Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
v—�����2e��2p���2f—��<br />
s�������2xeƒe2v—�����2‚���—��2g�����<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
€�������2„�2h—��<br />
Langley Air Force Base (AFB) has been an airfield and an<br />
aeronautical research center since 1917 and is the home base<br />
of the 1st Fighter Wing and Headquarters Air Combat<br />
Command. The base was placed on the NPL in May 1994. In<br />
2005, the BRAC Commission recommended Langley AFB for<br />
realignment. Sites at this installation include landfills,<br />
underground storage tanks, a bulk fuel distribution system, and<br />
storm sewers. Investigations have determined that<br />
contaminants are migrating into Tabbs Creek, the Back River,<br />
and ultimately the Chesapeake Bay. The installation formed a<br />
Restoration Advisory Board in FY94. Five-year reviews were<br />
completed in FY01 and FY04 for Spill Site (SS) 61.<br />
To date, the Air Force has identified 57 sites at the installation.<br />
Six bilaterally signed Records of Decision (RODs) and two<br />
unilaterally signed RODs have been signed. The cleanup<br />
progress at Langley AFB for FY02 through FY05 is detailed<br />
below.<br />
In FY02, the installation completed remedial designs (RDs) for<br />
seven sites. The installation also completed a remedial<br />
investigation (RI) for SS 63 and a proposed plan (PP) for Site<br />
OT 55. All fiscal year requirements were met to prepare for the<br />
5-year review at SS 61. The Sites WP 02 and 14 site feasibility<br />
studies (FSs) were completed. Dispute resolution was invoked<br />
concerning the institutional control language used for Langley<br />
Environmental Restoration Program sites.<br />
In FY03, the installation completed a site inspection (SI) for<br />
Areas of Concern (AOCs) 66, 67, and 68, and an FS for Landfill<br />
(LF) 17, Site OT 55, and SS 63. Remedial actions (RAs) for LFs<br />
05, 07, 12, and 18, as well as RDs for Sites WP 02 and 14,<br />
were also completed. In addition, the Air Force closed Site OT<br />
55 and met all fiscal year requirements to prepare for the 5-year<br />
review at SS 61. The installation initiated a no further RA<br />
planned determination for Site OT 55 as recommended by the<br />
RI/FS.<br />
In FY04, Langley AFB completed a 5-year review at SS 61. In<br />
order to put all sites on the same schedule, LFs 05, 07, 10, 12<br />
and 18, and Site FT 41 were added to the 5-year review.<br />
Long-term monitoring for LFs 05, 07, 12 and 18, and Site FT 41<br />
was completed. The installation also completed SIs for three<br />
Air Force<br />
†eQSUPIPRRUUHH<br />
QDISP2—���<br />
ƒ����2—�2����2��2�—��2���—���—�����D2��������2e��2g��˜—�2<br />
g���—��2r�—���—�����D2I��2p������2‡���D2UR��2„—��—�2<br />
g������2p—�����D2RVH��2‚����—���—��2„����—�2q����D2—��2<br />
xeƒe2v—�����2‚���—��2g�����<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2�����2������—����<br />
€��������2�������D2�����—��D2€gf�D2��������D2��—��2���—��<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62UPFT2�������<br />
2i��F2g„g2@g���2‰�—�AX 62UFT2�������@p‰2PHIWA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHWGp‰2PHIU<br />
2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />
AOCs, an FS for three sites, and RA-construction (RA-C) for<br />
one site.<br />
In FY05, Langley AFB awarded a 5-year basewide guaranteed<br />
fixed price performance-based contract (PBC). The contract<br />
includes FSs to site closure for Sites WP08, LF 17, OT 25, SS<br />
63, and LF 70, as well as long-term monitoring at Sites LF 05,<br />
LF 07, LF 12, LF 18, FT 41, SS 61, and OT 64. The installation<br />
also developed an NPL delisting strategy as part of the PBC.<br />
Langley AFB began RA at LFs 10 (western lobe) and 11, and<br />
changed the remedy at LF 01 due to proximity to the airfield<br />
and numerous buried utilities. The Defense and State<br />
Memorandum of Agreement cooperative agreement with the<br />
Commonwealth of Virginia was updated and identified levels of<br />
effort by the State through June 2012 in support of the<br />
<strong>Installation</strong> Restoration Program (IRP). The Air Force began the<br />
preliminary assessments (PAs) for all identified Military<br />
Munitions Response Program (MMRP) sites.<br />
p‰HT2s‚€2€�������<br />
Langley AFB completed interim RAs for SS 61 and Site OT<br />
06A. The installation amended FSs for LF 17 and Site OT 25,<br />
and completed one FS for SS 63. The Air Force issued a<br />
revised PP and ROD amendment for LF 01 and completed<br />
RA-C at LFs 01, 11, and 22. Langley AFB continued long-term<br />
monitoring at Sites LF 05, LF 07, LF 12, LF 18, FT 41, and SS<br />
61. The installation completed the RA at LF 11, completed FSs<br />
at LF 17 and Site OT 25; and drafted RODs and PPs for LF 17,<br />
Site OT 25, and SS 63/Black River Sediments.<br />
Regulatory issues delayed completion of the FS, PP, and ROD<br />
at Site OT 64, as well as the completion of PPs, RODs, RA<br />
work plans, RDs, and RAs at Sites LF 17, OT 25, and SS<br />
63/Black River Sediments.<br />
p‰HT2ww‚€2€�������<br />
The installation continued PAs at all identified MMRP sites.<br />
x€vGf‚eg2PHHS<br />
€�—�2��2e����<br />
Plan of action items for Langley Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Complete PPs, RODs, RDs, and RA-C for LF 17,<br />
Site OT 25, and the LTA Cove portion of SS 63<br />
in FY07.<br />
0 Complete the RA-C for LF 10 in FY07.<br />
0 Complete no further action decision documents<br />
for AOCs 66, 67, 68, and 69 in FY07.<br />
0 Complete the SI for AOC 70 in FY07.<br />
0 Revise unilateral RODs for Sites LF 05, LF<br />
11, LF 15, and OT 56 to gain bilateral<br />
signature in FY07.<br />
0 Complete FS, PP, and ROD for Site OT 64 in<br />
FY07.<br />
22222ww‚€<br />
0 Initiate SIs at all identified sites in FY07.<br />
r—�����D2†������—<br />