Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
‚�˜���2e��2p���2f—�� x€v<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The mission of Robins Air Force Base (AFB) is to provide<br />
logistics support for aircrafts. The installation was placed on the<br />
NPL in July 1987 and signed an interagency agreement (IAG)<br />
in July 1989. Primary contaminants at the site include<br />
trichloroethylene (TCE) and tetrachloroethane in soil and<br />
groundwater. This installation has formed a Restoration<br />
Advisory Board (RAB). Robins AFB completed a 5-year review<br />
in FY06.<br />
The NPL Site at Robins AFB is divided into three operable units<br />
(OUs): source control (OU 1), wetlands (OU 2), and<br />
groundwater (OU 3). An interim Record of Decision (ROD) has<br />
been signed for OU 2 and the final ROD for OUs 1 and 3 was<br />
completed in FY04. The cleanup progress at Robins AFB for<br />
FY02 through FY05 is detailed below.<br />
In FY02, the installation completed corrective action plans<br />
(CAPs) for Sites OT 020, OT 023, OT 037, and OT 041, and<br />
site closeout for Sites SS 010, OT 022, SS 035, SS 036, and<br />
OT 038. Remedial actions (RAs) were installed for Sites OT<br />
037 and OT 041. A feasibility study for OU 2 at Landfill (LF) 004<br />
was completed. Based on negotiations with the regulators, no<br />
RA was required for Site SS 036, and the site was closed. The<br />
study phases were completed for Sites LF 004, OT 020, OT<br />
023, SS 036, OT 037, and OT 041.<br />
In FY03, the installation completed the proposed plan and<br />
remedial design for OU 2 at LF 004; however, a ROD was not<br />
necessary since the remediation will be completed under<br />
RCRA. The installation completed the CAP for Site SS 040 and<br />
installed RAs for Sites OT 020 and SS 040. A 5-year<br />
performance-based contract was awarded to perform the CAP<br />
for Site DC 34 and remediate the site until no further action is<br />
necessary. Operations and maintenance (O&M) activities<br />
continued at 12 environmental restoration sites.<br />
In FY04, the installation completed the RA for Site OT 023 and<br />
began the RA for OU 2 at LF 004. The installation also<br />
completed the ROD for OUs 1 and 3 at LF 004. In addition,<br />
Robins AFB began the installation of the RA at Site DC 034.<br />
The draft CAP for Site DC 034 was prepared and submitted for<br />
regulatory review. The installation completed RAs at Sites OT<br />
029 and SS 042 and the sites achieved response complete<br />
Air Force<br />
qeRSUIUPRQQHHH<br />
VDVSS2—���<br />
€������2��������2�������2���2—���—��<br />
SIFTTY2��—��2��2x€v2��2t���2IWVU<br />
seq2������2��2t���2IWVW<br />
†yg�D2�—���2���������2—��2��������D2�—����D2��������D2<br />
���������2—��2�����2—���D2�—����D2—�˜��D2����D2„gi<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62ITRFU2�������<br />
2i��F2g„g2@g���2‰�—�AX 62IPTFQ2�������@p‰2PHPVA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHSGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
(RC) status. Area of Concern 15 and Site RW 015 also<br />
achieved RC status. O&M activities continued at nine<br />
environmental restoration sites. The Robins AFB RAB, made<br />
up of 17 community participants, regulators, and base<br />
members, met quarterly to discuss ongoing restoration<br />
activities.<br />
In FY05, Robins AFB completed the CAP and the installation of<br />
the RA for Site DC 34. The Air Force completed the RA for OU<br />
2 and the RA for Site SS 039. Robins AFB obtained site closure<br />
for Site SS 042 and conducted O&M activities at nine sites. The<br />
installation has obtained remedy in place (RIP) for all<br />
<strong>Installation</strong> Restoration Program (IRP) sites at the base. The Air<br />
Force updated its Military Munitions Response program<br />
(MMRP) inventory. No MMRP sites were identified at this<br />
installation during the inventory development. The RAB met<br />
quarterly to discuss ongoing restoration activities.<br />
p‰HT2s‚€2€�������<br />
Robins AFB obtained site closure at Site SS 039 and<br />
completed the 5-year review at the NPL site. The installation<br />
conducted O&M activities at eight sites and maintained land<br />
use controls (LUCs) at four sites. The Air Force installed final<br />
RIPs at all remaining sites. The Air Force awarded Robins AFB<br />
the Thomas D. White Restoration award for environmental<br />
achievements. The cost of completing environmental<br />
restoration has changed significantly due to changes in<br />
estimating criteria.<br />
The RAB met quarterly to discuss ongoing restoration activities.<br />
p‰HT2ww‚€2€�������<br />
The Air Force has identified no MMRP sites at this installation.<br />
r������2g�����D2q�����—<br />
€�—�2��2e����<br />
Plan of action items for Robins Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Obtain site closure for Site OT 029 in FY07.<br />
0 Perform O&M activities at eight sites in<br />
FY07.<br />
0 Maintain LUCs at four sites in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
M-176