13.01.2015 Views

International Trade in Services.pdf - DSpace at Khazar University

International Trade in Services.pdf - DSpace at Khazar University

International Trade in Services.pdf - DSpace at Khazar University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Build<strong>in</strong>g Empires Overseas 193<br />

Table 6.2. Procedures, Time, and Costs Involved <strong>in</strong> Build<strong>in</strong>g a Warehouse,<br />

Russian Feder<strong>at</strong>ion, 2008<br />

Time to Cost to<br />

complete complete<br />

No. Procedure (days) (Rub)<br />

1 Apply for act of permission for use to Department<br />

of City Plann<strong>in</strong>g Document<strong>at</strong>ion Development <strong>at</strong><br />

MoskomArchitektura 1 n.a.<br />

2 Request and obta<strong>in</strong> situ<strong>at</strong>ion plan of district and conclusion for a<br />

District Land Commission from Architecture Plann<strong>in</strong>g Department 15 43,680<br />

3 Request and obta<strong>in</strong> a conclusion from Territorial Union of Land<br />

Use Regul<strong>at</strong>ion (TOP3) 15 4,330<br />

4 Request and obta<strong>in</strong> a decision by the District Land Commission<br />

on land plot provision and city plann<strong>in</strong>g regul<strong>at</strong>ion 30 n.a.<br />

5 Request and obta<strong>in</strong> clearance of draft disposition of Prefect<br />

with the Architecture Plann<strong>in</strong>g Department (APD) 7 n.a.<br />

6 Request and obta<strong>in</strong> clearance of draft disposition of Prefect<br />

with the local government 7 n.a.<br />

7 Request and obta<strong>in</strong> clearance of draft disposition with the<br />

Territorial Union of Land Use Regul<strong>at</strong>ion (TOP3) 7 n.a.<br />

8 Request and obta<strong>in</strong> the disposition on prepar<strong>at</strong>ion of an act of<br />

permission for use (AP ) by the Prefect 7 n.a.<br />

9 Request and obta<strong>in</strong> a conclusion on compliance of proposed<br />

build<strong>in</strong>g with specified city plann<strong>in</strong>g and territory use regul<strong>at</strong>ions 152 4,500<br />

10 a Request and obta<strong>in</strong> technical conditions from w<strong>at</strong>er and<br />

sewage services 45 17,673<br />

11 a Request and obta<strong>in</strong> technical conditions for an electricity<br />

connection with MosEnergo 30 5,490,520<br />

12 a Request and obta<strong>in</strong> technical conditions to connect to<br />

telephone l<strong>in</strong>e 30 3,000<br />

13 a Request and obta<strong>in</strong> approval from MoskomArchitektura on<br />

eng<strong>in</strong>eer<strong>in</strong>g of the facility 14 4,500<br />

14 Request and obta<strong>in</strong> an act of permission for use (AP ) from<br />

MoskomArchitectura 30 6,700<br />

15 Request and obta<strong>in</strong> disposition of Prefect on the <strong>in</strong>ception of<br />

construction design (decision on construction) 60 n.a.<br />

16 Request and obta<strong>in</strong> approval of design conditions by the<br />

Department of Well-Be<strong>in</strong>g of MoskomArchitektura 7 53,300<br />

17 a Request and obta<strong>in</strong> approval of design conditions by Department<br />

of Prepar<strong>at</strong>ion of Project Approvals of MoskomArchitektura 14 12,100<br />

18 a Request and obta<strong>in</strong> approval of design conditions by local<br />

government 7 n.a.<br />

19 a Request and obta<strong>in</strong> approval of design conditions by the<br />

Prefect’s Office 14 n.a.<br />

20 a Request and obta<strong>in</strong> approval of design conditions by the<br />

Emergency Situ<strong>at</strong>ion and Civil Defense Department 14 14,728<br />

N<br />

N<br />

(Table cont<strong>in</strong>ues on the follow<strong>in</strong>g pages.)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!