24.06.2014 Views

PIMS Manual_Vol 1_V1.0 - Sayre Area School District

PIMS Manual_Vol 1_V1.0 - Sayre Area School District

PIMS Manual_Vol 1_V1.0 - Sayre Area School District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pennsylvania Information<br />

Management System<br />

Pennsylvania<br />

Department of Education<br />

<strong>PIMS</strong> <strong>School</strong> Calendar Template Specifications<br />

Field<br />

No.<br />

10 10<br />

11 10<br />

12 10<br />

13 10<br />

14 3<br />

15 3<br />

16 3<br />

17 3<br />

Max<br />

Length<br />

Name R/O/CR Code Definition Business Rules Sample / Valid Value<br />

CALENDAR END<br />

DATE<br />

INSTRUCTION<br />

START DATE<br />

INSTRUCTION<br />

END DATE<br />

GRADUATION<br />

CEREMONY DATE<br />

NUMBER OF<br />

SCHEDULED<br />

SCHOOL DAYS<br />

INSTRUCTIONAL<br />

MINUTES IN<br />

STANDARD DAY<br />

TOTAL DAYS IN<br />

SESSION LOST<br />

DUE TO STRIKE<br />

TOTAL DAYS IN<br />

SESSION LOST<br />

DUE TO ACT 80<br />

R<br />

U, M<br />

The date of the last day on the original<br />

calendar; this date could be an approved<br />

full-day Act 80 day prior to the first day of<br />

instruction.)<br />

R U, M The date of the first day of instruction<br />

R U, M The date of the last day of instruction<br />

CR<br />

R<br />

R<br />

R<br />

R<br />

U<br />

U, M<br />

U, M<br />

U, D<br />

U, D<br />

The date of the seniors’ graduation<br />

ceremony<br />

The Graduation Ceremony Date is on or<br />

after the instruction End Date (Field 10).<br />

The number of instructional days on the<br />

original calendar – planned student<br />

instructional days plus PDE-approved Act<br />

80 full days<br />

The number of instructional minutes in a<br />

regular school day<br />

The number of instructional days lost due<br />

to a work stoppage<br />

The number of instructional days lost due<br />

to PDE-approved full-day Act 80<br />

dismissals<br />

Do not include any approved Act 80 fullday<br />

dismissals that were not used.<br />

All dates must be entered in ISO<br />

format: YYYY-MM-DD<br />

Instruction Start Date is on or after<br />

the Calendar Start Date (Field 9).<br />

All dates must be entered in ISO<br />

format: YYYY-MM-DD<br />

All dates must be entered in ISO<br />

format: YYYY-MM-DD<br />

This field is required for calendars<br />

that include grade 12 students.<br />

All dates must be entered in ISO<br />

format: YYYY-MM-DD<br />

Example: 2011-06-13<br />

Example: 2010-08-27<br />

Example: 2010-06-13<br />

Example: 2010-06-30<br />

Report days as whole numbers. Example: 185<br />

Report minutes as whole numbers. Example: 320<br />

Report days as whole numbers. Example: 0<br />

Report days as whole numbers. Example: 4<br />

Version 1 Page 40<br />

Published 7/21/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!