Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
€�—��2r—�˜��2x—�—�2g������ x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The Pearl Harbor Naval Complex consists of seven<br />
installations: the Fleet and Industrial Supply Center (FISC), the<br />
Naval Station (NS), the Naval Magazine (NAVMAG), the Naval<br />
Shipyard (NSY) and Intermediate Maintenance Facility, the<br />
Public Works Center (PWC), the Naval Submarine Base, and<br />
the Inactive Ship Maintenance Facility. Fuel supply activities,<br />
landfills, and other support operations have contaminated the<br />
soil and groundwater with volatile organic compounds (VOCs),<br />
semivolatile organic compounds (SVOCs), and metals. A<br />
technical review committee, formed in FY90, was converted to<br />
a Restoration Advisory Board (RAB) in FY95. The installation<br />
established three information repositories in FY90 and an<br />
administrative record in FY92. A community involvement plan<br />
was completed in FY92 and updated in FY95 and FY05. The<br />
installation was placed on the NPL in October 1992. In 2005,<br />
the BRAC Commission recommended Pearl Harbor Naval<br />
Complex for realignment. The installation signed a federal<br />
facility agreement (FFA) in March 1994.<br />
The installation has identified 80 sites and has conducted<br />
investigations and cleanups under CERCLA and RCRA at over<br />
60 sites. The installation completed one Record of Decision<br />
(ROD) for FISC Site 33. The cleanup progress at Pearl Harbor<br />
Naval Complex for FY02 through FY05 is detailed below.<br />
In FY02, the installation completed the draft final site summary<br />
reports (SSRs) for the Shipyard Geographic Study Areas, and<br />
final amendments to the Naval Housing, Makalapa, Richardson,<br />
Naval Sea System Command Inactive Ships On-Site<br />
Maintenance Office, and PWC Main Complex SSRs. The<br />
installation completed the removal action for Building 49 and<br />
initiated the site inspection (SI) for Solid Waste Management<br />
Unit (SWMU) 44. The Navy completed an inventory of all<br />
Military Munitions Response Program (MMRP) sites. One<br />
MMRP site was identified at this installation.<br />
In FY03, the installation continued the remedial action<br />
operations (RA-O) at Sites 25, 29, 36, 37, 45, and 46 and the<br />
remedial investigation and feasibility study (RI/FS) for Site 19.<br />
The Navy completed the removal action and remediation<br />
verification reports (RVRs) for Sites 25 and 45, the RI/FS for<br />
NS Sites 51 through 57, the draft final RI/FS for NS Site 31, and<br />
initiated removal actions for NS Sites 51 and 53 through 57.<br />
Navy<br />
rsWIUHHPRQRPHHD2rsWIUHHPRUUWHHD2rsWIUHHPRQRIHHD2<br />
rsWIUHHPRQRHHHD2rsWIUHHPRQQWHHD2—��2rsWIUHHPRQQRHH<br />
PDITP2—���<br />
€������2����—��2�����2�������2��2���2€�—��2r—�˜��2—��—<br />
UHFVPY2��—��2��2x€v2��2y��˜��2IWWP<br />
ppe2������2��2w—��2IWWR<br />
†yg�D2ƒ†yg�D2��—��2���—��D2€gf�D2���������D2���������D2<br />
�����—�˜���D2��������<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62IUSFV2�������<br />
2i��F2g„g2@g���2‰�—�AX 62IPRFQ2�������@p‰2PHQSA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIRGp‰2PHHR<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
Removal actions continued at the PWC Sites 4 and 43, and for<br />
NS Sites 31 and 35, transformer sites PWC Site 34, NAVMAG<br />
Site 19, and NS Site 52. The installation completed the draft<br />
groundwater RI for Sites 33 and 39, and supplemental RI for<br />
Site 22. The installation completed the draft expanded SI for<br />
NSY Site 42, the draft SI for NAVMAG West Loch and Waipio<br />
Peninsula Geographic Study Areas, the final SSR for Shipyard<br />
Geographic Study Area, and the final SSR amendments for<br />
Halawa-Main-Gate, Pearl City Peninsula, and West Loch. Draft<br />
final planning documents for site characterization for PWC Site<br />
47 were completed. The Navy added an MMRP site at the<br />
NAVMAG West Loch for further investigation of potential<br />
munitions-generated constituents in a burning pit. The<br />
installation provided site tours for the RAB of NS Sites 51 and<br />
53 through 57, the Material Minimization Facility Center, the<br />
Fort Kamehameha Wastewater Treatment Plant, and the Bilge<br />
Water/Oily Waste Treatment Facility. In addition, the installation<br />
partnered with the EPA Superfund Innovative Technology<br />
Evaluation program on two innovative technology treatment<br />
demonstrations.<br />
In FY04, the installation completed removal actions for NS Sites<br />
51, 53 through 57, and PWC Site 34 and continued removal<br />
actions at NS Site 31, RA-O at Sites 25, 29, 36, 37, 45, and 46,<br />
and RI for NS Site 19. The installation initiated the removal site<br />
evaluation (RSE) at NS SWMU 6. The installation finalized the<br />
innovative Technology Evaluation Report for NSY Site 10 and<br />
initiated the SI for NSY Site 49. The installation completed the<br />
combined SI for West Loch and Waipio Peninsula and initiated<br />
the RSE at PWC Sites 2 and 48 and continued the SI report for<br />
SWMU 44.<br />
In FY05, the installation initiated the RSE for FISC Site 26. The<br />
installation continued RA-O at Sites 25, 29, 36, 37, 45, and 46,<br />
and RI for NS Site 19. The installation continued the SI for NSY<br />
SWMU 44, and the proposed plan (PP) for NSY Site 41, and<br />
RSE for PWC Sites 2, 25, and 48. The installation initiated SI<br />
fieldwork for NSY Site 49 and SI for SWMU 84, and completed<br />
the RVR for NS Sites 51 and 53 through 57.<br />
p‰HT2s‚€2€�������<br />
Pearl Harbor Naval Complex completed an RSE for NS SWMU<br />
6 and PWC Site 2. The installation completed RODs for FISC<br />
Site 33 and NAVMAG Site 9. Additionally, the installation<br />
completed PPs for NSY Site 41 and NAVMAG Site 9. The<br />
installation initiated an FS for FISC Site 39 and completed<br />
removal actions for NS Site 35 and FISC Site 26. A site<br />
characterization was initiated at PWC Site 47. The installation<br />
also completed a draft SI for NSY Site 49 and a final SI for NSY<br />
SWMU 44. The Navy initiated removal action for FISC Site 44.<br />
Pearl Harbor Naval Complex continued RA-O at NS Sites 25,<br />
29, 36, 37, 45, and 46. The cost of completing environmental<br />
restoration has changed significantly due to technical issues.<br />
Regulatory issues delayed the RI/FS at NS Site 19 and removal<br />
action for NSY Site 10. Regulatory issues delayed removal<br />
action at SWMU Site 44. Procedural issues delayed the ROD at<br />
NAVMAG Site 9.<br />
p‰HT2ww‚€2€�������<br />
The installation initiated a preliminary assessment (PA) for<br />
NAVMAG unexploded ordinance (UXO) Site 7; however,<br />
contractual issues delayed its completion.<br />
€�—�2��2e����<br />
Plan of action items for Pearl Harbor Naval Complex are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete RI/FS for NS Site 31 in FY07.<br />
0 Complete RI/FS planning documents and<br />
initiate data collection FS for NS Site 19 in<br />
FY07.<br />
0 Complete engineering evaluation and cost<br />
analysis for PWC Site 2 in FY07.<br />
0 Complete removal action at FISC Site 44 in<br />
FY07.<br />
22222ww‚€<br />
0 Complete PA for NAVMAG UXO Site 7 in FY07.<br />
€�—��2r—�˜��D2r—�—��<br />
M-162