Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
q�������2e��2p���2f—�� x€vGf‚eg2IWWQ<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
The mission of Griffiss Air Force Base (AFB) was to operate as<br />
an air refueling and long-range bombardment facility. EPA<br />
placed the installation on the NPL in 1987 and the Air Force<br />
signed a federal facility agreement (FFA) in June 1990. The<br />
1993 BRAC Commission recommended closure of Griffiss AFB.<br />
Sites identified at the installation include landfills, underground<br />
storage tanks (USTs), fire training areas, disposal pits, and spill<br />
areas. Possible off-site groundwater contamination was also<br />
identified. Interim actions conducted at the facility between<br />
FY86 and FY91 include modification of a landfill cap and<br />
removal of contaminated soil and USTs from a tank farm,<br />
various disposal pits, and the area adjacent to an aircraft<br />
nosedock. In FY95, the installation completed an Environmental<br />
Baseline Survey and, in FY96, the installation completed an<br />
environmental impact statement. Griffiss AFB formed a BRAC<br />
cleanup team (BCT) and a Restoration Advisory Board (RAB) in<br />
FY95. The BRAC cleanup plan was completed the same year.<br />
The installation received technical assistance for public<br />
participation funding in FY99. The installation completed the<br />
first 5-year review in FY05.<br />
Environmental studies identified 61 sites at Griffiss AFB. To<br />
date, the installation has signed 25 of the required 41<br />
environmental Records of Decision (RODs). The proposed plan<br />
(PP) was completed for Landfill 1 (LF 001), and five no further<br />
action/institutional control RODs were also completed. RODs<br />
have now been issued for all LFs. The cleanup progress at<br />
Griffiss AFB for FY02 through FY05 is detailed below.<br />
In FY02, a treatability study (TS) commenced for four<br />
trichloroethylene (TCE) plumes. Remediation began for three of<br />
the five remaining landfills. Six PPs were submitted and<br />
approved. Three RODs were executed. The Apron bioventing<br />
system was installed and initiated. The installation rescheduled<br />
the feasibility study (FS) and remediation activities for the<br />
creeks (SD 031 and SD 032) in order to allow for floodplain<br />
sampling that will evaluate the possibility of creating new<br />
wetlands.<br />
In FY03, the installation completed two landfill closures,<br />
continued another, and initiated a fourth. Four hardfill areas<br />
received closure approval, and an explanation of significant<br />
differences was executed, closing the groundwater component<br />
Air Force<br />
x‰PSUHHPRRSIHH<br />
QDTQV2—���<br />
y���—��2—��2���������2—��2����E�—���2˜��˜—������2�—�����<br />
QRFPHY2��—��2��2x€v2��2t���2IWVU<br />
ppe2������2��2t���2IWWH<br />
†yg�D2��—��2���—��D2€gf�D2���—��D2�����—����D2—����2<br />
��—����D2����D2������—���D2„giD2…ˆy<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62IQHFR2�������<br />
2i��F2g„g2@g���2‰�—�AX 62PTFV2�������@p‰2PHQWA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHWGp‰2PHHU<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
of four sites. The installation completed the FS for the two<br />
creeks and approved the associated PPs. The installation<br />
reconstructed the landfarming operation, which involved 80,000<br />
cubic yards of contaminated soil. The installation completed<br />
remediation of the small arms range (OT 061). <strong>Installation</strong> of<br />
the bioventing systems at Aprons 1 and 2 was completed. The<br />
installation removed 11,000 cubic yards of contaminated soil at<br />
the Tank Farms 1 and 3 sites. Griffiss AFB completed<br />
installation of the Pumphouse 1 (SS 054) free product recovery<br />
system and closed 12 petroleum spill sites.<br />
In FY04, Griffiss AFB initiated remediation of the final landfill,<br />
completed the LF 2/3 (LF 002) and LF 001 covers, and<br />
completed the TS for four TCE plumes. The installation<br />
executed the RODs for two creeks and awarded the<br />
remediation contract. The installation also issued the remedial<br />
investigation and FS results for Area of Concern 9 (SS 062).<br />
The Air Force conducted an inventory of Military Munitions<br />
Response Program (MMRP) sites. MMRP sites were identified<br />
at this installation.<br />
In FY05, the installation awarded the long-term monitoring and<br />
long-term operation performance-based contract (PBC). The<br />
installation completed three RODs and the first 5-year review.<br />
In addition, the installation commenced remediation of<br />
Three-Mile Creek (SD 031) and submitted PPs for six additional<br />
sites. The Air Force began evaluating requirements at MMRP<br />
sites at this installation. The RAB continued to meet<br />
semiannually and the BCT continued to meet at least quarterly.<br />
p‰HT2s‚€2€�������<br />
The installation issued a PBC for the remediation of the TCE<br />
plumes and four petroleum-contaminated groundwater sites.<br />
Griffiss AFB completed the remediation of LF 6 and Three Mile<br />
Creek. The cost of completing environmental restoration has<br />
changed significantly due to technical issues and changes in<br />
estimating criteria.<br />
Technical issues delayed the processing of six PPs and<br />
associated RODs, and the partial NPL delisting.<br />
p‰HT2ww‚€2€�������<br />
Griffiss AFB completed remediation activities at all MMRP sites.<br />
€�—�2��2e����<br />
Plan of action items for Griffiss Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Resolve vapor intrusion concerns in FY07.<br />
0 Recommence processing of six PPs and RODs in<br />
FY07.<br />
0 Complete three additional PPs in FY07.<br />
22222ww‚€<br />
0 Obtain administrative closure for 12 MMRP<br />
sites in FY07-FY08.<br />
‚���D2x��2‰���<br />
M-91