66<br />

each step. The analysis is carried out on the basis of data directly collected in<br />

SELEKTİF TEKNOLOJİ Co. Inc. Ltd. The work is realised in collaboration with<br />

Marmara University Engineering Faculty.<br />

Selective surface is made of electrochemically treated and coated copper sheet<br />

(thickness:0.001 m, width: 1 m). A copper roll is treated to obtain solar selectivity<br />

in a continuous system. 1m per minute is assumed as flow rate. 4400 hours per year<br />

is assumed as system production time for 250.000 m 2 selective surface production.<br />

All the treatment baths are made of polypropylen.<br />

The direct mean power consumption during production process ( 18 kW for pretreatment<br />

of the surface, 28 kW for coating and 7 kW for nano coating, thermal<br />

treatments and rolling) was 50 kW . A building of 300 m 2 with two floor is assumed<br />

for factory plant<br />

10% of the product is accepted as wastes. Wastes will be delivered to a company<br />

that take care about disposal. 95% of the selective surface would be recycled in<br />

their end-life.<br />

All the calculation is realized using Sima Pro LCA programmes.<br />

The energy analysis concerns with the energy flows occurring during life cycle of<br />

the product.<br />

2.23E3 kg<br />

Nickel, 99.5%, at<br />

plant/GLO U<br />

5.27%<br />

5.07E4 MJ<br />

Electricity, high<br />

voltage, production<br />

UCTE, at grid/UCTE<br />

1.98%<br />

5.25E4 MJ<br />

Electricity,<br />

production mix<br />

UCTE/UCTE U<br />

2.03%<br />

Percentage of Total Energy Requirement from Cradle to Gate<br />

0.05 p<br />

2 Katli 300 m2<br />

Fabrika<br />

2.21%<br />

7.55E4 MJ<br />

Electricity,<br />

hydropower, at<br />

run-of-river power<br />

1.02%<br />

5.14E4 MJ<br />

Heavy fuel oil,<br />

burned in industrial<br />

furnace 1MW,<br />

0.873%<br />

1.66E3 kg<br />

Heavy fuel oil, at<br />

regional<br />

storage/RER U<br />

1.11%<br />

1.7E3 kg<br />

Heavy fuel oil, at<br />

refinery/RER U<br />

1.11%<br />

1 p<br />

200000 m2 Yuzey<br />

100%<br />

2.24E5 kg<br />

Copper sheet<br />

production of<br />

0.1mm thickness<br />

60.1%<br />

2.24E5 kg<br />

Copper sheet,<br />

technology mix,<br />

consumption mix, at<br />

51%<br />

1 p<br />

Yuzey Temizleme<br />

Elektrik Enerjisi<br />

10.7%<br />

1 p<br />

Ni Islemleri Elektrik<br />

Enerjisi<br />

16.6%<br />

1.1E6 MJ<br />

Electricity mix, AC,<br />

consumption mix, at<br />

consumer, 1kV -<br />

41%<br />

1 p<br />

Son Yuzey Islemleri<br />

Elektrik Enerjisi<br />

1.18%<br />

1 p<br />

Kurutma Elektrik<br />

Enerjisi<br />

1.78%<br />

1 p<br />

Sarma Elektrik<br />

Enerjisi<br />

1.78%