Appendix C: Project Delivery: High Lever Project <strong>Plan</strong><br />

High Level Scope<br />

• Site set up including placement of blast screens, establishment of welfare and<br />

compound;<br />

• Breakout of existing concrete and construction of foundation and trenches and<br />

tie in to existing services infrastructure;<br />

• Off site prefabrication of superstructure elements and cladding;<br />

• Erection of superstructure on site;<br />

• Electrical installations including transformers, generator, fuel tank, switchboards,<br />

CCR’s, isolators, small power and lighting, and all associated cabling;<br />

• Cladding of superstructure and installation of permanent doors;<br />

• Service diversions/transfer of load from existing sub-station 56;<br />

• External works.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 66