Moffett Field Naval Air Station (NAS) was headquarters of the<br />
Commander, Patrol Wings U.S. Pacific Fleet. Responsible for<br />
submarine patrol operations across the Pacific, NAS Moffett<br />
Field was the largest P-3 base in the world. In July 1991, the<br />
BRAC Commission recommended closure of the installation.<br />
The installation was closed on July 1, 1994 and transferred to<br />
NASA. The Naval Air Manor property was transferred to a<br />
neighboring city. The associated Moffett Community Housing<br />
(MCH) was transferred to the Army. EPA placed the installation<br />
on the NPL in July 1987. The Navy signed a federal facility<br />
agreement (FFA) in FY90, amended it in FY94, and revised it in<br />
FY01. Sites at the installation include landfills, underground<br />
storage tanks, a burn pit, ditches, holding ponds, wetland<br />
sediments, French drains, maintenance areas, and fuel spill<br />
sites. Contaminants include polychlorinated biphenyls (PCBs),<br />
petroleum products, DDT, chlorinated solvents, and heavy<br />
metals. The installation was divided into seven operable units<br />
(OUs). The installation completed a community relations plan<br />
(CRP) and established an information repository in FY89. In<br />
FY94, it formed a BRAC cleanup team and completed a BRAC<br />
cleanup plan, which was updated in FY97. The installation<br />
converted its technical review committee to a Restoration<br />
Advisory Board (RAB) in FY95. A RAB forum for the Bay Area<br />
Community was held and the CRP was updated in FY02. In<br />
FY03, the installation completed 5-year review reports for two<br />
groundwater remedial sites.<br />
Environmental studies have identified 34 sites at the<br />
installation. In addition, the installation has completed several<br />
No Further Action (NFA) Records of Decision (RODs). The<br />
installation has also completed RODs for OU 1, Sites 22, 26,<br />
27, and 28. The installation has completed closure of 35<br />
petroleum sites. The cleanup progress at Moffett Field NAS for<br />
FY02 through FY05 is detailed below.<br />
In FY02, the installation completed closure of 35 petroleum<br />
sites. The ROD and remedial design (RD) for Site 22 were<br />
completed, as well as the proposed plan (PP) and ROD for the<br />
NFA sites. The installation submitted 5-year review reports for<br />
OU 1, and Sites 1 and 2 to regulatory agencies. Progress<br />
continued on the site management plan for delisting Moffett<br />
Field from the NPL. Support of the NASA-Navy memorandum<br />
of agreement (MOA) continued. The installation initiated an<br />
Navy<br />
geWIUHHPQPQVHH<br />
QDHWU2—���<br />
ƒ�����2—�2����2��2U��2s��—����2h�������2@v����AY2��������2���2<br />
h������2v—���—��2s��������2p������2v—���—��2g�����D2<br />
��������2—�2���2€�������2��2w�������D2g—�������—<br />
RPFPRY2��—��2��2x€v2��2p�˜��—��2IWWH<br />
ppe2������2��2t���2IWWH<br />
†yg�D2���������2�����—�˜���D2��—��2���—��D2���������<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62IQVFS2�������<br />
2i��F2g„g2@g���2‰�—�AX 62UPFV2�������@p‰2PHQIA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHWGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X g��������<br />
optimization study for Sites 26 and 28 pump-and-treat systems.<br />
A human health risk assessment (HHRA) on MCH started due<br />
to groundwater contamination. The Navy completed an<br />
inventory of all Military Munitions Response Program (MMRP)<br />
sites. No MMRP sites were identified at this installation.<br />
In FY03, the installation completed a 5-year review report for<br />
both the westside and eastside aquifer treatment systems.<br />
Additionally, the installation completed the PP for Site 25 and<br />
initiated a time-critical removal action (TCRA) at the new source<br />
area, Hangar 1. The installation completed the feasibility study<br />
(FS) for Site 27 and the remedial action (RA) for Site 22. The<br />
HHRA at MCH was completed, although additional studies are<br />
needed to supplement HHRA. An additional seven petroleum<br />
sites were closed.<br />
In FY04, the installation completed the Hangar 1 TCRA and<br />
started work on the remedial investigation (RI) and FS work<br />
plan for Hangar 1. The installation completed the Site 27 PP.<br />
Optimization of the Sites 26 and 28 pump-and-treat systems<br />
began. The installation completed air sampling at MCH and a<br />
work plan drafted for the final phase of groundwater<br />
investigation. The installation received closure letters for<br />
petroleum sites from the California Regional Water Quality<br />
Control Board.<br />
In FY05, the installation finalized the Moffett Field NAS Site 25<br />
RI report addendum and submitted the draft FS report<br />
addendum for agency review and comment. The Navy finalized<br />
the Site 27 ROD and began the RD for RA. The installation<br />
continued the site management plan for delisting Moffett Field<br />
from the NPL and support of the NASA-Navy MOA.<br />
p‰HT2s‚€2€�������<br />
Moffet Field NAS developed and submitted an FS for Site 25.<br />
The installation also completed and implemented the Site 27<br />
RD, and implemented optimization of the Site 26<br />
pump-and-treat system. The Navy continued resolution of<br />
groundwater contaminant responsibility. The cost of completing<br />
environmental restoration has changed significantly due to<br />
technical issues, regulatory issues, and changes in estimating<br />
criteria.<br />
Regulatory issues delayed the PP and ROD for Site 25.<br />
Regulatory issues also delayed removal action at Site 29. In<br />
addition, procedural issues delayed RA for Site 27.<br />
p‰HT2ww‚€2€�������<br />
The Navy has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Moffett Field Naval Air Station are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete Site 29 removal action in FY08.<br />
0 Begin Site 25 RA in FY08.<br />
0 Continue resolution of groundwater<br />
contaminant responsibility in FY08.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />