07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

‡—��������2x—��2‰—�� x€vGf‚eg2PHHS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

Investigations at the Washington Navy Yard (WNY) had<br />

previously identified 18 sites and 3 leaking underground<br />

storage tank sites. Contaminants released from past storage<br />

and disposal operations at the installation may have migrated<br />

into shallow and deep aquifers and the Anacostia River. The<br />

installation was placed on the NPL in July 1998. A RCRA<br />

consent order, signed in July 1997, was added into WNY's<br />

federal facility agreement (FFA), which was signed in June<br />

1999. In 2005, the BRAC Commission recommended WNY for<br />

realignment. A community relations plan was developed in<br />

FY99.<br />

The installation has identified 27 sites. To date, the installation<br />

has completed Records of Decision (RODs) for Sites 5 and 6<br />

and two No Further Action (NFA) RODs. The cleanup progress<br />

at WNY for FY02 through FY05 is detailed below.<br />

In FY02, the installation completed the final draft remedial<br />

investigation (RI) for Sites 4, 6, and 14 and submitted it to<br />

regulators. Regulators approved the work plan for new site<br />

screening areas (SSAs) and fieldwork began. The installation<br />

completed final RI for Site 16. The RI work plan was submitted.<br />

The Navy completed an inventory of all Military Munitions<br />

Response Program (MMRP) sites. One MMRP site was<br />

identified at this installation.<br />

In FY03, the installation completed the draft work plan for<br />

investigation of fill as an SSA and completed the RI for two<br />

sites and a draft RI for nine sites. In addition, the installation<br />

began fieldwork for the Site 10 removal action and a facilitywide<br />

groundwater data gaps investigation.<br />

In FY04, the installation initiated a work plan for fill as an SSA<br />

at the installation and completed draft SSA investigation reports<br />

for several SSAs. It also completed an NFA ROD for Site 4 and<br />

continued removal action for Site 10. The installation conducted<br />

fieldwork for facilitywide groundwater data gaps and completed<br />

a facilitywide groundwater draft RI report. The installation also<br />

conducted fieldwork for Site 5. The installation completed the<br />

preliminary assessment (PA) process for the listed MMRP site<br />

(the Experimental Battery), as well as the draft final report and<br />

a recommendations report.<br />

Navy<br />

hgQIUHHPRQIHHH<br />

TQ2—���<br />

€������2��������D2��������2—��������—����2��—�D2�������D2<br />

��—�����2�—�������D2�������—�2�������D2—��2��������D2���2<br />

‡—��������2x—��2‰—��2���—���2—��2�����2—�������2�����<br />

RVFSUY2��—��2��2x€v2��2t���2IWWV<br />

ppe2������2��2t���2IWWW<br />

€gf�D2���������D2��������D2���—��<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62PTFS2�������<br />

2i��F2g„g2@g���2‰�—�AX 62IQFQ2�������@p‰2PHIUA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHHV<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

In FY05, WNY continued removal actions for Site 10 and<br />

completed SSA fill field investigation. It finalized the final<br />

proposed remedial action plan and NFA ROD for Site 14. It also<br />

finalized the RI and developed the NFA proposed plan (PP) for<br />

Site 16. The installation completed a final feasibility study and<br />

draft PP for Site 5. WNY provided a draft final PA to regulators<br />

and developed a Navy response to comments for regulators.<br />

p‰HT2s‚€2€�������<br />

WNY continued removal actions for Site 10. The installation<br />

finalized the Operable Unit (OU) 2 sediment work plan. The<br />

Navy finalized RODs for Sites 5 and 16. The installation also<br />

completed the work plan and field investigations for the Site 6<br />

extended RI.<br />

p‰HT2ww‚€2€�������<br />

The installation provided Navy with a response to comments for<br />

regulators. Additionally, the Navy finalized a PA for the one<br />

MMRP site.<br />

€�—�2��2e����<br />

Plan of action items for Washington Navy Yard are grouped<br />

below according to program category.<br />

22222s‚€<br />

0 Continue removal actions for Site 10 in FY07.<br />

0 Complete fieldwork for OU 2 near shore<br />

sediment investigation in FY07.<br />

0 Finalize work plan and complete field<br />

investigations for removal action at Site 6<br />

in FY07.<br />

0 Finalize RI work plan for SSAs 3, 8, and 10<br />

in FY07.<br />

22222ww‚€<br />

0 Conduct MMRP site inspection in FY08.<br />

‡—��������D2hg<br />

M-203

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!