13.01.2015 Views

International Trade in Services.pdf - DSpace at Khazar University

International Trade in Services.pdf - DSpace at Khazar University

International Trade in Services.pdf - DSpace at Khazar University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Build<strong>in</strong>g Empires Overseas 195<br />

42 Receive <strong>in</strong>spection by the Union of Adm<strong>in</strong>istr<strong>at</strong>ive Technical<br />

Inspection (UATI) - III 1 n.a.<br />

43 Receive <strong>in</strong>spection by the Union of Adm<strong>in</strong>istr<strong>at</strong>ive Technical<br />

Inspection (UATI) - IV 1 n.a.<br />

44 Receive <strong>in</strong>spection by the Union of Adm<strong>in</strong>istr<strong>at</strong>ive Technical<br />

Inspection (UATI) - V 1 n.a.<br />

45 Receive <strong>in</strong>spection by the Union of Adm<strong>in</strong>istr<strong>at</strong>ive Technical<br />

Inspection (UATI) - VI 1 n.a.<br />

46 Receive <strong>in</strong>spection by the Union of Adm<strong>in</strong>istr<strong>at</strong>ive Technical<br />

Inspection (UATI) - VII 1 n.a.<br />

47 Connect to w<strong>at</strong>er services 30 n.a.<br />

48 a Request and receive <strong>in</strong>spection by the Energy Supervision Board 1 n.a.<br />

49 Connect to electricity and sign an agreement with Energosbyt 14 n.a.<br />

50 a Request and connect to telephone services 5 n.a.<br />

51 Request and convene the Approval Commission 30 n.a.<br />

52 Request and receive the disposition on oper<strong>at</strong>ion of build<strong>in</strong>g<br />

(occupancy permit) 10 n.a.<br />

53 Request and receive plans from the Bureau of Technical<br />

Inventory (BTI) 30 55,000<br />

54 Register the build<strong>in</strong>g after completion 30 7,500<br />

Source: World Bank (2009a).<br />

Note: n.a. not applicable, no charge.<br />

a. Takes place simultaneously with another procedure.<br />

Table 6.3. Procedures, Time, and Costs Involved <strong>in</strong> Build<strong>in</strong>g a Warehouse, Kenya, 2008<br />

Time to complete Cost to complete<br />

No. Procedure (days) (Ksh)<br />

1 Request and obta<strong>in</strong> a build<strong>in</strong>g permit 50 12,500<br />

2 a Seek approval of project plans and architectural<br />

draw<strong>in</strong>gs from municipal authority 25 100<br />

3 Receive an on-site <strong>in</strong>spection by the<br />

municipal authority 5 100<br />

4 Obta<strong>in</strong> an occupancy certific<strong>at</strong>e 14 500<br />

5 Apply for w<strong>at</strong>er and sewerage connection 1 1,100<br />

6 Pay w<strong>at</strong>er and sewerage <strong>in</strong>stall<strong>at</strong>ion costs<br />

and obta<strong>in</strong> connection 30 6,000<br />

7 a Request electricity connection from the<br />

local electricity provider 1 2,000<br />

8 Receive an on-site <strong>in</strong>spection by the local<br />

electricity provider 1 n.a.<br />

9 Obta<strong>in</strong> electricity connection 21 n.a.<br />

10 Apply and pay for telephone connection 5 2,300<br />

Source: World Bank (2009b).<br />

Note: n.a. not applicable, no charge.<br />

a. Takes place simultaneously with another procedure.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!