07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ƒ����2‡�������2x—�—�2e��2ƒ�—���� x€vGf‚eg2IWWS<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

€�������2„�2h—��<br />

In July 1995, the BRAC Commission recommended closure of<br />

the South Weymouth Naval Air Station (NAS). Operations were<br />

transferred to Brunswick NAS; aircraft, personnel, and<br />

equipment were relocated. The installation was closed in<br />

September 1997. Initially, eight CERCLA sites and one RCRA<br />

underground storage tank (UST) site were identified at the<br />

installation. Prominent site types include a landfill, a UST, a<br />

tank farm where jet fuel was stored, sewage treatment facilities,<br />

a rubble disposal area, and a firefighter training area. EPA<br />

placed the installation on the NPL in May 1994, and the<br />

installation signed a federal facility agreement (FFA) in April<br />

2000. The installation established a technical review committee<br />

in FY92 and converted it to a Restoration Advisory Board (RAB)<br />

in FY94. In FY92, the installation established an administrative<br />

record and four information repositories, and completed its<br />

community relations plan, which was updated in August 1998.<br />

A BRAC cleanup plan was released. A technical assistance for<br />

public participation grant was awarded to the RAB in FY99. In<br />

FY99, the installation also completed the Environmental<br />

Baseline Survey (EBS) Phase II work plan and the surface<br />

debris removal action for four <strong>Installation</strong> Restoration Program<br />

(IRP) sites.<br />

Fifteen sites have been identified at this installation (11<br />

CERCLA, 2 RCRA UST, and 2 MMRP Sites). The installation<br />

has completed a Record of Decision (ROD) for Sites 2, 3, 4, 5,<br />

and 8. The cleanup progress at South Weymouth NAS for FY02<br />

through FY05 is detailed below.<br />

In FY02, the installation completed the remedial investigation<br />

(RI) Phase II risk assessments and reports for four CERCLA<br />

sites. The installation completed a feasibility study (FS) for Site<br />

2 and initiated FSs for Sites 1 and 7. It also completed the Site<br />

9 pilot study and submitted the RI work plan. The installation<br />

completed the proposed plan (PP) and ROD for Site 3 and<br />

initiated the Sites 9 and 10 RI work plans. The Navy completed<br />

an inventory of all Military Munitions Response Program<br />

(MMRP) sites. Two MMRP sites were identified at this<br />

installation.<br />

In FY03, the installation completed an FS at Site 1. The<br />

installation also completed a field program and released the<br />

Site 4 PP for public comment. The installation continued to<br />

Navy<br />

weIIUHHPPHPPHH<br />

PDHWR2—���<br />

€�������2—��������—����2������—����2—��2�������—�2�������2���2<br />

‚������2�����Y2��������2�������—�2�������2���2���2w—����2e��2<br />

‚������2„�—�����2h��—�����2ƒ����2‡�������<br />

SHFHHY2��—��2��2x€v2��2w—�2IWWR<br />

ppe2������2��2e����2PHHH<br />

€��������2�����—�˜���D2��������D2—���D2�—����D2���—��D2<br />

�������—���2����—��D2��������—�2�—����D2…ˆy<br />

2w���—2e������X<br />

q������—���D2����—�2�—���D2��������D2����<br />

2p������2��2h—��X<br />

62RUFH2�������<br />

2i��F2g„g2@g���2‰�—�AX 62RHFV2�������@p‰2PHQQA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHIPGp‰2PHHU<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

incorporate the EBS to the basewide report work. The Navy<br />

completed an inventory of all MMRP sites. Preliminary<br />

assessments were completed and no further action (NFA) was<br />

planned.<br />

In FY04, the Sites 2 and 4 RODs were signed and the PP was<br />

completed for Site 4. South Weymouth NAS completed the Site<br />

2 remedial design (RD) and initiated the remedial action (RA).<br />

In FY05, the installation continued to complete RA at Site 2<br />

consistent with the ROD. South Weymouth NAS collected<br />

supplemental groundwater data for Site 5 and favorable results<br />

allowed the NFA PP to be finalized. The installation continued<br />

RI work plan development for Sites 9, 10, and 11. The<br />

installation completed a revised reuse plan that was adopted by<br />

the local redevelopment authority and the affected<br />

communities. Sites 3 and 4 were issued corrective action<br />

demands by the State, and remedial efforts began. The Navy<br />

submitted a revised draft final PP for Site 1 after the revised<br />

reuse plan was approved.<br />

p‰HT2s‚€2€�������<br />

South Weymouth NAS signed the Site 5 ROD. The installation<br />

completed the remedy at Site 2. The Navy issued the draft final<br />

FS for Site 7. Additionally, the Navy began design for Site 3 and<br />

completed state regulation cleanup required at Site 4.<br />

The installation reached agreement with regulators for<br />

finalization of the PP for Site 1; however, additional regulatory<br />

issues delayed completion of the PP, ROD, and RD for the site.<br />

p‰HT2ww‚€2€�������<br />

The installation completed a removal action for Unexploded<br />

Ordnance (UXO) 1.<br />

‡�������D2w—��—�������<br />

€�—�2��2e����<br />

Plan of action items for South Weymouth Naval Air Station are<br />

grouped below according to program category.<br />

22222s‚€<br />

0 Complete RIs and FSs for Sites 9, 10, and 11<br />

in FY07-FY08.<br />

0 Finalize PP, sign ROD, and complete RD for<br />

Site 1 in FY07-FY08.<br />

0 Finalize the FS, PP, and ROD for Site 7 in<br />

FY07-FY08.<br />

0 Complete design and initiate remedy for Site<br />

3 in FY07-FY08.<br />

22222ww‚€<br />

0 Complete the FS, PP, RD, and ROD for UXO 1 in<br />

FY07-FY08.<br />

0 Conduct a limited surface clearance as part<br />

of operation and maintenance activities in<br />

FY07-FY08.<br />

M-184

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!