued remediation at 14<br />

Fort Dix sites.<br />

p‰HT2s‚€2€�������<br />

Fort Dix continued remediation at the 14 Fort Dix sites under<br />

the guaranteed fixed price remediation contract. The installation<br />

completed in-situ treatment of the Taxi Stand Plume. The Army<br />

continued the sitewide classification exception area<br />

groundwater sampling. The installation began sentinel well<br />

installation at the Sanitary Landfill and pursued NPL delisting.<br />

Regulatory issues delayed the RI reports for the Range Landfill,<br />

ANC 2 Disposal Area, and the amended RI report for the Taxi<br />

Stand Plume.<br />

p‰HT2ww‚€2€�������<br />

The Army conducted no MMRP actions at this installation.<br />

€��˜�����2„�������D2x��2t�����<br />

€�—�2��2e����<br />

Plan of action items for Fort Dix are grouped below according to<br />

program category.<br />

22222s‚€<br />

0 Complete RI reports and complete FS for<br />

Pesticide Control Shop in FY07.<br />

0 Complete RI reports for Range Landfill and<br />

ANC 2 Disposal Area, and initiate focused FS<br />

in FY07.<br />

0 Discuss the elevated levels of manganese at<br />

the Sanitary Landfill with regulators in<br />

FY07.<br />

0 Initiate work plans for the Range Landfill<br />

and ANC 2 Disposal Area in FY07.<br />

0 Sample the Taxi Stand Plume and amend the RI<br />

report in FY07.<br />

22222ww‚€<br />

0 Complete historical records review for CTT<br />

ranges in FY07.<br />

M-69