24.01.2013 Views

SIRS - p-12 - New York State Education Department

SIRS - p-12 - New York State Education Department

SIRS - p-12 - New York State Education Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix 18: Special <strong>Education</strong> Event Reason Codes (for SPP Indicators 11 and <strong>12</strong>)<br />

Reasons for delay in evaluation of school-age students (past 60 calendar days from the date of<br />

receipt of parental consent to evaluate to date of CSE meeting at which evaluation results are<br />

discussed) for special education eligibility. (SPP Indicator 11)<br />

Code Name Description for Use in Level 2<br />

CSER01<br />

Parents withdrew referral or consent<br />

to evaluate (C)<br />

Parents withdrew referral or consent to<br />

evaluate (C)<br />

CSER02 Student moved out of the district (C) Student moved out of the district (C)<br />

CSER03 Student died (C) Student died (C)<br />

CSER04<br />

Evaluator was not available to provide<br />

a timely evaluation (NC)<br />

Delays in making contact with parents<br />

Evaluator was not available to provide a<br />

timely evaluation (NC)<br />

CSER05<br />

to schedule the evaluation. (There is<br />

documentation of repeated attempts<br />

to make contact) (C)<br />

Documented delays in making contact with<br />

parents to schedule the evaluation (C)<br />

CSER06<br />

Parents refused or repeatedly did not<br />

make the child available for evaluation<br />

(C)<br />

Parents refused or repeatedly did not make<br />

the child available for evaluation (C)<br />

CSER07<br />

Evaluator delays in completing the<br />

evaluation (NC)<br />

Extended time line met for student<br />

Evaluator delays in completing the<br />

evaluation (NC)<br />

who transferred to this school district Extended time line met for student who<br />

CSER08 after the evaluation period. Parent transferred to this district after eval period<br />

and school district agreed in writing to<br />

the extended time period. (C)<br />

began (C)<br />

CSER09<br />

Delays in scheduling CSE meetings<br />

(NC)<br />

The evaluation was completed and<br />

the CSE meeting to discuss<br />

evaluation results was scheduled to<br />

Delays in scheduling CSE meetings (NC)<br />

occur within 60 calendar days from Eval completed on time, postponed due to<br />

CSER10 the date of written parent consent to parents documented request or emergency<br />

evaluate the student, but postponed<br />

due to documented request by the<br />

parents or documented emergency<br />

school closing (C)<br />

school closing (C)<br />

280 Student Information Repository System Manual for 2010–11 Version 6.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!