07.01.2013 Views

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

Appendix M: Installation Narrative Summaries - denix

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

p���Ee����2g����—� x€v<br />

2ppshX<br />

2ƒ���X<br />

2w������X<br />

2r‚ƒ2ƒ���X<br />

2seq2ƒ�—���X<br />

2g���—���—���X<br />

2w���—2e������X<br />

€�������2„�2h—��<br />

Fike-Artel Chemical is part of a 16,000-acre former government<br />

plant (Powder Plant "C") that manufactured smokeless powder.<br />

Environmental restoration sites were grouped into five operable<br />

units (OUs): disposal of storage tank and drum contents (OU<br />

1); decontamination and disposal of storage tanks, surface<br />

drums, and aboveground structures (OU 2); removal of buried<br />

drums (OU 3); remedial investigation (RI) and feasibility study<br />

of groundwater and soil (OU 4); and RI of the cooperative<br />

sewage treatment (CST) plant (OU 5). EPA placed the property<br />

on the NPL in 1983. EPA and the West Virginia Department of<br />

Environmental Protection conducted a 5-year review in FY02.<br />

The Army approved a Military Munitions Response Program<br />

(MMRP) project in FY96. The cleanup progress at Fike-Artel<br />

Chemical for FY02 through FY05 is detailed below.<br />

In FY02, the potentially responsible parties (PRPs) provided<br />

their written election to perform the Record of Decision soils<br />

groundwater remedies. The PRPs and EPA began to address<br />

the relevant technical details through the preparation of a plan<br />

for delineating the extent of the groundwater plume. The PRPs<br />

submitted that plan for EPA approval. EPA approved the OU 4<br />

and OU 5 soils remedial design (RD) submittal. The<br />

groundwater pre-RD work plan, and sampling and analysis plan<br />

were submitted for approval. The operation of the stormwater<br />

pretreatment system continued. EPA and the West Virginia<br />

Department of Environmental Protection conducted the 5-year<br />

review inspection. The U.S. Army Corps of Engineers (USACE)<br />

completed a draft archive search report (ASR) for the entire<br />

16,000-acre former government plant.<br />

In FY03, USACE completed the soils remedy at the CST Plant,<br />

which was leased by the local redevelopment authority as a<br />

truck terminal. EPA approved the groundwater pre-RD<br />

investigation work plan,and the sampling and analysis plan.<br />

In FY04, work began for the complex groundwater RD. The<br />

PRPs began the work plan for the WWI sewer lines, and<br />

included a video inspection of the 66-inch sewer line. In<br />

addition, the soil remedy was completed for OU 4 and the CST<br />

plant. USACE also completed the ASR after it received no<br />

additional comments.<br />

FUDS<br />

‡†QWUWWpUVWPHH<br />

IP2—���<br />

w—���—�����2���������2������2@����—��2�—���2����—���2—2<br />

˜—��2����—�2��—��A<br />

QTFQY2��—��2��2x€v2��2ƒ�����˜��2IWVQ<br />

x���<br />

h�����D2���—��2—��2�����—��2����—��D2���—��<br />

q������—���2—��2����<br />

2p������2��2h—��X<br />

62HFU2�������<br />

2i��F2g„g2@g���2‰�—�AX 62HFI2�������@p‰2PHISA<br />

2s‚€Gww‚€2ƒ����2p��—�2‚s€G‚gX p‰2PHISGp‰2PHHR<br />

2p���E‰�—�2‚�����2ƒ�—���X SE��—�2������2���2��������2���2����2����—��—����<br />

In FY05, the operations and maintenance (O&M) for OU 4 and<br />

the CST plant continued. USACE continued the groundwater<br />

component of the RD. RD efforts discovered new information<br />

with respect to groundwater flow, requiring an increase in the<br />

RD effort and removal action remedy.<br />

p‰HT2s‚€2€�������<br />

USACE initiated a remedial action work plan for groundwater.<br />

The OU 4 and CST plant O&M, and the RD for groundwater<br />

work continued. USACE completed the 66-inch and 12-inch<br />

sewer line investigations. EPA approved a schedule change<br />

and moved the remedy start date to FY06.<br />

p‰HT2ww‚€2€�������<br />

The USACE conducted no MMRP actions at this property.<br />

€�—�2��2e����<br />

Plan of action items for Fike-Artel Chemical are grouped below<br />

according to program category.<br />

22222s‚€<br />

0 Complete RD for the ground water component in<br />

FY07.<br />

0 Complete cleaning of the 66-inch WWI sewer<br />

and the 12-inch sewer lines in FY07.<br />

0 Complete Phase I ground water remedy well<br />

spacing test along Pickens Road in FY07.<br />

0 Continue OU 4, CST plant O&M in FY07-FY08.<br />

22222ww‚€<br />

There are no MMRP actions scheduled for FY07 or<br />

FY08.<br />

x����D2‡���2†������—<br />

M-63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!