Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
Appendix M: Installation Narrative Summaries - denix
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
—����2e��2p���2f—�� x€v<br />
2ppshX<br />
2ƒ���X<br />
2w������X<br />
2r‚ƒ2ƒ���X<br />
2seq2ƒ�—���X<br />
2g���—���—���X<br />
2w���—2e������X<br />
€�������2„�2h—��<br />
Hanscom Air Force Base (AFB) supports the electronic system<br />
center. EPA placed the installation on the NPL in May 1994.<br />
Operations at Hanscom AFB have involved generation, use,<br />
and disposal of numerous hazardous substances. Possible<br />
sources of contamination investigated include a former<br />
industrial wastewater treatment system, a former filter<br />
bed/landfill area, a jet fuel residue and tank sludge area, two<br />
landfills, three former fire training areas, a paint waste disposal<br />
area, a mercury spill area, the former aviation fuel handling and<br />
storage facilities, underground storage tanks, and fuel spill<br />
areas. In FY95, the installation converted its technical review<br />
committee to a Restoration Advisory Board. A 5-year review<br />
was completed for the Operable Unit (OU) 2 remedy in FY97.<br />
Another 5-year review was completed for the Hanscom<br />
Field/Hanscom AFB Superfund Site in FY02. Both of these<br />
reviews concluded that the remedies were protective of human<br />
health and the environment. In FY02, a 5-year review was also<br />
completed for two Massachusetts Contingency Plan (MCP)<br />
sites, which recommended continued monitoring.<br />
Studies have identified 22 sites at the installation. Fourteen<br />
sites have been closed out and remedies are in place at the<br />
eight remaining sites. To date, Records of Decision (RODs)<br />
have been signed for OU 3/<strong>Installation</strong> Restoration Program<br />
(IRP) Sites 6 and 21. An interim ROD was signed for OU 1. The<br />
cleanup progress at Hanscom AFB for FY02 through FY05 is<br />
detailed below.<br />
In FY02, the installation finalized the ROD, continued the<br />
removal action, and began the design and construction of the<br />
final remedy for OU 3/IRP Site 21. In addition, remedial<br />
action-operations (RA-O) continued at OUs 1, 2, 3/IRP Site 6,<br />
the Army and Air Force Exchange Service (AAFES) service<br />
station, and base motor pool sites. The installation completed<br />
the second 5-year review of the Hanscom Field/Hanscom AFB<br />
Superfund Site. The review concluded that the remedies in<br />
place, or programmed, are expected to be protective of human<br />
health and the environment. The installation also completed a<br />
5-year review of two MCP sites that recommended continued<br />
monitoring of both sites.<br />
Air Force<br />
weISUIUPRRPRHH<br />
VPT2—���<br />
ƒ������2i�������2ƒ�����2g�����<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2�����2������—����<br />
†yg�D2������—���2��������D2�—������D2���2����D2����—�����2��—�D2<br />
€gf�D2������<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62QTFT2�������<br />
2i��F2g„g2@g���2‰�—�AX 62WFV2�������@p‰2PHPHA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHHQGx���<br />
2p���E‰�—�2‚�����2ƒ�—���X €�—����<br />
In FY03, the installation completed the design and construction<br />
of the final remedy for OU 3/IRP Site 21 and began RA-O. The<br />
remedy incorporated the previous removal action. It is also the<br />
final remedy required for the installation. In addition, RA-O<br />
continued at OUs 1, 2, 3/IRP Site 6, the AAFES service station,<br />
and base motor pool sites.<br />
In FY04, the installation continued RA-O at OUs 1, 2, 3/IRP Site<br />
6, OU 3/IRP Site 21, the AAFES service station, and base<br />
motor pool sites.<br />
In FY05, the installation continued RA-O at OUs 1, 2, 3/IRP Site<br />
6, OU 3 IRP Site 21, the AAFES service station, and base<br />
motor pool sites. The Air Force updated its Military Munitions<br />
Response program (MMRP) inventory. No MMRP sites were<br />
identified at this installation during the inventory development.<br />
p‰HT2s‚€2€�������<br />
Hanscom AFB continued RA-O at OUs 1, 2, 3/IRP Site 6, OU 3<br />
IRP Site 21, the AAFES service station, and base motor pool<br />
sites.<br />
p‰HT2ww‚€2€�������<br />
The Air Force has identified no MMRP sites at this installation.<br />
€�—�2��2e����<br />
Plan of action items for Hanscom Air Force Base are grouped<br />
below according to program category.<br />
22222s‚€<br />
0 Continue RA-O at OUs 1, 2, 3/IRP Site 6, OU<br />
3/IRP Site 21, AAFES service station and base<br />
motor pool sites in FY07.<br />
22222ww‚€<br />
There are no MMRP actions scheduled for FY07 or<br />
FY08.<br />
f������D2w—��—�������<br />
M-95