In July 1995, the BRAC Commission recommended closure of<br />
the South Weymouth Naval Air Station (NAS). Operations were<br />
transferred to Brunswick NAS; aircraft, personnel, and<br />
equipment were relocated. The installation was closed in<br />
September 1997. Initially, eight CERCLA sites and one RCRA<br />
underground storage tank (UST) site were identified at the<br />
installation. Prominent site types include a landfill, a UST, a<br />
tank farm where jet fuel was stored, sewage treatment facilities,<br />
a rubble disposal area, and a firefighter training area. EPA<br />
placed the installation on the NPL in May 1994, and the<br />
installation signed a federal facility agreement (FFA) in April<br />
2000. The installation established a technical review committee<br />
in FY92 and converted it to a Restoration Advisory Board (RAB)<br />
in FY94. In FY92, the installation established an administrative<br />
record and four information repositories, and completed its<br />
community relations plan, which was updated in August 1998.<br />
A BRAC cleanup plan was released. A technical assistance for<br />
public participation grant was awarded to the RAB in FY99. In<br />
FY99, the installation also completed the Environmental<br />
Baseline Survey (EBS) Phase II work plan and the surface<br />
debris removal action for four <strong>Installation</strong> Restoration Program<br />
(IRP) sites.<br />
Fifteen sites have been identified at this installation (11<br />
CERCLA, 2 RCRA UST, and 2 MMRP Sites). The installation<br />
has completed a Record of Decision (ROD) for Sites 2, 3, 4, 5,<br />
and 8. The cleanup progress at South Weymouth NAS for FY02<br />
through FY05 is detailed below.<br />
In FY02, the installation completed the remedial investigation<br />
(RI) Phase II risk assessments and reports for four CERCLA<br />
sites. The installation completed a feasibility study (FS) for Site<br />
2 and initiated FSs for Sites 1 and 7. It also completed the Site<br />
9 pilot study and submitted the RI work plan. The installation<br />
completed the proposed plan (PP) and ROD for Site 3 and<br />
initiated the Sites 9 and 10 RI work plans. The Navy completed<br />
an inventory of all Military Munitions Response Program<br />
(MMRP) sites. Two MMRP sites were identified at this<br />
installation.<br />
In FY03, the installation completed an FS at Site 1. The<br />
installation also completed a field program and released the<br />
Site 4 PP for public comment. The installation continued to<br />
Navy<br />
weIIUHHPPHPPHH<br />
PDHWR2—���<br />
€�������2—��������—����2������—����2—��2�������—�2�������2���2<br />
‚������2�����Y2��������2�������—�2�������2���2���2w—����2e��2<br />
‚������2„�—�����2h��—�����2ƒ����2‡�������<br />
SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />
ppe2������2��2e����2PHHH<br />
€��������2�����—�˜���D2��������D2—���D2�—����D2���—��D2<br />
�������—���2����—��D2��������—�2�—����D2…ˆy<br />
2w���—2e������X<br />
q������—���D2����—�2�—���D2��������D2����<br />
2p������2��2h—��X<br />
62RUFH2�������<br />
2i��F2g„g2@g���2‰�—�AX 62RHFV2�������@p‰2PHQQA<br />
2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHHU<br />
2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />
incorporate the EBS to the basewide report work. The Navy<br />
completed an inventory of all MMRP sites. Preliminary<br />
assessments were completed and no further action (NFA) was<br />
planned.<br />
In FY04, the Sites 2 and 4 RODs were signed and the PP was<br />
completed for Site 4. South Weymouth NAS completed the Site<br />
2 remedial design (RD) and initiated the remedial action (RA).<br />
In FY05, the installation continued to complete RA at Site 2<br />
consistent with the ROD. South Weymouth NAS collected<br />
supplemental groundwater data for Site 5 and favorable results<br />
allowed the NFA PP to be finalized. The installation continued<br />
RI work plan development for Sites 9, 10, and 11. The<br />
installation completed a revised reuse plan that was adopted by<br />
the local redevelopment authority and the affected<br />
communities. Sites 3 and 4 were issued corrective action<br />
demands by the State, and remedial efforts began. The Navy<br />
submitted a revised draft final PP for Site 1 after the revised<br />
reuse plan was approved.<br />
p‰HT2s‚€2€�������<br />
South Weymouth NAS signed the Site 5 ROD. The installation<br />
completed the remedy at Site 2. The Navy issued the draft final<br />
FS for Site 7. Additionally, the Navy began design for Site 3 and<br />
completed state regulation cleanup required at Site 4.<br />
The installation reached agreement with regulators for<br />
finalization of the PP for Site 1; however, additional regulatory<br />
issues delayed completion of the PP, ROD, and RD for the site.<br />
p‰HT2ww‚€2€�������<br />
The installation completed a removal action for Unexploded<br />
Ordnance (UXO) 1.<br />
‡�������D2w—��—�������<br />
€�—�2��2e����<br />
Plan of action items for South Weymouth Naval Air Station are<br />
grouped below according to program category.<br />
22222s‚€<br />
0 Complete RIs and FSs for Sites 9, 10, and 11<br />
in FY07-FY08.<br />
0 Finalize PP, sign ROD, and complete RD for<br />
Site 1 in FY07-FY08.<br />
0 Finalize the FS, PP, and ROD for Site 7 in<br />
FY07-FY08.<br />
0 Complete design and initiate remedy for Site<br />
3 in FY07-FY08.<br />
22222ww‚€<br />
0 Complete the FS, PP, RD, and ROD for UXO 1 in<br />
FY07-FY08.<br />
0 Conduct a limited surface clearance as part<br />
of operation and maintenance activities in<br />
FY07-FY08.<br />
M-184