07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

x—�—�2g�������2—��2„���������—�����2e��—2w—����2ƒ�—����D2€—��� x€v<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

The Naval Computer and Telecommunications Area Master<br />

Station (NCTAMS), Pacific installation operates two facilities on<br />

the island of Oahu, but conducts industrial operations primarily<br />

at the main station and receiver site in Wahiawa and the Naval<br />

Radio Transmitting Facility in Lualualei. The restoration<br />

program has focused on those two facilities, where<br />

maintenance and operation of electrical transformers and<br />

switches have been the primary sources of contamination. The<br />

installation was placed on the NPL in May 1994 because<br />

polychlorinated biphenyl (PCB)-contaminated soil was detected<br />

in work and residential areas. Contamination with metals and<br />

petroleum hydrocarbons also resulted from the station's<br />

operating and maintenance activities. Two Restoration Advisory<br />

Boards were established because the installation consisted of<br />

two primary facilities. The final community relations plan was<br />

completed in FY95.<br />

Thirty sites have been identified at this installation, including 24<br />

CERCLA sites and 5 underground storage tank (UST) sites.<br />

The installation has completed no further action (NFA)<br />

documentation for Site 14 and UST Sites 6 and 22. The<br />

cleanup progress at NCTAMS, Pacific for FY02 through FY05 is<br />

detailed below.<br />

In FY02, the installation completed the draft remedial<br />

investigation (RI) planning documents for Sites 6 and 24. The<br />

Navy completed an inventory of all Military Munitions Response<br />

Program (MMRP) sites. No MMRP sites were identified at this<br />

installation.<br />

In FY03, the installation completed draft work plans for the<br />

removal action at Sites 17, 18, and 20. In addition, the<br />

installation completed the RI fieldwork at Sites 6 and 24. The<br />

ecological risk assessment (ERA) for Sites 1, 2, 5, and 22<br />

continued. The installation drafted verification planning<br />

documents to confirm the Eureka laboratory results at Sites 14<br />

and 15.<br />

In FY04, the installation completed removal actions at Sites 17,<br />

18, and 20. Additionally, the installation completed draft reports<br />

for verification sampling to confirm Eureka laboratory results at<br />

Sites 14 and 15, and completed Step 3a ERA at Sites 1, 2, 5,<br />

and 22.<br />

Navy<br />

rsWIUHHPRQVVHH<br />

PDRHH2—���<br />

y���—��2—��2�—���—��2������—�����2�—�������2—��2���������2<br />

���2�—�—�2�����2����—��—�����2—��2�����2�����2��2���2�—�����2<br />

€—���<br />

SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />

h�—��2pee2—������<br />

€gf�D2���—��D2���������2�����—�˜���<br />

ƒ���<br />

2p������2��2h—��X<br />

62PPFH2�������<br />

2i��F2g„g2@g���2‰�—�AX 62QRFR2�������@p‰2PHIPA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGx���<br />

2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />

In FY05, NCTAMS completed final reports for verification<br />

sampling to confirm Eureka laboratory results at Sites 14 and<br />

15. The installation completed draft Step 3a ERA at Sites 6 and<br />

24.<br />

p‰HT2s‚€2€�������<br />

NCTAMS completed the RI reports for Sites 1, 2, 5, and 22.<br />

The installation also completed an NFA Record of Decision<br />

(ROD) for Site 22.<br />

Regulatory issues delayed the RI report for Sites 6 and 24.<br />

p‰HT2ww‚€2€�������<br />

The Navy has identified no MMRP sites at this installation.<br />

€�—�2��2e����<br />

Plan of action items for Naval Computer and<br />

Telecommunications Area Master Station, Pacific are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Complete RI report for Sites 6 and 24 in<br />

FY07.<br />

0 Complete engineering evaluation and cost<br />

analysis for Site 24 in FY07.<br />

0 Complete action memorandums and interim<br />

remedial actions for Sites 2 and 5 in FY07.<br />

0 Complete feasibility study for Site 1 in<br />

FY07.<br />

0 Complete NFA RODs for Sites 1, 2, and 5 in<br />

FY07.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

‡—��—�—2—��2v�—��—���D2r—�—��<br />

M-140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!