Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
x—�—�2g�������2—��2„���������—�����2e��—2w—����2ƒ�—����D2€—��� x€v<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The Naval Computer and Telecommunications Area Master<br />
Station (NCTAMS), Pacific installation operates two facilities on<br />
the island of Oahu, but conducts industrial operations primarily<br />
at the main station and receiver site in Wahiawa and the Naval<br />
Radio Transmitting Facility in Lualualei. The restoration<br />
program has focused on those two facilities, where<br />
maintenance and operation of electrical transformers and<br />
switches have been the primary sources of contamination. The<br />
installation was placed on the NPL in May 1994 because<br />
polychlorinated biphenyl (PCB)-contaminated soil was detected<br />
in work and residential areas. Contamination with metals and<br />
petroleum hydrocarbons also resulted from the station's<br />
operating and maintenance activities. Two Restoration Advisory<br />
Boards were established because the installation consisted of<br />
two primary facilities. The final community relations plan was<br />
completed in FY95.<br />
Thirty sites have been identified at this installation, including 24<br />
CERCLA sites and 5 underground storage tank (UST) sites.<br />
The installation has completed no further action (NFA)<br />
documentation for Site 14 and UST Sites 6 and 22. The<br />
cleanup progress at NCTAMS, Pacific for FY02 through FY05 is<br />
detailed below.<br />
In FY02, the installation completed the draft remedial<br />
investigation (RI) planning documents for Sites 6 and 24. The<br />
Navy completed an inventory of all Military Munitions Response<br />
Program (MMRP) sites. No MMRP sites were identified at this<br />
installation.<br />
In FY03, the installation completed draft work plans for the<br />
removal action at Sites 17, 18, and 20. In addition, the<br />
installation completed the RI fieldwork at Sites 6 and 24. The<br />
ecological risk assessment (ERA) for Sites 1, 2, 5, and 22<br />
continued. The installation drafted verification planning<br />
documents to confirm the Eureka laboratory results at Sites 14<br />
and 15.<br />
In FY04, the installation completed removal actions at Sites 17,<br />
18, and 20. Additionally, the installation completed draft reports<br />
for verification sampling to confirm Eureka laboratory results at<br />
Sites 14 and 15, and completed Step 3a ERA at Sites 1, 2, 5,<br />
and 22.<br />
Navy<br />
rsWIUHHPRQVVHH<br />
PDRHH2—���<br />
y���—��2—��2�—���—��2������—�����2�—�������2—��2���������2<br />
���2�—�—�2�����2����—��—�����2—��2�����2�����2��2���2�—�����2<br />
€—���<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
h�—��2pee2—������<br />
€gf�D2���—��D2���������2�����—�˜���<br />
ƒ���<br />
2p������2��2h—��X<br />
62PPFH2�������<br />
2i��F2g„g2@g���2‰�—�AX 62QRFR2�������@p‰2PHIPA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
In FY05, NCTAMS completed final reports for verification<br />
sampling to confirm Eureka laboratory results at Sites 14 and<br />
15. The installation completed draft Step 3a ERA at Sites 6 and<br />
24.<br />
p‰HT2s‚€2€�������<br />
NCTAMS completed the RI reports for Sites 1, 2, 5, and 22.<br />
The installation also completed an NFA Record of Decision<br />
(ROD) for Site 22.<br />
Regulatory issues delayed the RI report for Sites 6 and 24.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Naval Computer and<br />
Telecommunications Area Master Station, Pacific are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Complete RI report for Sites 6 and 24 in<br />
FY07.<br />
0 Complete engineering evaluation and cost<br />
analysis for Site 24 in FY07.<br />
0 Complete action memorandums and interim<br />
remedial actions for Sites 2 and 5 in FY07.<br />
0 Complete feasibility study for Site 1 in<br />
FY07.<br />
0 Complete NFA RODs for Sites 1, 2, and 5 in<br />
FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />