07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

‡����—��˜���2psƒgD2g��—��—�2e���� x€v<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

Williamsburg Fleet Industrial Supply Center (FISC) was placed<br />

on the NPL in December 2000 because eight of its <strong>Installation</strong><br />

Restoration Program (IRP) sites are hydrologically connected to<br />

the Chesapeake Bay. Contaminants at the installation include<br />

semivolatile organic compounds (SVOCs), polyaromatic<br />

hydrocarbons (PAHs), metals, and polychlorinated biphenyls<br />

(PCBs). These primarily affect groundwater, surface water, and<br />

sediment. The Navy signed a federal facility agreement (FFA)<br />

in March 2005. The Naval Weapons Station Yorktown<br />

Restoration Advisory Board meets quarterly and addresses IRP<br />

issues for Williamsburg FISC.<br />

The installation has identified 18 sites. To date, Sites 1, 4, 7, 9,<br />

10, and 11, and Areas of Concern (AOCs) 1 and 2 have been<br />

investigated. A potential AOC was discovered in FY03, north of<br />

Cheatham Annex (CAX) Depot Building 14. The cleanup<br />

progress at Williamsburg FISC for FY02 through FY05 is<br />

detailed below.<br />

In FY02, the installation completed a supplemental investigation<br />

at Site 1. Based on this investigation, the partnering team<br />

decided that the interim removal action for Site 1 was no longer<br />

required and would be incorporated in the remedial action. The<br />

final Record of Decision for Site 1 progressed. A field<br />

investigation of Site 11 and a limited field investigation of Site<br />

12 were conducted. The installation initiated a draft No Further<br />

Response Action Plan (NFRAP) Decision Document (DD) for<br />

Sites 2, 3, 5, 8, 9, 10, and 12. Drafts for the site screening-level<br />

ecological risk assessment (SERA) were completed. The Navy<br />

completed an inventory of all Military Munitions Response<br />

Program (MMRP) sites. One MMRP site was identified at this<br />

installation.<br />

In FY03, the installation completed an NFRAP DD for Sites 2,<br />

3, 5, 6, 8, and 10. The CAX background study was completed.<br />

The installation also began an engineering evaluation and cost<br />

analysis and the soil removal action for Site 1. The installation<br />

initiated a preliminary assessment (PA) for Unexploded<br />

Ordnance 00001 (Marine Pistol and Rifle Range).<br />

In FY04, the installation initiated a Round 2 remedial<br />

investigation (RI) for sediments at Site 1, and issued a draft RI<br />

with SERA Steps 1 and 2 for Site 11. The installation finalized<br />

Navy<br />

†eQIUHHPRTHSHH<br />

IDSUV2—���<br />

ƒ�����2e��—���2p����2�����2—��2�������2����—����—�2<br />

�������������2��2�����—��2—��2�����—�2���������<br />

RVFUPY2��—��2��2x€v2��2h���˜��2PHHH<br />

ppe2������2��2w—��2PHHS<br />

ƒ†yg�D2€er�D2���—��D2€gf�<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62WFR2�������<br />

2i��F2g„g2@g���2‰�—�AX 62IWFW2�������@p‰2PHIRA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIRGp‰2PHIH<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

an environmental geographic information system for CAX and<br />

completed an NFRAP DD for Site 12. Williamsburg FISC<br />

initiated an initial FFA for CAX and a time-critical removal action<br />

(TCRA) for shoreline protection at Site 7. The Agency for Toxic<br />

Substances and Disease Registry completed the Cheatham<br />

Annex Public Health Assessment. The installation initiated the<br />

Site 1 soil removal action, which included debris uncovered<br />

during Hurricane Isabel.<br />

In FY05, the Navy signed an FFA for CAX. The installation<br />

initiated remediation and restoration for the area of debris<br />

discovered in the treeline, south of the original soil removal<br />

action at Site 1. Williamsburg FISC completed sediment work<br />

plans for a Round 2 RI at Site 1 and initiated sampling. The<br />

installation completed the RI with SERA Steps 1 and 2 for Sites<br />

4 and 9. The installation submitted the draft final MMRP PA for<br />

the Marine Pistol and Rifle Range to regulators.<br />

p‰HT2s‚€2€�������<br />

Williamsburg FISC completed the TCRA shoreline stabilization<br />

project at Site 7.<br />

Funding issues delayed the RI with SERA Steps 1, 2, and 3a<br />

refinement at Site 11. Ecological issues delayed completion of<br />

the removal action for sediments at Site 1.<br />

p‰HT2ww‚€2€�������<br />

The installation completed a PA and initiated a site inspection<br />

(SI) for the Marine Pistol and Rifle Range.<br />

€�—�2��2e����<br />

Plan of action items for Williamsburg FISC, Cheatham Annex<br />

are grouped below according to program category.<br />

22222s‚€<br />

0 Initiate refinement for the RI with SERA<br />

Steps 1, 2, and 3a at Site 11 in FY07.<br />

0 Complete the removal action for sediments at<br />

Site 1 in FY07.<br />

0 Initiate the RI with baseline ERA at Site 11<br />

in FY07.<br />

22222ww‚€<br />

0 Complete a field investigation and SI of the<br />

Marine Pistol and Rifle Range in FY07.<br />

‰�������D2†������—<br />

M-209

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!