Pensacola Naval Air Station (NAS), which now serves as a<br />
flight training center, was formerly a naval air rework facility and<br />
an aviation depot. Operations that have caused contamination<br />
at the station include machine shops, a foundry, coating and<br />
paint shops, paint stripping and plating shops, various<br />
maintenance and support facilities, landfills, and storage<br />
facilities. Investigations have identified 38 CERCLA sites, 1<br />
solid waste management unit (SWMU), and 15 underground<br />
storage tank (UST) sites. Site types include landfills, disposal<br />
sites, polychlorinated biphenyls (PCBs) transformer and spill<br />
areas, industrial wastewater treatment plant areas, and<br />
evaporation ponds. The installation was placed on the NPL in<br />
December 1989, and a federal facility agreement (FFA) was<br />
signed in October 1990. In 2005, the BRAC Commission<br />
recommended Pensacola NAS for realignment. The installation<br />
formed a technical review committee in FY90 and converted it<br />
to a Restoration Advisory Board in FY94. In FY03, the<br />
installation completed a 5-year review.<br />
Pensacola NAS has identified 61 sites. Twelve Records of<br />
Decision (RODs) have been signed by the installation, including<br />
six for no further action (NFA). The cleanup progress at<br />
Pensacola NAS for FY02 through FY05 is detailed below.<br />
In FY02, the installation completed site assessment reports for<br />
UST Sites 19 and 24, and remedial action plans (RAPs) for<br />
UST Sites 15, 21, and 25. It also completed the interim<br />
remedial action (IRA) at Site 43 and initiated the 5-year review.<br />
The installation began groundwater monitoring at Site 15 and<br />
continued monitoring at Site 1. The RCRA permit for SWMU 1<br />
was renewed. The Navy completed an inventory of all Military<br />
Munitions Response Program (MMRP) sites. No MMRP sites<br />
were identified at this installation.<br />
In FY03, the installation removed the groundwater recovery<br />
system and continued monitoring for SWMU 1. The installation<br />
also completed the 5-year review. An IRA was initiated at Sites<br />
8 and 24. The installation began RAPs for UST Sites 20 and<br />
24.<br />
In FY04, Pensacola NAS continued groundwater monitoring at<br />
SWMU 1, and completed RAPs for UST Sites 20 and 24. The<br />
IRA was completed.<br />
Navy<br />
pvRIUHHPRTIHHH<br />
SDVUR2—���<br />
ƒ����2—�2—2������2��—�����2�����<br />
RPFRHY2��—��2��2x€v2��2h���˜��2IWVW<br />
ppe2������2��2y��˜��2IWWH<br />
e�����—D2—�˜�����D2˜������D2�—����D2��—��2���—��D2�—����D2<br />
€gf�D2���������D2�������D2������—���2—��2���������—���2<br />
��������D2��—����2�—����<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62TVFP2�������<br />
2i��F2g„g2@g���2‰�—�AX 62RUFP2�������@p‰2PHRIA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIRGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������2—��2��—����<br />
In FY05, Pensacola NAS completed the NFA ROD for Site 40<br />
Operable Unit (OU) 15. The Navy completed remedial<br />
investigation at Sites 44, 45, and 46. The installation completed<br />
groundwater monitoring at SWMU 1 and cleanup at UST Sites<br />
15 and 21.<br />
p‰HT2s‚€2€�������<br />
Pensacola NAS completed the NFA ROD for Site 02 (OU 03).<br />
The installation also completed the ROD with land use controls<br />
(LUCs) for Sites 8 and 24 (OU 13), and Site 38 (OU 11). The<br />
Navy continued groundwater monitoring at SWMU 1, Site 01<br />
(OU 01), and Site 15 (OU 04).<br />
Regulatory issues delayed the implementation of optimization<br />
fieldwork at Sites 01 (OU 01), 15 (OU 04), and SWMU 1.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Pensacola Naval Air Station are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Finalize the ROD with LUCs for Sites 11, 12,<br />
25, 26, 27, and 30 (OU 02) in FY07.<br />
0 Obtain NFA status for UST 19 in FY07.<br />
0 Implement optimization fieldwork at Site 01<br />
(OU 01) in FY07.<br />
0 Continue groundwater monitoring at Sites 01<br />
(OU 01), 15 (OU 04), and SWMU 1 in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />