Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
‡�����E€—�������2e��2p���2f—�� x€vGf‚eg2PHHS<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Past activities at Wright-Patterson Air Force Base (AFB)<br />
created spill sites and unlined waste disposal areas, including<br />
landfills, fire training areas, underground storage tanks, earth fill<br />
disposal areas, and coal storage areas. Soil and groundwater<br />
have been contaminated with volatile organic compounds<br />
(VOCs); semi-volatile organic compounds (SVOCs);<br />
trichloroethylene (TCE); and benzene, toluene, ethyl benzene,<br />
and xylene compounds. Fire training exercises conducted in<br />
unlined pits contaminated soil and groundwater with fuel and its<br />
combustion by-products. EPA placed the installation on the<br />
NPL in October 1989 and the Air Force signed an interagency<br />
agreement (IAG) in March 1991. In 2005, the BRAC<br />
Commission recommended Wright-Patterson AFB for<br />
realignment. In FY97, two new sites, Contaminated<br />
Groundwater Area A/C and Contaminated Groundwater Area B,<br />
were added to address commingled groundwater plumes and to<br />
expedite source area site closure. The installation completed<br />
5-year reviews in FY00 and FY06.<br />
Investigations have identified 68 sites and 5 areas of concern<br />
(AOCs). To date, two AOCs have been remediated. Records of<br />
Decision (RODs) have been signed for Landfills (LFs) 8 and 10,<br />
groundwater remediation, and another 40 <strong>Installation</strong><br />
Restoration Program (IRP) sites. A no further action ROD was<br />
signed for 21 sites. The cleanup progress at Wright-Patterson<br />
AFB for FY02 through FY05 is detailed below.<br />
In FY02, the installation continued system operations and<br />
maintenance (O&M) and long-term management (LTM)<br />
activities. State and federal agencies accepted a final report<br />
detailing restoration activities at Facility 20059. The installation<br />
completed site fieldwork at Facility 20079 and submitted a draft<br />
report to the State confirming shallow TCE contamination in<br />
groundwater.<br />
In FY03, the installation completed the preliminary assessment<br />
(PA) at AOC Building 20055. The removal action of<br />
contaminated soils at AOC Building 20025 was also completed.<br />
Supplemental floating-product recovery through the use of a<br />
bioslurper was initiated. O&M and LTM continued throughout<br />
the year.<br />
Air Force<br />
yrSSUIUPRQIPHH<br />
VDSII2—���<br />
ƒ����2—�2����2��2�—��2���—���—�����D2��������2��—���—�����2<br />
e��2p���2w—������2g���—��<br />
SUFVSY2��—��2��2x€v2��2y��˜��2IWVW<br />
seq2������2��2w—��2IWWI<br />
‡—���2����2—��2�����D2—���D2��—����2�—����D2†yg�D2ƒ†yg�D2<br />
��������D2„gi<br />
q������—���2—��2����<br />
2p������2��2h—��X<br />
62IVWFU2�������<br />
2i��F2g„g2@g���2‰�—�AX 62QQFV2�������@p‰2PHPVA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHUGp‰2PHHQ<br />
2p���E‰�—�2‚�����2ƒ�—���X …�����—�<br />
In FY04, Wright-Patterson AFB began conducting 5-year<br />
reviews and continued system O&M and LTM activities.<br />
In FY05, Wright-Patterson AFB continued O&M and LTM<br />
activities. The installation initiated the 5-year review and the<br />
time-critical removal action (TCRA) of contaminated soils at<br />
Facility 20055. The Air Force updated its Military Munitions<br />
Response Program (MMRP) inventory. No new MMRP sites<br />
were identified during the inventory development.<br />
p‰HT2s‚€2€�������<br />
Wright-Patterson AFB completed the 5-year review and the<br />
O&M and LTM optimization. Wright-Patterson AFB also<br />
conducted a TCRA of contaminated soils at Facility 20055. The<br />
installation completed the quality assurance project plan, which<br />
was approved by regulatory agencies. The cost of completing<br />
environmental restoration has changed significantly due to<br />
changes in estimating criteria.<br />
p‰HT2ww‚€2€�������<br />
The Air Force has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Wright-Patterson Air Force Base are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Abandon select groundwater monitoring wells<br />
in FY07.<br />
0 Complete documentation for closeout of AOC<br />
79/95 and Site DP 068 in FY07.<br />
0 Prepare documentation for partial soils<br />
delisting from NPL in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
h—����D2y���<br />
M-212