Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
p���2h�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
2p������2��2h—��X<br />
€�������2„�2h—��<br />
Remedial investigation (RI) of the Fort Dix Sanitary Landfill<br />
began in 1979, leading to the installation of groundwater<br />
monitoring wells around the perimeter. Due to the identified<br />
contamination, EPA placed the landfill on the NPL in 1987. In<br />
FY89, the installation identified contamination at storage areas,<br />
motor pools, abandoned underground storage tanks (USTs),<br />
landfills, lagoons, impact areas, and an incinerator.<br />
Contaminants identified include heavy metals, volatile organic<br />
compounds (VOCs), petroleum/oil/lubricants (POLs), and<br />
chlorinated solvents. The Army and EPA signed a federal<br />
facility agreement (FFA) in September 1991. In FY95, the<br />
BRAC Commission recommended realignment of Fort Dix, with<br />
retention of land and facilities for Reserve component training.<br />
In 2005, the BRAC Commission recommended Fort Dix for<br />
realignment. The installation formed a Restoration Advisory<br />
Board in FY96. In FY00, the Army petitioned EPA to remove<br />
the Sanitary Landfill from the NPL. The installation completed<br />
5-year reviews for the landfill in FY99 and FY05.<br />
The installation has completed nine Records of Decision<br />
(RODs) to date. In FY89, the installation performed site<br />
characterization and field screening at 16 sites and, in 1993,<br />
identified 42 areas requiring environmental evaluation. In FY97,<br />
the installation removed 80 abandoned USTs and began<br />
evaluating the contaminated sites. In FY99, the Sanitary Landfill<br />
was added to EPA's construction complete list. The cleanup<br />
progress at Fort Dix for FY02 through FY05 is detailed below.<br />
In FY02, the Army initiated a remedial design and a remedial<br />
action (RA) at the Taxi Stand site and an RI/feasibility study at<br />
the Pesticide Control Shop. The UST RI report for Buildings<br />
5390, 7061, and the golf course site were all completed. The<br />
installation completed RODs for the Environmental<br />
Photographic Interpretation Center 8 Landfill, Property Disposal<br />
Office Landfill, hazardous waste storage area, paint shop,<br />
polychlorinated biphenyls (PCBs) transformer storage area,<br />
Bivouac 5 wash rack, Magazine (MAG) 1 Area, and the golf<br />
course pesticide mixing area. Fort Dix continued to pursue<br />
deletion of the Sanitary Landfill from the NPL.<br />
In FY03, the Army included MAG 1 Site, the Armament<br />
Research and Development Center Site, leaking USTs 5390,<br />
7061, and golf course leaking USTs in a contract for<br />
Army<br />
xtPPIHRPHPUSHH<br />
QHDWWU2—���<br />
€������2��—�����2—��2‚������2�������<br />
QUFRHY2��—��2��2x€v2��2t���2IWVU<br />
ppe2������2��2ƒ�����˜��2IWWI<br />
r�—��2���—��D2†yg�D2€yv�D2������—���2��������D2€gf�<br />
q������—���D2����—�2�—���D2��������D2����<br />
62ISFP2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PHFR2�������@p‰2PHIUA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHIU<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
remediation of 14 sites at Fort Dix. Fort Dix continued to pursue<br />
deletion of the Sanitary Landfill from the NPL. The installation<br />
continued long-term monitoring at the Sanitary Landfill. The<br />
Army completed the inventory of closed, transferred, and<br />
transferring (CTT) ranges and sites with unexploded ordnance,<br />
discarded military munitions, or munitions constituents for the<br />
active portion of the installation. Six Military Munitions<br />
Response Program (MMRP) sites were identified at this<br />
installation.<br />
In FY04, the installation awarded a guaranteed fixed price<br />
remediation contract to conduct remediation at 14 sites. The<br />
installation submitted RA work plans and RI reports to the<br />
regulators and completed soil removals at two sites. The<br />
installation continued long-term monitoring at the Sanitary<br />
Landfill. The installation completed, and regulators approved,<br />
the draft final RI report for the New Egypt Armory site, and an<br />
interim removal action of PCB-contaminated soils was initiated.<br />
The installation submitted the draft RI report for the former<br />
Pesticide Control Shop to the regulators for comment. Fort Dix<br />
initiated a 5-year review for the Sanitary Landfill and continued<br />
to pursue its deletion from the NPL.<br />
In FY05, the installation completed a 5-year review of the Fort<br />
Dix Sanitary Landfill, as well as soil remediation at the New<br />
Egypt Armory site. The installation continued remediation at 14<br />
Fort Dix sites.<br />
p‰HT2s‚€2€�������<br />
Fort Dix continued remediation at the 14 Fort Dix sites under<br />
the guaranteed fixed price remediation contract. The installation<br />
completed in-situ treatment of the Taxi Stand Plume. The Army<br />
continued the sitewide classification exception area<br />
groundwater sampling. The installation began sentinel well<br />
installation at the Sanitary Landfill and pursued NPL delisting.<br />
Regulatory issues delayed the RI reports for the Range Landfill,<br />
ANC 2 Disposal Area, and the amended RI report for the Taxi<br />
Stand Plume.<br />
p‰HT2ww‚€2€�������<br />
The Army conducted no MMRP actions at this installation.<br />
€��˜�����2„�������D2x��2t�����<br />
€�—�2��2e����<br />
Plan of action items for Fort Dix are grouped below according to<br />
program category.<br />
22222s‚€<br />
0 Complete RI reports and complete FS for<br />
Pesticide Control Shop in FY07.<br />
0 Complete RI reports for Range Landfill and<br />
ANC 2 Disposal Area, and initiate focused FS<br />
in FY07.<br />
0 Discuss the elevated levels of manganese at<br />
the Sanitary Landfill with regulators in<br />
FY07.<br />
0 Initiate work plans for the Range Landfill<br />
and ANC 2 Disposal Area in FY07.<br />
0 Sample the Taxi Stand Plume and amend the RI<br />
report in FY07.<br />
22222ww‚€<br />
0 Complete historical records review for CTT<br />
ranges in FY07.<br />
M-69